Project Execution Plan (PEP)
A Project Execution Plan (PEP) is one of the project baseline document and the governing document that establishes the means to execute,
monitor, and control projects for the project operation and management. The PEP is to describe a project specific plan addressing the most
effective method and maximise efficiency in the project execution, and the project specific actions have to be described complying to project
goals, objectives and strategies. The PEP is to define the clear scope of work and other critical responsibilities as agreed in the contract, and
how work to be done is in accordance with the company policies. The PEP is developed by the project key participants led by the project
manager. The PEP should be approved by company management prior to publishing or applying. The PEP is a live document and should be
updated with current and future project plans and procedures.
Table of Content (Typical)
1.0 PROJECT OVERVIEW
1.1 Client and Project Information
1.2 Contract Basis and Terms
1.3 Scope of Work Description
1.4 Project Objective and Goal
1.5 Project Execution Strategy
1.6 Project Cost and Schedule
2.0 PROJECT MANAGEMENT
2.1 Organization and Responsibilities
2.2 Kick-Off and Alignment
2.3 Initial Planning
2.4 Project Baseline Development
2.5 Project Study and Review
3.0 PROJECT ADMINISTRATION AND INFORMATION MANAGEMENT
3.1 Project Communications
3.2 Project Plan and Procedure
3.3 Project Meeting and Report
3.4 Network Requirement
3.5 Knowledge Management
4.0 PROJECT CONTROLS / ESTIMATING
4.1 Estimating
4.2 Scheduling and Schedule Control
4.3 Cost Control
4.4 Progress Measurement
4.5 Review and Approval
5.0 ENGINEERING / DESIGN
5.1 Design Basis
5.2 Design Deliverables
5.3 Design Control
5.4 Project Document and Data Management
6.0 CONTRACT MANAGEMENT
6.1 Project Sub-contracting Plan
6.2 Claim Avoidance Plan
7.0 PROCUREMENT
7.1 Material Management Plan
7.2 Purchasing
7.3 Expediting
7.4 Inspection
7.5 Logistic Management
8.0 CONSTRUCTION
8.1 Home Office Construction Planning
8.2 Temporary Facility Plan
8.3 Construction Execution Planning
8.4 Construction Organisation
8.5 Construction Administration
8.6 Field Engineering
8.7 Field Material Control
8.8 Mechanical Completion/ Pre-commissioning
9.0 OPERATION
9.1 Commissioning
9.2 Start-up
9.3 Performance Test
10.0 CHANGE MANAGEMENT
10.1 Change Management Basis
10.2 Change Work Flow
11.0 RISK MANAGEMENT
11.0 Project Risk Identification
11.1 Risk Workshop
12.0 QUALITY MANAGEMENT
12.1 Audit Plan and Programme
12.2 Corrective Action/ Preventive Action Programme
13.0 HEALTH, SAFETY, ENVIRONMENTAL AND SECURITY
13.1 HSE Philosophy
13.2 Design HSE
13.3 Site HSE
13.4 Security Plan
14.0 TURNOVER
14.1 Facility Hand Over
14.2 Document Hand Over
15.0 PROJECT CLOSE-OUT
15.1 Contracts Close-out
15.2 Certificates
15.3 Close-out Book
16.0 LIST OF ATTACHMENTS
1. Scope of Facilities Summary
2. Scope of Services Summary
3. Block Flow Diagram
4. Project Summary Schedule
5. Project Milestones
6. Project Organization Chart
7. Resource Mobilisation Plan
8. Work Breakdown Structure (WBS)
9. Project Deliverables List
10. Applicable Code and Requirement
11. Project Cost
12. Project Study and Review Reports
13. Bidder List
14. Sub-contractor List
To be developed continuously...including template and standard formats