NH-3 8-Laning Project Inspection Report

Uploaded by

muttaki555
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views28 pages

NH-3 8-Laning Project Inspection Report

Uploaded by

muttaki555
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Project Name Construction of 8 laning of existing 4 lane Va

Client National Highways Authority of India


Concessionaire MSRDC Infrastructure Projects Ltd
Independent Engineer Lion Engg Consultants Pvt. Ltd. JV with Techn
EPC Contractor MEPIDL-MCL JV
Date of Submission:- 10-Apr-24

Date of Inspection:- 11-Apr-24


Sr. Date of
RFI No. Item Name
No. Submission

1 MSRDC/VTR/HW/ 10-Apr-24

2 MSRDC/VTR/HW/ 10-Apr-24

3 MSRDC/VTR/HW/ 10-Apr-24

4 MSRDC/VTR/HW/ 10-Apr-24

8 MSRDC/VTR/HW/ 10-Apr-24

2 MSRDC/VTR/STR/ 10-Apr-24

MSRDC/VTR/STR/ 10-Apr-24

MSRDC/VTR/STR/ 10-Apr-24

MSRDC/VTR/STR/ 10-Apr-24
6 MSRDC/VTR/STR/ 10-Apr-24

MSRDC/VTR/COS/STR/ 10-Apr-24

MSRDC/VTR/COS/STR/ 10-Apr-24

MSRDC/VTR/COS/STR/ 10-Apr-24

MSRDC/VTR/COS/STR/ 10-Apr-24

MSRDC/VTR/COS/STR/ 10-Apr-24

MSRDC/VTR/COS/STR/ 10-Apr-24

MSRDC/VTR/COS/STR/ 10-Apr-24

MSRDC/VTR/COS/STR/ 10-Apr-24

MSRDC/VTR/COS/STR/ 10-Apr-24

MSRDC/VTR/COS/STR/ 10-Apr-24

MSRDC/VTR/COS/STR/ 10-Apr-24

10-Apr-24

MSRDC/VTR/COS/STR/ 10-Apr-24

MSRDC/VTR/COS/STR/ 10-Apr-24
1 MSRDC/VTR/LAB/ 10-Apr-24

2 MSRDC/VTR/LAB/ 10-Apr-24

MSRDC/VTR/LAB/772 10-Apr-24

1 MSRDC/VTR/TB/ 10-Apr-24

2 MSRDC/VTR/TB/ 10-Apr-24

3 MSRDC/VTR/TB/ 10-Apr-24

4 MSRDC/VTR/TB/ 10-Apr-24

1 MSRDC/VTR/SUR/24 10-Apr-24
f existing 4 lane Vadape to Thane from KM 539.202 to KM 563.000 section of NH-3(New NH-848) in the
ity of India
ects Ltd
. Ltd. JV with Technogem Consultant Pvt. Ltd Thane & In association with Real Strength Infrastructure

Date of Time of
Inspection Inspection

11-Apr-24 4:30 PM

11-Apr-24 6:00 PM

11-Apr-24 11:00 AM

11-Apr-24 11:30 AM

11-Apr-24 2:30 PM

11-Apr-24 10:30 AM

11-Apr-24 11:00 AM

11-Apr-24 1:30 PM

11-Apr-24 4:30 PM
11-Apr-24 3:00 PM

11-Apr-24 2:50 PM

11-Apr-24 4:00 PM

11-Apr-24 6:00 PM

11-Apr-24 2:50 PM

11-Apr-24 2:50 PM

11-Apr-24 4:00 PM

11-Apr-24 6:00 PM

11-Apr-24 2:50 PM

11-Apr-24 4:00 PM

11-Apr-24 6:00 PM

11-Apr-24 2:30 PM

11-Apr-24 2:30 PM

11-Apr-24 2:00 PM

11-Apr-24 2:00 PM
11-Apr-24 12:30 PM

11-Apr-24 11:30 AM

11-Apr-24 1:30 PM

11-Apr-24 11:45 AM

11-Apr-24 12:20 PM

11-Apr-24 5:00 PM

11-Apr-24 3:00 PM

11-Apr-24 5:00 PM

5:30 PM
6:30 PM
0
SUMMARY OF REQU

ne from KM 539.202 to KM 563.000 section of NH-3(New NH-848) in the state of Maharashtra to be exe

ltant Pvt. Ltd Thane & In association with Real Strength Infrastructure

Description of Wo

HIGH

Laying of Dry Lean Concrete (MCW) Loop-3

Laying of Pavement Quality Concrete (SR)

