0% found this document useful (0 votes)
49 views9 pages

Exhibit B - Kitchen-Diner Substructure Drawings

This document contains drawings of the substructure for a kitchen and diner building located at a base camp in Iraq. The location map shows the project site near Duhok. The drawings include a plan approval section listing the project managers from HKN Energy who reviewed and approved the 30% design drawings.

Uploaded by

Alind Hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views9 pages

Exhibit B - Kitchen-Diner Substructure Drawings

This document contains drawings of the substructure for a kitchen and diner building located at a base camp in Iraq. The location map shows the project site near Duhok. The drawings include a plan approval section listing the project managers from HKN Energy who reviewed and approved the 30% design drawings.

Uploaded by

Alind Hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Exhibit B

Kitchen/Diner Substructure Drawings

B OPS CAMP-KITCHEN/DINER
BASEMENT FOUNDATION
CIVIL WORKS
DUHOK
Sarsang Block of Kurdistan Region, Iraq
HKN ENERGY, LTD
PROJECT SITE

MOUSL

ERBIL

LOCATION MAP

PLAN APPROVALS

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-150 - KITCHEN - DINER\pdfs - current\00 Full Package kitchen-diner\30% current
POSITION NAME DATE

HKN CIVILS MANAGER

HKN FIELD CIVILS SUPERVISOR

PR
HKN OPERATIONS SUPPORT MANAGER
A ISSUED FOR BID 04-SEP-22 SH JW MP
GEN OPO
ER SE
ATOD
R
FIRE

PR
TRAIN

C O
OU OM DU

Rev. Purpose of Revision Date Drawn Checked Approved


TSI BIN CT
DE ED ION
ING

ST W ST
OR OR OR
AG KSH E
EA O
RE P
A
CA
1

R
M WAST
0

20 PA
0

A
.0

m*8 RK AR NA E

HKN LOGISTICS MANAGER


0

0m ING EA GE
m
Civ ehic

EX

CLIENT
DN
(V
ils les

IS
TIN C
&
W M

G
in

ST
ter eria
&

R
M ls)

O 1
at

AD A
aint (F

PA

C
en ence

C
RK

m
an

ES 1.2 m
IN
ce d A

3.0
CLMB E&SONS

S
A IR SP

G
Sto rea)

m
F E

IN UL PIL E

7.6
ra

IC AN L

m
ge

2.4
CA
,FIR C

m
BO PERMANEN

2.6
MSS
E, E

P
OFFICE T
Fen
ce Area
dA
rtif
ic
ial
Tur
f

KITCHEN
DN

DINE
/ R
C

Garde
n
RE ST
CR OR
EA E
TIO
N

A
1

B
Y
C DR
2

UN

HKN PROJECT MANAGER


LA
3
AC PE BLO
CO RM CK
M AN B
M EN
OD T

M
AT

os
qu
IO
AC PERBLO

e
N

EXIST
CO M CK

ING
M AN A

ST
M EN

1
OD T

ROAD ACCE
SS
AT
IO

AC B
PE OM OCK
N

C L
RM M C
AN OD
EN ATIO
T

RVF DRAWING NUMBER:


N
EX
IS
TIN R
G AD
C
O

U
T-
O
FF

EP
DN
C

HKN PRODUCTION MANAGER RIG-018-005-150- G-001


DN
C
DRAWING TITLE

Kitchen / Diner
SITE CONTRACTOR Cover Sheet
Available
30*30 m Noto Access
this
area

PROJECT NAME
B Ops Camp Kitchen/Diner
HSE MANAGER PROJECT NUMBER: CONTRACT NUMBER:

RIG-018-005-150 RIG-018-005
DRAWN BY: DATE:

CSR MANAGER S. HOSHYAR


REVIEWED BY:
04-09-2022
APPROVED BY:

M. PARKER J. WATSON

PROJECT OVERVIEW
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:

A
SCALE:
Exhibit B
Kitchen/Diner Substructure Drawings

GENERAL STRUCTURAL NOTES: GENERAL NOTES:


