0% found this document useful (0 votes)
69 views19 pages

Apu Depreservation

Uploaded by

Shikha Dhurve
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views19 pages

Apu Depreservation

Uploaded by

Shikha Dhurve
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

JOB CARD PACKAGE TITLE: AIC -

APU DEPRESERVATION Tail Number - MSN -


FSN
SR-021 - 03822 - 910

MPD Reference Title DocType

APU Preservation / Storage / Return to Service


NONE 49-20-00-600-803-A AMM
(131-9(A))

Job Cards Package is made of: 1 job cards.

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 2


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
JOB CARD PACKAGE TITLE: AIC -
APU DEPRESERVATION Tail Number - MSN -
FSN
SR-021 - 03822 - 910

INTENTIONALLY LEFT BLANK

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 2


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999

EMB SB 49-1082 for A/C 551-551


TASK 49-20-00-600-803-A
APU Preservation / Storage / Return to Service (131-9(A))
FIN:

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999
4005KM

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999

EMB SB 49-1082 for A/C 551-551

WARNING: MAKE SURE THAT YOU HAVE THE CORRECT FIRE FIGHTING
EQUIPMENT AVAILABLE.

WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY


THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR
LOCAL REGULATIONS.

WARNING: MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING
NOTICES ARE IN POSITION BEFORE YOU START A TASK ON OR
NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND RELATED DOORS
- THE CARGO DOORS
- OTHER COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO
PERSONS AND/OR DAMAGE TO EQUIPMENT.

WARNING: DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO


PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).

WARNING: WHILE THE APU OPERATES, DO NOT GO INTO THESE AREAS:

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

- THE AREA BEHIND THE APU EXHAUST DUCT: 25m (82ft.)


REARWARD OF THE DUCT, MORE THAN 3m (10ft.) ABOVE
THE GROUND, AND THE WIDTH OF THE HORIZONTAL
STABILIZER
- THE AREA AROUND THE APU AIR-INTAKE: 2m (7ft)
AROUND THE INTAKE
- THE AREA OF THE OIL-COOLER OUTLET.
THERE IS A RISK OF INJURY IF YOU GO INTO THESE AREAS.

CAUTION: DO NOT DO AN UNCONTROLLED PRESERVATION IN A SALT AIR


ENVIRONMENT. SALT AIR ENVIRONMENT CAN CAUSE
CORROSION.

CAUTION: IF YOU DID NOT DO THE DEPRESERVATION OF THE APU:


- ONLY CLOSE THE CIRCUIT BREAKERS TO DO THE
NECESSARY OPERATIONAL TESTS, AND
- OPEN THEM AGAIN AFTER YOU COMPLETE THE
OPERATIONAL TESTS.
IF YOU DO NOT OBEY THESE INSTRUCTIONS, AN ACCIDENTAL
START OF THE APU CAN OCCUR, WHICH CAN CAUSE DAMAGE
TO THE APU.

1. Reason for the Job


The preservation procedure of the APU prevents internal and external
corrosion and deterioration when the APU is not used. The preservation
procedure will give the maximum protection and must be done in clean and dry
conditions.
The de-preservation procedure removes preservation materials from the
Auxiliary Power Unit (APU) to make the APU serviceable again.

2. Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

REFERENCE QTY DESIGNATION

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

REFERENCE QTY DESIGNATION


No specific 1 ACCESS PLATFORM 4M (13 FT)-
ADJUSTABLE
No specific 1 CONTAINER 10 L(2 1/2 USGAL)
No specific AR COVER - PROTECTION
No specific 1 INDICATOR-HUMIDITY
No specific AR SAFETY CLIP - CIRCUIT BREAKER
No specific AR WARNING NOTICE(S)
98L12003001000 AR HARNESS,SAFETY

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999

EMB SB 49-1082 for A/C 551-551


B. Consumable Materials

REFERENCE DESIGNATION

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999
08BBB1 Non Aqueous Cleaner-- Petroleum Based -
No specific Desiccant-Silica Gel

