0% found this document useful (0 votes)
141 views18 pages

STR Rfi As On 14-02-2024

The document provides details of construction activities related to drainage structures carried out between February 1st and 2nd, 2024. It lists 17 activities related to checking of formwork, reinforcement, concreting and stressing of pre-stressed concrete girders at various chainages along the left and right sides of the road. Some activities are noted as repeated or completed.

Uploaded by

bineetmishra1990
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
141 views18 pages

STR Rfi As On 14-02-2024

The document provides details of construction activities related to drainage structures carried out between February 1st and 2nd, 2024. It lists 17 activities related to checking of formwork, reinforcement, concreting and stressing of pre-stressed concrete girders at various chainages along the left and right sides of the road. Some activities are noted as repeated or completed.

Uploaded by

bineetmishra1990
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

Location Service

Submission Inspection Length


S No. RFI NO Description of Activity From CH: To CH: Side Road/ Item Status
Date Date (M)
MCW
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11791 KHPL/TK/NH-66/STR/11665 1-Feb-2024 2-Feb-2024 395+623 395+660 37 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11792 KHPL/TK/NH-66/STR/11666 1-Feb-2024 2-Feb-2024 397+340 397+360 20 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11793 KHPL/TK/NH-66/STR/11667 1-Feb-2024 2-Feb-2024 395+623 395+660 37 LHS Drain Repeated
Drain Wall 1st with Final lift
Work
11794 KHPL/TK/NH-66/STR/11668 1-Feb-2024 2-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 370+945 370+980 35 LHS Drain
Done
Work
11795 KHPL/TK/NH-66/STR/11669 1-Feb-2024 2-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 370+985 371+000 15 LHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11796 KHPL/TK/NH-66/STR/11670 1-Feb-2024 2-Feb-2024 372+250 372+300 50 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11797 KHPL/TK/NH-66/STR/11671 1-Feb-2024 2-Feb-2024 397+320 397+340 20 LHS Drain Repeated
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11798 KHPL/TK/NH-66/STR/11672 1-Feb-2024 2-Feb-2024 372+200 372+250 50 RHS Drain
Drain Wall 1st with Final lift Done
Work
11799 KHPL/TK/NH-66/STR/11673 1-Feb-2024 2-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 394+028 394+047 19 RHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11800 KHPL/TK/NH-66/STR/11674 1-Feb-2024 2-Feb-2024 372+250 372+300 50 RHS Drain
Drain Raft Done
Work
11801 KHPL/TK/NH-66/STR/11675 1-Feb-2024 2-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 372+320 372+380 60 LHS Drain
Done
Work
11802 KHPL/TK/NH-66/STR/11676 1-Feb-2024 2-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 372+535 372+580 45 LHS Drain
Done
Work
11803 KHPL/TK/NH-66/STR/11677 1-Feb-2024 2-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 371+800 371+860 60 LHS Drain
Done
Major PSC Girder Work
11804 KHPL/TK/NH-66/STR/11678 1-Feb-2024 2-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-1/RHS,A1-P1) 387+230 RHS
Bridge stressing Done
Major PSC Girder Work
11805 KHPL/TK/NH-66/STR/11679 1-Feb-2024 2-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-2/RHS,A1-P1) 387+230 RHS
Bridge stressing Done
Major PSC Girder Work
11806 KHPL/TK/NH-66/STR/11680 1-Feb-2024 2-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-3/RHS,A1-P1) 387+230 RHS
Bridge stressing Done
Elevated PSC Girder Work
11807 KHPL/TK/NH-66/STR/11681 1-Feb-2024 2-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/RHS,P12-P13)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
11808 KHPL/TK/NH-66/STR/11682 1-Feb-2024 2-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P7-P8)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
11809 KHPL/TK/NH-66/STR/11683 1-Feb-2024 2-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P7-P8)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
11810 KHPL/TK/NH-66/STR/11684 1-Feb-2024 2-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P6-P7)(388+500) 389+465 LHS
Bridge Grouting Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11811 KHPL/TK/NH-66/STR/11685 1-Feb-2024 2-Feb-2024 389+305 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P11/RHS) Bridge Bridge
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
11812 KHPL/TK/NH-66/STR/11686 1-Feb-2024 2-Feb-2024 389+665 RHS
Pedestal 08 nos of Elevated Bridge ( P20/RHS) Bridge Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11813 KHPL/TK/NH-66/STR/11687 1-Feb-2024 2-Feb-2024 389+665 RHS Repeated
Pedestal 08 nos of Elevated Bridge ( P20/RHS) Bridge Bridge
Checking of excavation, level, layout and pouring PCC (M-15) grade for Box Culvert
11814 KHPL/TK/NH-66/STR/11688 1-Feb-2024 2-Feb-2024 388+064 Box Culvert LHS MCW Box Culvert Repeated
(MCW)
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
11815 KHPL/TK/NH-66/STR/11689 1-Feb-2024 2-Feb-2024 383+623 383+645 22 LHS Retaining Wall
Wall 1st lift for Retaining Wall. Done