A. DESIGN DATA 1. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL APPLICABLE PROJECT
1. DESIGN CODES DRAWINGS AND SPECIFICATIONS. ALL DISCREPANCIES SHALL BE REFERRED TO THE
· ACI 318M-14: BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE. ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK.
· ASCE7-16: DESIGN LOADS & ASSOCIATED CRITERIA FOR BUILDINGS & STRUCTURES. 2. ALL DIMENSIONS RELEVANT TO SETTING OUT AND OFF-SITE WORK SHALL BE VERIFIED BY
2. MINIMUM CHARACTERISTIC MATERIAL STRENGTHS THE CONTRACTOR BEFORE CONSTRUCTION IS COMMENCED. THE ENGINEER'S DRAWINGS
· STRUCTURAL STEEL SECTIONS: 250N/mm2/.(ASTM A36) SHALL BE SCALED.
· STRUCTURAL CONCRETE: 31N/mm2/ CYLINDER(38N/mm2/ CUBE) 3. DURING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
· REINFORCING STEEL: 420N/mm2/ THE STRUCTURE IN A STABLE CONDITION AND ENSURING NO PART SHALL BE OVERSTRESSED
3. DESIGN LIVE LOADS: UNDER CONSTRUCTION ACTIVITIES.
· FLOORS-5KN/m2/ 4. WORKMANSHIP AND MATERIALS ARE TO BE IN ACCORDANCE WITH THE RELEVANT AND
· ROOFS-5KN/m2/ CURRENT BRITISH/AMERICAN STANDARDS INCLUDING ALL AMENDMENTS AND STATUTORY
4. DESIGN SEISMIC LOADS: REQUIREMENTS, EXPECT WHERE VARIED BY THE CONTRACT DOCUMENTS.
· RISK CATEGORY: IV 5. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL ELEVATIONS AND COORDINATES ARE IN
· S/s:0.75 METERS UNLESS NOTED OTHERWISE.
· S/1:0.3 6. ALL ITEMS CALLED UP BY A TRADE NAME MAY BE SUBSTITUTED BY AN EQUIVALENT ITEM
· SITE CLASSIFICATION:D WITH SIMILAR PROPERTIES SUBJECT TO THE ARCHITECT'S/ENGINEER'S WRITTEN APPROVAL.
· SEISMIC DESIGN CATEGORY:D 7. NO OPENING(OTHER THAN THOSE SHOWN ON THE DRAWINGS)IS TO BE MADE IN ANY
· SEISMIC RESISTING SYSTEM:SPECIAL REINFORCED CONCRETE SHEAR WALLS BEAM, COLUMN, OR OTHER STRUCTURAL MEMBER WITHOUT WRITTEN APPROVAL OF THE
· R:5 ARCHITECT/ENGINEER.
· OVER STRENGTH FACTOR:2.5 8. THE STRUCTURE IS DESIGNED TO FUNCTION AS A UNIT UPON COMPLETION. THE
· C/d:2.5 CONTRACTOR IS RESPONSIBLE FOR DESIGNING AND FURNISHING ALL TEMPORARY BRACING
· DESIGN SOIL BEARING PRESSURES AND/OR SEQUENCES. THE STRUCTURAL ENGINEER ASSUMES NO LIABILITY FOR THE
· SOIL BEARING PRESSURE-1000KN/m2/ STRUCTURE DURING CONSTRUCTION.
· FOUNDATION DESIGN IS BASED ON REQUIREMENTS OF GEOTECHNICAL INGESTIGATION 9. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS
REPORT NO. HOLD1 PRIOR TO CONSTRUCTION. NOTIFY THE COMPANY'S REPRESENTATIVE OF ANY DISCREPANCY
6. WIND LOAD CALC AND SPEC IMMEDIATELY. INFORMATION PERTAINING TO EXISTING FIELD CONDITIONS GIVEN ON THESE
· ASCE 7-16 DRAWINGS REPRESENTS TO THE BEST OF COMPANY'S KNOWLEDGE, THE ACTUAL EXISTING
· BASIC WIND SPEED:47m/s FIELD CONDITIONS. COMPANY MAKES NO WARRANTY AS TO THEIR ACCURACY. CONTRACTOR
· EXPOSURE CATEGORY:C TO FIELD VERIFY EXISTING CONDITIONS IMPERATIVE TO THE NEW CONSTRUCTION AND
7. SNOWLOAD CALC AND SPEC REPORT DISCREPANCIES BETWEEN THE DRAWINGS AND FIELD CONDITIONS TO THE
· GROUND SNOW LOAD, Pg:6.0KN/m2/ ARCHITECT/ENGINEER FOR REVIEW. ANY WORK PERFORMED PRIOR TO RESOLUTION OF
· SLOPING ROOF LOAD, Ps:4.158KN/m2/ DISCREPANCIES BY THE ARCHITECT/ENGINEER IS SUBJECT TO REMOVAL AND REPLACEMENT
B. GENERAL INFORMATION AT NO ADDITIONAL COST TO THE CONTRACT.
1. ALL WALL FOOTINGS SHALL BE CENTERED ON WALLS ABOVE UNLESS NOTED 10. THE BASE OF ALL EXCAVATIONS SHALL BE KEPT FREE OF WATER AND LOOSE SOIL PRIOR
OTHERWISE. TO PLACING CONCRETE. CARE SHALL BE TAKEN DURING EXCAVATION AND CONSTRUCTION
2. ALL COLUMN FOOTINGS SHALL BE CENTERED ON COLUMNS ABOVE UNLESS NOTED TO MINIMIZE DISTURBANCE OF THE BEARING SOILS. THE CONCRETE SHALL BE PLACED AS
OTHERWISE. SOON AS POSSIBLE AFTER EXCAVATION TO PREVENT EXCESSIVE DRYING OR WETTING OF
C. FOOTINGS THE EXCAVATION.