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999

EMB SB 49-1082 for A/C 551-551


C. Work Zones and Access Panels

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

ZONE/ACCESS ZONE DESCRIPTION


315 TAIL CONE APU AND ACCESSORY
COMPARTMENT
316 TAIL CONE APU AND ACCESSORY
COMPARTMENT

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999
315AL, 316AR

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999

EMB SB 49-1082 for A/C 551-551


D. Referenced Information

REFERENCE DESIGNATION

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999
Ref. Installation of the Aircraft Protection
10-11-00-555-013-A Equipment
Ref. Removal of the Aircraft Protection Equipment
10-11-00-555-014-A
Ref. Oil Sampling for Analysis
12-32-49-281-001-A
Ref. Installation of the APU Generator
24-23-51-400-001-A
Ref. Installation of the APU Generator with the
24-23-51-400-001- Minilift Hoist
A01

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

REFERENCE DESIGNATION
Ref. Energize the Ground Service Network from
24-42-00-861-001-A the External Power
Ref. De-energize the Ground Service Network
24-42-00-862-001-A Supplied from the External Power
Ref. Operational Test of the APU Fuel-Pump
28-22-00-710-001-A System on Ground to Purge the Fuel Line
Ref. Put the Related Hydraulic System in the
29-00-00-864-001-A Depressurized Configuration before
Maintenance Action
Ref. Cleaning of the APU Compartment with
49-00-00-100-003-A installed APU (131-9(A))
Ref. Manual Rotation of the APU (131-9(A))
49-00-00-550-802-A
Ref. Operational Test of the APU
49-00-00-710-010-A
Ref. Dry Motoring of the APU (131-9(A))
49-00-00-860-807-A
Ref. APU No Load Operation (131-9(A))
49-00-00-860-809-A
Ref. Cleaning of the APU Air Intake (131-9(A))
49-16-00-100-005-A
Ref. APU Borescope Inspection (131-9(A))
49-20-00-200-003-A
Ref. Replacement of the Fuel Filter (131-9(A))
49-32-41-920-001-A
Ref. Check Oil Level and Replenish (131-9(A))
49-90-00-600-007-A
Ref. Remove and Discard Oil Filter Elements
49-91-41-200-002-A (8069KM) and (8076KM)
Ref. Removal of the Drain Plug (131-9(A))
49-91-42-000-003-A

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 5 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

REFERENCE DESIGNATION
Ref. Inspection of the Metal Chip Detector
49-91-42-200-004-A (131-9(A))
Ref. Installation of the Drain Plug (131-9(A))
49-91-42-400-003-A
Ref. Opening of the APU Access Doors
52-41-00-010-001-A
Ref. Closing of the APU Access Doors
52-41-00-410-001-A

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999

EMB SB 49-1082 for A/C 551-551


3. Job Set-up

SUBTASK 49-20-00-941-061-A
A. Safety Precautions
(1) Make sure that the APU fire and overheat detection-system
and the APU Fire-Extinguishing system are serviceable.
(2) Follow the Warning related to the Safety Precautions when the
APU operates.
(3) Preservation information:

Period/Status Requirement Reference


0 - 30 DAYS No preservation
required
Up to 3 months Preserve Do Paras 3.B. -
3.C. - 3.D. - 4.B. -
5.A. - 5.C.

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 6 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

Period/Status Requirement Reference


Up to 12 Preserve Do Paras 3.B. -
months 3.C. - 3.D. - 4.C. -
5.A. - 5.C.
Up to 24 Preserve Do Paras 3.B. -
months 3.C. - 3.D. - 4.D. -
5.A. - 5.C.
APU off wing Follow supplier -
instructions
Preservation Preserve within 5 Refer to paragraph
compromised days 4.
Others Preservation Refer to paragraph
avoidance 4.A.
Return to De-preservation Do Paras 3.B. -
service 3.D. - 4.E. - 5.A.
-5.B. - 5.C.

NOTE: The preservation time starts from the last APU


operation.

SUBTASK 49-20-00-860-100-A
B. Aircraft Maintenance Configuration
(1) Energize the ground service network
Ref. AMM TASK 24-42-00-861-001.
(2) On the overhead panel, on the APU section of panel 25VU,
make sure that the APU MASTER SW pushbutton switch is
released (the ON legend is off).
(3) On the overhead panel, on the APU section of panel 25VU, put
the WARNING NOTICE(S) in position to tell persons not to
start the APU.
(4) Make sure that the hydraulic systems are depressurized
Ref. AMM TASK 29-00-00-864-001.