11816 KHPL/TK/NH-66/STR/11690 1-Feb-2024 2-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for Retaining Wall. 383+510 383+530 20 RHS Retaining Wall Not done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11817 KHPL/TK/NH-66/STR/11691 1-Feb-2024 2-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
11818 KHPL/TK/NH-66/STR/11692 1-Feb-2024 2-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting
11819 KHPL/TK/NH-66/STR/11693 1-Feb-2024 2-Feb-2024 369+550 RE Panel Not done
S4 type-16 nos, P3 type-06 nos. Yard
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11820 KHPL/TK/NH-66/STR/11694 2-Feb-2024 3-Feb-2024 395+623 395+660 37 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11821 KHPL/TK/NH-66/STR/11695 2-Feb-2024 3-Feb-2024 370+945 370+980 35 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11822 KHPL/TK/NH-66/STR/11696 2-Feb-2024 3-Feb-2024 370+985 371+000 15 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11823 KHPL/TK/NH-66/STR/11697 2-Feb-2024 3-Feb-2024 372+250 372+280 30 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11824 KHPL/TK/NH-66/STR/11698 2-Feb-2024 3-Feb-2024 372+200 372+220 20 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11825 KHPL/TK/NH-66/STR/11699 2-Feb-2024 3-Feb-2024 394+028 394+047 19 RHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11826 KHPL/TK/NH-66/STR/11700 2-Feb-2024 3-Feb-2024 397+340 397+360 20 LHS Drain
Drain Wall 1st with Final lift Done
Work
11827 KHPL/TK/NH-66/STR/11701 2-Feb-2024 3-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 393+935 393+997 62 RHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11828 KHPL/TK/NH-66/STR/11702 2-Feb-2024 3-Feb-2024 397+370 397+410 40 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11829 KHPL/TK/NH-66/STR/11703 2-Feb-2024 3-Feb-2024 373+755 373+800 45 LHS Drain
Drain Wall 1st with Final lift Done
Work
11830 KHPL/TK/NH-66/STR/11704 2-Feb-2024 3-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 394+465 394+490 25 LHS Drain
Done
Work
11831 KHPL/TK/NH-66/STR/11705 2-Feb-2024 3-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for Retaining Wall. 383+510 383+530 20 RHS Retaining Wall
Done
Elevated PSC Girder Work
11832 KHPL/TK/NH-66/STR/11706 2-Feb-2024 3-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/RHS,P12-P13)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated
11833 KHPL/TK/NH-66/STR/11707 2-Feb-2024 3-Feb-2024 Reinforcement & profile checking of PSC girder of Elevated Bridge (OG-1/RHS,P8-P9) 394+000 RHS PSC Girder Repeated
Bridge
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated
11834 KHPL/TK/NH-66/STR/11708 2-Feb-2024 3-Feb-2024 394+000 RHS PSC Girder Repeated
Elevated Bridge (OG-1/RHS,P8-P9) Bridge
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated
11835 KHPL/TK/NH-66/STR/11709 2-Feb-2024 3-Feb-2024 390+025 LHS Not done
Cap of Elevated Bridges (Pier No. P29/LHS) Bridge Bridge
Elevated PSC Girder Work
11836 KHPL/TK/NH-66/STR/11710 2-Feb-2024 3-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P9-P10) (388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
11837 KHPL/TK/NH-66/STR/11711 2-Feb-2024 3-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,P10-P11) (388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
11838 KHPL/TK/NH-66/STR/11712 2-Feb-2024 3-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P10-P11) (388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
11839 KHPL/TK/NH-66/STR/11713 2-Feb-2024 3-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P10-P11) (388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
11840 KHPL/TK/NH-66/STR/11714 2-Feb-2024 3-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/RHS,P11-P12)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
11841 KHPL/TK/NH-66/STR/11715 2-Feb-2024 3-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/LHS,P11-P12)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
11842 KHPL/TK/NH-66/STR/11716 2-Feb-2024 3-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (IG-1/LHS,A1-P1)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
11843 KHPL/TK/NH-66/STR/11717 2-Feb-2024 3-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (IG-1/RHS,A1-P1)(388+500) 389+465 RHS
Bridge stressing Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11844 KHPL/TK/NH-66/STR/11718 2-Feb-2024 3-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