Inspection of Cutting up To Embankment Bottom (SR)

Inspection of Cutting up To Embankment Bottom (MCW)

STRU

level & layout Checking & Excavation & Inspection Of Pouring M15 PCC For Drain (SR)

Checking Reinforcement, shuttering & Pouring M-30 concrete for parapet wall Final lift

Checking Reinforcement, shuttering & Pouring M-30 concrete for Drain Wall(SR)
COS STR
Checking coordinates & boring Checking for Pile Pile Pier (P2) Pile no. 24

founding Level & reinforcement Checking for Pile Pier (P2) Pile no. 24

Checking of concreting for Pile Pier (P2) Pile no. 24

Checking coordinates & boring Checking for Pile Pile Abutment (A2) SR Pile no. 0

founding Level & reinforcement Checking for Pile Pile Abutment (A2) SR Pile no.

Checking of concreting for Pile Pile Abutment (A2) SR Pile no. 09

Checking reinforcement shuttering and pouring concrete for RCC Beam No-25

Checking reinforcement shuttering and pouring concrete for RCC Beam No-26
Q

Plate load test for SBC of MNB A1 Abutmennt

Steel Sampling of Lot No.35 (25 mm, 32mm dia Fe-550D) Company Name- SRJ Peety Steels Pvt

ADMINISTRAT

SUR

OPERATION &

Checking Reinforcement, shuttering & Pouring Concrete for Pier P2 1st Lift
Reinforcement, shuttering checking & Pouring of M-30 grade concrete for A1 & A2 Wall 1st lift
Chainage/Location Side

000+030 000+100 L-3

560+230 560+340 RHS

562+140 562+280 LHS

562+140 562+280 LHS

547+940 548+080 LHS

BC 547+420 RHS

547+850 547+940 LHS


Flyover 542+409
RHS

Flyover 542+409
RHS

Flyover 542+409
RHS

Flyover 542+409
RHS

Flyover 542+409
RHS

Flyover 542+409
RHS

MNB 561+633 RHS

MNB 561+633 RHS


560+567 RHS

542+409 LHS

LHS

TB 559+267 RHS

TB 559+267 RHS

TB 559+267 RHS

TB 559+267 RHS

FOB 561+921 BHS


MNB 547+420 RHS
3100 #DIV/0!
Previous RFI No. Remarks

MSRDC/VTR/HW/10942 10-04-2024
MSRDC/VTR/HW/11330 09-05-2024

MSRDC/VTR/HW/10868 5-Apr-24

MSRDC/VTR/STR/

MSRDC/VTR/STR/14482
MSRDC/VTR/STR/14481

MSRDC/VTR/STR/
MSRDC/VTR/STR/

MSRDC/VTR/COS/STR/

MSRDC/VTR/COS/STR/

MSRDC/VTR/COS/STR/

MSRDC/VTR/COS/STR/

MSRDC/VTR/COS/STR/

MSRDC/VTR/COS/STR/

MSRDC/VTR/COS/STR/

MSRDC/VTR/COS/STR/

MSRDC/VTR/COS/STR/

MSRDC/VTR/COS/STR/

MSRDC/VTR/COS/STR/

MSRDC/VTR/COS/STR/

MSRDC/VTR/COS/STR/

MSRDC/VTR/COS/STR/
MSRDC/VTR/TB/

MSRDC/VTR/TB/

MSRDC/VTR/TB/

MSRDC/VTR/TB/
Box Culvert
[Link]
1
2
3
4
5
6
7
Box Culvert Return Wa
8
9
10
11
12
13
14
15
17