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 7 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

SUBTASK 49-20-00-865-101-A

WARNING: BEFORE YOU OPEN THESE CIRCUIT BREAKERS (1QF,


2QF, 3QC), MAKE SURE THAT THE "APU MASTER"
SWITCH IS SET TO THE "OFF" POSITION. IF YOU DO NOT
DO THIS, THE APU FUEL ISOLATION-VALVE WILL STAY
OPEN AND FUEL CAN FLOW OUT. THIS CAN CAUSE A
DANGEROUS RISK OF FIRE.
C. Open, safety and tag the circuit breaker(s) that follow(s). Use the
SAFETY CLIP - CIRCUIT BREAKER as necessary.

PANEL DESIGNATION FIN LOCATION

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
APU/FUEL/LP VALVE/
121VU 1QF M40
CTL
APU/FUEL/LP VALVE/
121VU 2QF M39
SPLY
121VU APU/FUEL/PUMP/CTL 3QC M38

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999

EMB SB 49-1082 for A/C 551-551


SUBTASK 49-20-00-010-076-A
D. Get Access

WARNING: BEFORE YOU START WORK, YOU MUST PUT ON A


SAFETY HARNESS AND ATTACH IT TO THE
ACCESS PLATFORM. WITHOUT A SAFETY

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 8 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

HARNESS, YOU CAN FALL. THIS CAN KILL YOU


OR CAUSE YOU INJURY.
(1) Put on and attach the HARNESS, SAFETY before you start
work in the work area.
(2) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in
position below APU access doors 315AL and 316AR.
(3) Open APU access doors 315AL and 316AR
Ref. AMM TASK 52-41-00-010-001.
(4) Set light switch 11LJ to the ON position.

4. Procedure

SUBTASK 49-20-00-620-062-A
A. Conditions in which the preservation of the APU installed on the aircraft
is not necessary:
(1) If the aircraft is in this (these) weather condition(s), it is your
decision to do or not do the preservation procedure:
- Temperature less than 30 deg.F (-1.11 deg.C) or more
than 125 deg.F (51.67 deg.C), and/or
- Humidity more than 40 per cent, and/or
- Salt air.

(a) If you do not do the preservation procedure, do one of


the three APU rotation methods that follow at intervals
of seven days to prevent the APU seizure:
- Manual rotation of the APU Ref. AMM TASK
49-00-00-550-802, or
- Dry-motoring of the APU Ref. AMM TASK
49-00-00-860-807, or
- Operation of the APU with no load Ref. AMM
TASK 49-00-00-860-809.

(2) Do not do the preservation procedure if the storage of the APU


is for less than 30 days.
(3) It is not necessary to do the APU preservation for two years if:

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 9 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

(a) You do the dry-motoring of the APU at intervals of one


month Ref. AMM TASK 49-00-00-860-807.

(4) To prevent the preservation of the APU for more than two
years, do the procedures that follow, at intervals of one month.
Do one procedure each month, one after the other:

(a) Dry-motoring of the APU Ref. AMM TASK


49-00-00-860-807

(b) Operation of the APU with no load Ref. AMM TASK


49-00-00-860-809.

SUBTASK 49-20-00-620-063-A
B. Preservation of the APU for a Maximum Storage Time of Three Months
(1) Do a General Visual Inspection (GVI) of the APU and the APU
compartment and make sure that there are no oil leaks:

(a) If you find oil leaks, do the steps that follow:

1 Repair all the oil leaks.

2 Clean the APU externally.

3 Clean the APU compartment Ref. AMM TASK


49-00-00-100-003.

4 Clean the APU air intake Ref. AMM TASK


49-16-00-100-005.

(2) Do a GVI of the APU and the APU compartment and make sure
that there are no fuel leaks:

(a) If you find fuel leaks, do the steps that follow:

1 Repair all the fuel leaks.

2 Clean the APU externally.

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 10 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

3 Clean the APU compartment Ref. AMM TASK


49-00-00-100-003.