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-150 - KITCHEN - DINER\pdfs - current\00 Full Package kitchen-diner\30% current
1. FOOTINGS SHALL BEAR ON UNDISTURBED, NATURAL MATERIAL OR COMPACTED FILL. 11. FOR APPLICABLE CODES AND STANDARDS, MATERIAL STRENGTHS AND CONSTRUCTION
2. THE NATURAL SOIL BELOW THE ENGINEERED FILL OR FOOTINGS SHALL BE SURFACE REQUIREMENTS SEE GENERAL STRUCTURAL NOTES AND SPECIFICATIONS.
COMPACTED. 12. SAW ALL CONCRETE CONSTRUCTION JOINTS CLEAN THEM OF DEBRIS, BELOW THEM DRY
3. IF THE SOIL AT THE FOOTING ELEVATIONS SHOWN IS OF QUESTIONABLE BEARING AND IMMEDIATELY SEAL WITH JOINT SEALANT.
VALUE, NOTIFY COMPANY IMMEDIATELY.
4. AFTER FOOTING EXCAVATIONS ARE COMPLETED AND BEFORE PLACING CONCRETE THE ABBREVIATIONS:
EXCAVATED AREAS SHALL BE REVIEWED BY COMPANY'S FIELD SUPERVISOR AND/OR 1. T.O.C.:TOP OF CONCRETE
TESTING ENGINEER. 2. B.O.C.:BOTTOM OF CONCRETE
D. CAST -IN-PLACE CONCRETE 3. L.D.P.:LOW DENSITY POLYETHYLENE
1. REINFORCING STEEL SHALL BE NEW AND ALL BARS SHALL BE DEFORMED UNLESS 4. CMU:CONCRETE MASONRY UNIT A ISSUED FOR BID 04-SEP-22 SH JW MP
NOTED OTHERWISE ON DRAWINGS. Rev. Purpose of Revision Date Drawn Checked Approved

2. CONCRETE COVER TO REINFORCEMENT SHALL BE AS FOLLOWS UNLESS NOTED CLIENT

OTHERWISE:
· FOOTINGS AND RAFT FOUNDATIONS-75mm
· WALLS AND COLUMNS BELOW GROUND-50mm RVF DRAWING NUMBER:
· EXTERNAL CONCRETE ABOVE GROUND-50mm
· INTERNAL CONCRETE-40mm RIG-018-005-150- S-001

3. LOCATION AND SIZES OF OPENING, SLEEVES etc. REQUIRED FOR OTHER TRADES MUST DRAWING TITLE

Kitchen / Diner
BE VERIFIED BY THESE TRADES BEFORE PLACING CONCRETE. General Notes
4. FOR CONSTRUCTION, CONTROL AND EXPANSION JOINTS IN WALL AND SLAB, SEE THE PROJECT NAME
RELEVANT CONSTRUCTION DRAWINGS AND STANDARD DETAILS. B Ops Camp Kitchen/Diner
E. MASONRY PROJECT NUMBER: CONTRACT NUMBER:

1. FOR ALL OPENINGS, THROUGH MASONRY WALLS INCLUDING MECHANICAL AND RIG-018-005-150
DRAWN BY:
RIG-018-005
DATE:
ELECTRICAL OPENINGS, PROVIDED ONE OF THE FOLLOWING UNLESS NOTED OTHERWISE. S. HOSHYAR 04-09-2022
a. STEEL ANGLE LINTELS. REVIEWED BY: APPROVED BY:

b. PROPRIETARY CABLE TRANSITS. M. PARKER J. WATSON


2. SEE ARCHITECTURAL DRAWINGS FOR LOCATION OF CONTROL JOINTS, MASONRY HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:

A
OPENINGS AND EMBEDDED ANCHORS FOR DOORS, EXTEND CONTROL JOINTS FULL HEIGHT SCALE:
OF CMU WALL.
Exhibit B
Kitchen/Diner Substructure Drawings

KITCHEN/DINER BUILDING

P
GE ROP
NE OS
RA ED
TO
R
FIRE
TRA

PR
C O
OU OM DUC
ININ

TS BIN T
ID ED ION
ES S
G

TO WOR TOR
RA K E
GE SHO
AR P
EA

CA
1

R
0

W
0

P M AS
.0

20 AR A T
0

m* KI AR NAG E
m

80 NG EA E
m
Ci

EX
vi

IS DN
(V

ls

TI
eh

C
&

N
icl

G
es

in
ter eria
&

S
R T 1
M

M ls) (
at

ain

O
AD A
ten ence

PA

C
an

C
RK
ce
F

ES
St

m
NG
or

1.2

S m
dA

CL BU &S NSE

3.0
ag

AMIRE PO
e
re

IN LA PIL
F ES

m
a)

7.6
IC N L
R

,FI C

m
CA OS PERM

2.4
RE E

m
M S

2.6
,

P
OFFICE T
Fe
nc Are

ANEN
ed a
Ar
tif
ic
ial
Tu
rf

KITCHE
DN

N/ DINE
C

Garde
n
RE ST
CR OR
EA E
TI
ON

A
1

RY
2

UND
LA
3
AC PE LO
CO RM CK
M AN B
M EN
B

OD T

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-150 - KITCHEN - DINER\pdfs - current\00 Full Package kitchen-diner\30% current
AT

M
IO

os
N

qu
AC PER LO

e
CO M CK
M AN A
M EN
B

OD T
AT
IO
N

AC
PE MM CK
CO BLO
RM O C
AN DA
EN TIO
T N
EX
IS
TI
N RO
G A
C D
U
T-
O
FF

DN
C

EP

DN
C

1 A ISSUED1 FOR BID


Revision 04-SEP-22
Date 1 SH JW MP
Rev. Purpose of Revision Date Drawn Checked Approved
CLIENT
Available
30*30 m Noto Access
this
area

RVF DRAWING NUMBER:

RIG-018-005-150- S-002
DRAWING TITLE

Kitchen / Diner
OVERALL PLAN
PROJECT NAME
B Ops Camp Kitchen/Diner
PROJECT NUMBER: CONTRACT NUMBER:

RIG-018-005-150 RIG-018-005
DRAWN BY: DATE:

S. HOSHYAR 04-09-2022
REVIEWED BY: APPROVED BY:

M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:

A
SCALE:
Exhibit B
Kitchen/Diner Substructure Drawings

1 2 3 4 5 6 7 8

35800

4750 4750 4750 4750 5400 5400 5400

A
5600

1500
S-501

1500

2000
B

500
1000 2000
4300

1
S-501
20000

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-150 - KITCHEN - DINER\pdfs - current\00 Full Package kitchen-diner\30% current
5500

600x600mm
COLUMN
D
4000

A ISSUED FOR BID 04-SEP-22 SH JW MP


E Rev. Purpose of Revision Date Drawn Checked Approved
CLIENT

RVF DRAWING NUMBER:

RIG-018-005-150- S-101
DRAWING TITLE

Kitchen / Diner
Basment Foundation Plan
PROJECT NAME

BASEMENT FOUNDATION-PLAN B Ops Camp Kitchen/Diner


PROJECT NUMBER: CONTRACT NUMBER:

RIG-018-005-150 RIG-018-005
DRAWN BY: DATE:

S. HOSHYAR 04-09-2022
REVIEWED BY: APPROVED BY:

M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:

A
SCALE:
NTS
Exhibit B
Kitchen/Diner Substructure Drawings

5 6 7 8 9 10 11 12

32400

5400 5400 5400 3350 3350 4750 4750

A
5600

1
S-502 2000

2000
B
4300

2
1500 S-501
19400

1500
C
5500

600X600mm

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-150 - KITCHEN - DINER\pdfs - current\00 Full Package kitchen-diner\30% current
COLUMN
D

2
4000

S-502

500
1000
A ISSUED FOR BID 04-SEP-22 SH JW MP
Rev. Purpose of Revision Date Drawn Checked Approved
CLIENT

RVF DRAWING NUMBER:

RIG-018-005-150- S-102
DRAWING TITLE

Kitchen / Diner
Kitchen Foundation Plan
PROJECT NAME

KITCHEN FOUNDATION-PLAN B Ops Camp Kitchen/Diner


PROJECT NUMBER: CONTRACT NUMBER:

RIG-018-005-150 RIG-018-005
DRAWN BY: DATE:

S. HOSHYAR 04-09-2022
REVIEWED BY: APPROVED BY:

M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:

A
SCALE:
NTS
Exhibit B
Kitchen/Diner Substructure Drawings

B
B

300

PROJECTION
STARER BAR

PROJECTION
STARER BAR
#12mm @200mm C-C

1500
1000
BOTH WAYS TOP AND
BOTTOM (TYP)

600x300mm
6NO. #25 - 3TOP + 3BOTTOM (TYP)
FLOOR BEAM(TYP)
FFL FFL
0 0

600
#20mm @200mm C-C #12mm @100mm C-C

#12mm @250mm C-C

WATERPROOF AND S-501

INSULATION

3000
12NO. - #25mm

#12mm @100mm C-C

2 LAYERS BRC #10 ISOLATION JOINT


(WELDED WIRE MESH
REINFORCEMENT) 1000 200 450 450
FFL-Basement FFL-Basement
200mm CONCRETE SLAB
-3100 -3100
100mm INSULATION
WATER STOP
50

T.O.C. FOUNDATION T.O.C. FOUNDATION


200mm COMPACTED 25mm -3600 -3600
500

500
CRUSHED AGGREGATE

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-150 - KITCHEN - DINER\pdfs - current\00 Full Package kitchen-diner\30% current
#20mm @200mm C-C #20mm @200 C-C
TOP AND BOTTOM(TYP) #12mm @250mm C-C BOTH WAYS TOP AND BOTTOM(TYP)
TOP AND BOTTOM(TYP)
50mm LEAN CONCRETE 100 1500 100 50mm LEAN CONCRETE
100 1500 100
200mm COMPACTED 200mm COMPACTED
25mm CRUSHED AGGREGATE 25mm CRUSHED AGGREGATE

1 Section 1 2 Section 2
S-501 1 : 20 S-501 1 : 20

A ISSUED FOR BID 04-SEP-22 SH JW MP


Rev. Purpose of Revision Date Drawn Checked Approved
CLIENT

12NO. -#25mm #12mm @100mm C-C


RVF DRAWING NUMBER:

RIG-018-005-150- S-501
600

DRAWING TITLE

Kitchen / Diner
Foundation Basement Details
600 PROJECT NAME
B Ops Camp Kitchen/Diner
PROJECT NUMBER: CONTRACT NUMBER:

RIG-018-005-150 RIG-018-005
3 DRAWN BY: DATE:
Section 3
S-501 1 : 20 S. HOSHYAR 04-09-2022
REVIEWED BY: APPROVED BY:

M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:

A
SCALE:
Exhibit B
Kitchen/Diner Substructure Drawings

300

PROJECTION
STARER BAR
1000
300

FFL
0 FFL
0
WATERPROOF AND #20mm @200mm C-C
INSULATION #12mm @250mm C-C #20mm @200mm C-C
#12mm @250mm C-C
WATERPROOF AND

1150
WATER STOP
200 INSULATION
1000 #20mm @200mm C-C
#20mm @200mm C-C #12mm @250mm C-C
TOP AND BOTTOM(TYP) 1000 200
TOP AND BOTTOM(TYP) TOP AND BOTTOM(TYP) WATER STOP

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-150 - KITCHEN - DINER\pdfs - current\00 Full Package kitchen-diner\30% current
#12mm @250mm C-C
TOP AND BOTTOM(TYP)
500

50mm LEAN CONCRETE

500
200mm COMPACTED
25mm CRUSHED AGGREGATE
100 1500 100 50mm LEAN CONCRETE
100 1500 100
200mm COMPACTED
25mm CRUSHED AGGREGATE

1 Section 4 2 Section 5
A ISSUED FOR BID 04-SEP-22 SH JW MP
S-502 1 : 20 S-502 1 : 20
Rev. Purpose of Revision Date Drawn Checked Approved
CLIENT

RVF DRAWING NUMBER:

RIG-018-005-150- S-502
DRAWING TITLE

Kitchen / Diner
Kitchen Foundation Details
PROJECT NAME
B Ops Camp Kitchen/Diner
PROJECT NUMBER: CONTRACT NUMBER:

RIG-018-005-150 RIG-018-005
DRAWN BY: DATE:

S. HOSHYAR 04-09-2022
REVIEWED BY: APPROVED BY:

M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:

A
SCALE:
Exhibit B
Kitchen/Diner Substructure Drawings

COLUMN

COLUMN FOOTING

LEAN CONCRETE

CRUSHED AGGREGATE

3D-Wireframe-Column 3D-Wireframe-Ground Slab 3D-Realistic-Column


1 2 3
WATERPROOF AND
INSULATION

CONRETE WALL

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-150 - KITCHEN - DINER\pdfs - current\00 Full Package kitchen-diner\30% current
A ISSUED FOR BID 04-SEP-22 SH JW MP
Rev. Purpose of Revision Date Drawn Checked Approved
WALL FOOTING CLIENT

FISHING PART
RVF DRAWING NUMBER:

CONCRETE SLAB
RIG-018-005-150- S-901
DRAWING TITLE
INSULATION
Kitchen / Diner
3D View-Typical Basement Details
PROJECT NAME
B Ops Camp Kitchen/Diner
PROJECT NUMBER: CONTRACT NUMBER:
LEAN CONCRETE
RIG-018-005-150 RIG-018-005
DRAWN BY: DATE:

CRUSHED S. HOSHYAR 04-09-2022


REVIEWED BY: APPROVED BY:
AGGREGATE
M. PARKER J. WATSON
CRUSHED AGGREGATE HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:

3D-Wireframe-Wall 3D-Realistic-Ground Slab 3D-Realistic-Wall A


4 5 6 SCALE:
Exhibit B
Kitchen/Diner Substructure Drawings

CONCRETE WALL

WALL FOOTING WATERPROOF


AND INSULATION

LEAN CONCRETE

CRUSHED AGGREGATE

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-150 - KITCHEN - DINER\pdfs - current\00 Full Package kitchen-diner\30% current
CONCRETE BLOCK WALL

CONCRETE WALL

WATERPROOF
AND INSULATION A ISSUED FOR BID 04-SEP-22 SH JW MP
Rev. Purpose of Revision Date Drawn Checked Approved
CLIENT
WALL FOOTING

RVF DRAWING NUMBER:

LEAN CONCRETE RIG-018-005-150- S-902


DRAWING TITLE

Kitchen / Diner
3D View-Typical Kitchen Foundation Details
PROJECT NAME
B Ops Camp Kitchen/Diner
CRUSHED AGGREGATE
PROJECT NUMBER: CONTRACT NUMBER:

RIG-018-005-150 RIG-018-005
DRAWN BY: DATE:

S. HOSHYAR 04-09-2022
REVIEWED BY: APPROVED BY:

M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:

A
SCALE:

You might also like