Retaining Wall
[Link]
1
2
3
4
5
6
7
8
9

Drain
[Link]
1
2
3
4
5
6

VUP
[Link]
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Drain
[Link]
1
2
3
4
5
6
Box Culvert
Description of Work
Level & layout & Excavation checking & Pouring M-15 PCC for Box Culvert .
Laying of rubble soling below PCC (MCWL3,L4)
Pouring M-15 PCC for Box Culvert (MCWL3,L4)
Reinforcement, shuttering checking & Pouring of M-30 grade concrete for Raft with bottom hau
Reinforcement, shuttering checking & Pouring of M-30 grade concrete for Wall 1 st Lift (MCWL
Reinforcement, shuttering checking & Pouring of M-30 grade concrete for Wall with Deck Slab
Checking & Inspection for fixing Geosynthetic Sheet
Box Culvert Return Wall
Level & layout & Excavation checking & Pouring M-15 PCC for Box Culvert Return wall (A1 & A
Pouring M-15 PCC for return wall (A1 & A2)
Reinforcement & shuttering checking & Pouring M-30 concrete for return wall Raft (A1 & A2)
Checking Reinforcement, shuttering & Pouring M-30 concrete for return wall 1st lift (A1 & A2)
Checking Reinforcement, shuttering & Pouring M-30 concrete for return wall 2nd lift (A1 & A2)
Checking Reinforcement, shuttering & Pouring M-30 concrete for return wall Final lift (A1 & A
Checking Reinforcement, shuttering & Pouring M-30 concrete for parapet wall 1st & Final lift
CheckingReinforcement, shuttering & Pouring M-30 concrete for parapet wall Final lift
Checking & Inspection for fixing Geosynthetic Sheet

Retaining Wall
Description of Work
Level & layout & Excavation checking & Pouring M-15 PCC for Retaining wall
Laying of rubble soling below PCC
Inspection Of Pouring M-15 concrete for retaining wall PCC
Reinforcement & shuttering checking & Pouring M-30 concrete for Retaining Wall Raft
Checking Reinforcement, shuttering & Pouring M-30 concrete for Retaining Wall 1st lift
Checking Reinforcement, shuttering & Pouring M-30 concrete for Retaining Wall 2nd lift
Checking Reinforcement, shuttering & Pouring M-30 concrete for Retaining Wall Final lift
Checking of Reinforcement, Shuttering and pouring of M-30 concrete for Retaining wall Final li
Checking & Inspection for fixing Geosynthetic Sheet

Drain
Description of Work
level & layout Checking & Excavation & Inspection Of Pouring M15 PCC For Drain (SR)
Inspection & Pouring M15 PCC For Drain (SR)
Checking Reinforcement, shuttering & Pouring M-30 concrete for Drain Raft(SR)
Checking Reinforcement, shuttering & Pouring M-30 concrete for Drain Wall(SR)
Checking Reinforcement, shuttering & Pouring M-30 concrete for Drain Slab(SR)
Checking & Inspection for fixing Geosynthetic Sheet(SR)

VUP
Description of Work
level & layout Checking & Excavation Checking for VUP
Pouring M-15 PCC for VUP
Reinforcement and shuttering for VUP bottom haunch
Checking and Inspection of pouring M-30 concrete for VUP bottom haunch
Reinforcement and shuttering checking for bottom haunch of VUP
Inspection of pouring M-30 concrete for bottom haunch of VUP
Reinforcement & shuttering checking for VUP wall 1st lift
Inspection of pouring M-40 concrete for VUP wall 1st lift
Reinforcement & shuttering checking for VUP wall 2nd lift
Inspection of pouring M-30 concrete for VUP wall 2nd lift
Reinforcement & shuttering checking for VUP wall 3rd lift
Inspection of pouring M-30 concrete for VUP wall 3rd lift
Reinforcement & shuttering checking for top haunch with deck slab For VUP
Inspection of pouring M-40 concrete for top haunch with deck slab For VUP

Drain
Description of Work
level & layout Checking & Excavation & Inspection Of Pouring M15 PCC For Drain (MCW)
Inspection & Pouring M15 PCC For Drain (MCW)
Checking Reinforcement, shuttering & Pouring M-30 concrete for Drain Raft (MCW)
Checking Reinforcement, shuttering & Pouring M-30 concrete for Drain Wall (MCW)
Checking Reinforcement, shuttering & Pouring M-30 concrete for Drain Slab (MCW)
Checking & Inspection for fixing Geosynthetic Sheet (MCW)
Existin
Type Structure [Link]
Box Culvert 1
Box Culvert 2
Box Culvert 3
Box Culvert 4
Box Culvert 5
Box Culvert 6
Box Culvert 7

FOB
Type Structure [Link]
Retaining Wall 1
Retaining Wall 2
Retaining Wall 3
Retaining Wall 4
Retaining Wall 5
Retaining Wall 6
Retaining Wall 7
Retaining Wall 8
Retaining Wall 9