4 Clean the APU air intake Ref. AMM TASK


49-16-00-100-005.

(3) Do a GVI of the APU inlet plenum to find Foreign Object


Damage (FOD):

(a) If you find FOD:

1 Do a borescope inspection of the APU power


plant Ref. AMM TASK 49-20-00-200-003.

a If you find no damage:


- Continue the APU preservation
procedure.

(4) Drain the oil as follows:

(a) Do the oil level inspection check and the servicing a


minimum of 15 minutes after the last shutdown. Do not
re-service before the APU is operated again.

(b) Position the CONTAINER 10 L(2 1/2 USGAL) below the


drain plug.

(c) Open the filler cap to vent the APU and let the oil to
drain.

(d) Remove the drain plug and drain the oil into the
CONTAINER 10 L(2 1/2 USGAL) Ref. AMM TASK
49-91-42-000-003.

(e) If you think that the condition of the drained oil is not
correct, do a sampling of the APU oil for analysis Ref.
AMM TASK 12-32-49-281-001.

(f) Install the drain plug Ref. AMM TASK


49-91-42-400-003.

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 11 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

(5) Do not replace the oil filter and do not fill the APU reservoir
after you drain the oil.
(6) Add the desiccant bags:

CAUTION: DO NOT PUT THE DESICCANT IN THE


BLEED AIR DUCTS. IT CAN CAUSE SMELL
IN THE CABIN.
(a) Add 1 lb (0.454 kg) of Desiccant-Silica Gel to the gas
path.

NOTE: It is possible to add 1 lb (0.454 kg) of


desiccant silica gel between the air inlet and
the exhaust.

(7) Put the WARNING NOTICE(S) in position in the cockpit to tell


persons that the APU is not serviceable.
(8) Clean the engine and the APU compartment:

(a) Clean the engine and the APU compartment from


unwanted fuel and oil with Non Aqueous Cleaner--
Petroleum Based - (Material Ref. 08BBB1).

(9) Attach the COVER - PROTECTION to the air inlets and outlets
Ref. AMM TASK 10-11-00-555-013.
(10) Record in the logbook that the APU preservation procedure is
completed.

SUBTASK 49-20-00-620-064-A
C. APU Preservation for Storage during a Maximum 12 Months
(1) Do the steps for the APU preservation storage during a
maximum of three months.
(2) Install the sealing caps:

CAUTION: PUT PLASTIC CAPS OR PLUGS ON ALL


FUEL AND/OR LUBRICATION SYSTEM
COMPONENTS AND LINES. IF YOU USE

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 12 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

TAPE, CLOTH, OR METAL CAPS ON THEM,


YOU CAN DAMAGE THE APU.
(a) Attach the COVER - PROTECTION to the air inlets and
outlets Ref. AMM TASK 10-11-00-555-013.

(3) Clean the APU:

(a) Remove all the oil and fuel from the external surface of
the APU with Non Aqueous Cleaner-- Petroleum
Based - (Material Ref. 08BBB1).

(4) Attach the WARNING NOTICE(S) in position on the APU to tell


persons that preservation procedure for the APU is completed.
(5) Install the INDICATOR-HUMIDITY on the APU. Make sure that
you can see the indicator with the APU in the storage position.
(6) Do a check of the humidity indicator every 30 days:

(a) If the relative humidity is less than 40 per cent, no


maintenance action is necessary until the next check.

(b) If the relative humidity is more than 40 per cent do a


visual inspection of the APU:
- If you find corrosion, return the APU to a
maintenance facility.
- If you find no signs of corrosion, replace the
desiccant bags and INDICATOR-HUMIDITY.

SUBTASK 49-20-00-550-061-A
D. APU Preservation for Storage Up to 24 Months
(1) Do the steps for the APU preservation storage up to 12
months.
(2) Add one pound (0.454 kg) of Desiccant-Silica Gel to the gas
path.

NOTE: The total desiccant quantity will be two pounds


(0.908 kg).

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 13 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

NOTE: The desiccant can be added between the air inlet


and the exhaust.

SUBTASK 49-20-00-550-062-A
E. De-preservation of the Engine

NOTE: This step is only necessary after the APU preservation.