10
11
Type Structure 12
Drain 13
Drain 14
Drain 15
Drain 16
Drain 17
Drain 18
19
20
Type Structure 21
VUP 22
VUP 23
VUP 24
VUP 25
VUP 26
VUP 27
VUP 28
VUP 29
VUP
VUP
VUP
VUP [Link]
VUP 1
VUP 2
3
4
5
6
7
Type Structure 8
Drain 9
Drain 10
Drain 11
Drain 12
Drain
Drain
Existing MCW Box Culvert
Description of Work
Level & layout And excavation checking & Pouring M-15 PCC for Box Culver (Existing MCW)
Laying of rubble soling below PCC (MCWL3,L4)
Pouring M-15 PCC for Box Culvert (MCWL3,L4)
Reinforcement, shuttering checking & Pouring of M-30 grade concrete for Raft with bottom hau
Reinforcement, shuttering checking & Pouring of M-30 grade concrete for Wall 1 st Lift (Existin
Reinforcement, shuttering checking & Pouring of M-30 grade concrete for Wall with Deck Slab
MCW)
Checking & Inspection for fixing Geosynthetic Sheet

Checking coordinates & boring Checking for Pile Abutment (A2) SR Pile no. 08 (R8
founding Level & reinforcement Checking for Pile Abutment (A2) SR Pile no. 08 (R
Checking of concreting for Pile Abutment (A2) SR Pile no. 08 (R8)

Checking reinforcement shuttering and pouring concrete for RCC Beam No-23

FOB
Description of Work
Checking coordinates & boring Checking for Pile Abutment (A2) SR Pile no. 08 (R8)
founding Level & reinforcement Checking for Pile Abutment (A2) SR Pile no. 08 (R8)
Checking of concreting for Pile Abutment (A2) SR Pile no. 08 (R8)
Level & layout And excavation checking of foundation abutment ,Column & PIER of staircase &
Laying of rubble soling for foundation C4, C5 and C6 Column & PIER of staircase. & FOB
Pouring M-15 PCC for foundation C4, C5 and C6 Column & PIER of staircase. & FOB
Checking reinforcement ,shuttering & pouring M-35 concrete for pile cap for .abutment ,Colum
Checking of Reinforcement and shuttering and Pouring concrete for Foundation of Pier P1,P2 ,
Reinforcement & shuttering checking & Pouring Concrete for 1st Lift of Pier & Column of stairc
Checking of Reinforcement and shuttering and Pouring concrete M -35 for 2nd lift of Pier
& Column of staircase & FOB
Checking of Reinforcement and shuttering and Pouring concrete M -35 for 3rd lift of Pier & Co
Checking of Reinforcement and shuttering and Pouring concrete M -35 for 4th lift of Pier & Col
Checking of Reinforcement and shuttering and Pouring concrete M -35 for 5th lift of Pier & Colu
Checking Reinforcement, shuttering & Pouring Concrete for M -35 for Final lift of Pier & Colum
Reinfocement & Shuttering checking for FOB pier P1,P2, P-3 PIER CAP
Inspection for Pouring m-35 concrete for FOB pier P1,P2, P-3 PIER CAP
Checking reinforcement shuttering and pouring concrete for pier P1,P2, P-3 PIER CAP with bra
Reinforcement & shuttering checking & Pouring M-35 concrete for Pedastal P-1 ,P-2, & P-3 Pie
Check Sand Blasting & Painting for FOB steel structure.
FOB steel structure shifting …… to site.
launching of steel structure For Median Span FOB
launching of steel structure For Stair case at both side .
fixing of GI sheet above the Staire case And FOB .
launching of steel structure For Roofing Median Span FOB & staire case .

MNB
Description of Work
Level & layout And excavation checking FOR MNB .
Laying of rubble soling below PCC.
Inspection of Pouring M-15 PCC for MNB
Reinforcement, shuttering checking & Pouring of M-30 grade concrete for Raft with bottom hau
Reinforcement, shuttering checking & Pouring of M-30 grade concrete for Wall 1 st Lift For MN
Reinforcement, shuttering checking & Pouring of M-30 grade concrete for Wall 2ND Lift For M
Reinforcement, shuttering checking & Pouring of M-30 grade concrete for Wall 3rd Lift For MN
Reinforcement, shuttering checking & Pouring of M-30 grade concrete for Wall 4th Lift For MN
Reinforcement, shuttering checking & Pouring of M-30 grade concrete for Wall with Deck Slab
Checking & Inspection for fixing Geosynthetic Sheet
Type Structure
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert

MNB 561+633 RHS


MNB 561+633 RHS
MNB 561+633 RHS

MNB 561+633 RHS

Type Structure
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB

FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB

Type Structure
MNB
MNB
MNB
MNB
MNB
MNB
MNB
MNB
MNB
MNB
MNB
MNB