(1) Remove any blanking caps or protective covers Ref. AMM
TASK 10-11-00-555-014.
(2) Remove the desiccant and the INDICATOR-HUMIDITY from
the gas path.
(3) Make sure that the APU generator is correctly attached Ref.
AMM TASK 24-23-51-400-001.
(4) Do a check of the metal chip detector for unwanted metal Ref.
AMM TASK 49-91-42-200-004.
(5) Do a check of the oil filter elements for contamination:

(a) If you find contamination on the oil filter elements,


replace it Ref. AMM TASK 49-91-41-200-002.

(6) Make sure that the oil level is correct Ref. AMM TASK
49-90-00-600-007.
(7) Do a check of the fuel filter element for contamination:

(a) If you find contamination on the fuel filter element,


replace it Ref. AMM TASK 49-32-41-920-001.

(b) If there is no contamination on the fuel filter element, it


is not necessary to replace the fuel filter element.

(8) Purge the APU fuel line Ref. AMM TASK 28-22-00-710-001.
(9) Do the operational test of the APU Ref. AMM TASK
49-00-00-710-010:

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 14 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

(a) Run the APU for at least five minutes.

(10) Do a check of the APU and the APU connections for fuel, oil
and air leaks during operation:

(a) Leaks of fuel, oil or air during APU operation are not
permitted.

(11) Do a check of the metal chip detector for unwanted metal again
Ref. AMM TASK 49-91-42-200-004.
(12) Do a check of the oil filter elements for contamination again:

(a) If you find contamination on the oil filter elements,


replace it Ref. AMM TASK 49-91-41-200-002.

(13) Do a check of the fuel filter element for contamination again:

(a) If you find contamination on the fuel filter element,


replace it Ref. AMM TASK 49-32-41-920-001.

(b) If there is no contamination on the fuel filter element, it


is not necessary to replace the fuel filter element.

(14) Do a check of the oil level Ref. AMM TASK 49-90-00-600-007.


(15) Record in the logbook to show that the APU de-preservation
procedure has been done.
(16) Return the serviceable APU to operation.

5. Close-up

SUBTASK 49-20-00-410-087-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and
other items.
(2) Set light switch 11LJ to the OFF position.
(3) Close APU access doors 315AL and 316AR
Ref. AMM TASK 52-41-00-410-001.

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 15 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

(4) Remove the ground support and maintenance equipment, the


special and standard tools and all other items.
(5) Do not remove the warning notice if the APU is not de-
preserved.

SUBTASK 49-20-00-865-102-A
B. Remove the SAFETY CLIP - CIRCUIT BREAKER and the tag(s) and
close this (these) circuit breaker(s):

PANEL DESIGNATION FIN LOCATION

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999
121VU APU/APU/CTL 2KD L42
121VU APU/ECB/SPLY 1KD L41
APU/FUEL/LP VALVE/
121VU 1QF M40
CTL
APU/FUEL/LP VALVE/
121VU 2QF M39
SPLY
121VU APU/FUEL/PUMP/CTL 3QC M38

** ON A/C FSN 002-050, 105-112, 114-150, 201-300, 401-450, 456-500,


551-850, 901-901, 903-903, 908-908, 910-910, 912-913, 917-999

EMB SB 49-1082 for A/C 551-551


SUBTASK 49-20-00-860-101-A
C. Put the aircraft back to its initial configuration.
(1) After maintenance, put the hydraulic systems back to the
normal configuration
Ref. AMM TASK 29-00-00-864-001.
(2) De-energize the ground service network
Ref. AMM TASK 24-42-00-862-001.

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 16 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2025
AMM - AIC - A318/A319/A320/A321 TASK:
49-20-00-600-803-A
49-20-00-03 CONF 16
Tail Number - MSN - TITLE:
MPD TASK:
FSN: 49-20-00-600-803-A - APU Preservation / Storage / Return to NONE
SR-021 - 03822 - 910 Service (131-9(A))

MECH. INSP.

© *** END OF CARD ***

JCP Title: APU CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 17 of 17


DEPRESERVATION PRINT DATE: Aug 19/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE

You might also like