11845 KHPL/TK/NH-66/STR/11719 2-Feb-2024 3-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11846 KHPL/TK/NH-66/STR/11720 3-Feb-2024 4-Feb-2024 370+945 370+980 35 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11847 KHPL/TK/NH-66/STR/11721 3-Feb-2024 4-Feb-2024 370+985 371+000 15 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11848 KHPL/TK/NH-66/STR/11722 3-Feb-2024 4-Feb-2024 372+250 372+280 30 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11849 KHPL/TK/NH-66/STR/11723 3-Feb-2024 4-Feb-2024 394+028 394+047 19 RHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11850 KHPL/TK/NH-66/STR/11724 3-Feb-2024 4-Feb-2024 393+950 393+997 47 RHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11851 KHPL/TK/NH-66/STR/11725 3-Feb-2024 4-Feb-2024 389+965 389+985 20 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11852 KHPL/TK/NH-66/STR/11726 3-Feb-2024 4-Feb-2024 397+370 397+390 20 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11853 KHPL/TK/NH-66/STR/11727 3-Feb-2024 4-Feb-2024 397+340 397+360 20 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11854 KHPL/TK/NH-66/STR/11728 3-Feb-2024 4-Feb-2024 397+410 397+430 20 LHS Drain
Drain Raft Done
Work
11855 KHPL/TK/NH-66/STR/11729 3-Feb-2024 4-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 370+900 370+945 45 LHS Drain
Done
Work
11856 KHPL/TK/NH-66/STR/11730 3-Feb-2024 4-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for Retaining Wall. 377+450 377+480 30 LHS Retaining Wall
Done
Work
11857 KHPL/TK/NH-66/STR/11731 3-Feb-2024 4-Feb-2024 Checking of Level & Erection of Box Culvert Pre- Cast (MCW) 388+064 Box Culvert LHS MCW Box Culvert
Done
Checking of excavation, level, layout and pouring PCC (M-15) grade for Box Culvert Work
11858 KHPL/TK/NH-66/STR/11732 3-Feb-2024 4-Feb-2024 388+027 Box Culvert RHS MCW Box Culvert
(MCW) Done
Checking of reinforcement, mould and pouring concrete M-40 grade for Plank Slab (Pre- Work
11859 KHPL/TK/NH-66/STR/11733 3-Feb-2024 4-Feb-2024 396+888 Flyover Plank Slab
Cast) (14 nos) Done
Checking of excavation, level, layout and pouring PCC (M-15) grade for Pile Cap of Elevated Elevated Work
11860 KHPL/TK/NH-66/STR/11734 3-Feb-2024 4-Feb-2024 394+000 LHS
Elevated Bridge (Ch.394+120) (Pier No. P09/LHS) Bridge Bridge Done
Elevated PSC Girder Work
11861 KHPL/TK/NH-66/STR/11735 3-Feb-2024 4-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-1/LHS,P11-P12)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
11862 KHPL/TK/NH-66/STR/11736 3-Feb-2024 4-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/RHS,P8-P9)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
11863 KHPL/TK/NH-66/STR/11737 3-Feb-2024 4-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/LHS,P8-P9)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
11864 KHPL/TK/NH-66/STR/11738 3-Feb-2024 4-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,P9-P10) (388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
11865 KHPL/TK/NH-66/STR/11739 3-Feb-2024 4-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/RHS,P9-P10) (388+500) 389+465 RHS
Bridge Grouting Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11866 KHPL/TK/NH-66/STR/11740 3-Feb-2024 4-Feb-2024 389+585 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P18/RHS)(Design ch: 389+465) Bridge Bridge
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11867 KHPL/TK/NH-66/STR/11741 3-Feb-2024 4-Feb-2024 389+305 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P11/RHS) Bridge Bridge
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated
11868 KHPL/TK/NH-66/STR/11742 3-Feb-2024 4-Feb-2024 394+000 RHS Repeated
Elevated Bridge inner-side pier Shaft (Pier No. P02/RHS) (Ch.393+910) Bridge Bridge
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated Work
11869 KHPL/TK/NH-66/STR/11743 3-Feb-2024 4-Feb-2024 394+000 RHS
Elevated Bridge outer-side pier Shaft Starter (Pier No. P02/RHS) (Ch.393+910) Bridge Bridge Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11870 KHPL/TK/NH-66/STR/11744 3-Feb-2024 4-Feb-2024 386+600 RE Panel
S5 type-13 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting Work
11871 KHPL/TK/NH-66/STR/11745 3-Feb-2024 4-Feb-2024 397+300 Pre-Cast Drain
(14 nos) Yard Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11872 KHPL/TK/NH-66/STR/11746 3-Feb-2024 4-Feb-2024 369+550 RE Panel
S4 type-02 nos, S5 type-18 nos, P3 type-02 nos, MG4 type-02 nos. Yard Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11873 KHPL/TK/NH-66/STR/11747 4-Feb-2024 5-Feb-2024 370+945 370+980 35 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11874 KHPL/TK/NH-66/STR/11748 4-Feb-2024 5-Feb-2024 370+985 371+000 15 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11875 KHPL/TK/NH-66/STR/11749 4-Feb-2024 5-Feb-2024 394+028 394+047 19 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11876 KHPL/TK/NH-66/STR/11750 4-Feb-2024 5-Feb-2024 370+900 370+945 45 LHS Drain
Drain Raft Done
Work
11877 KHPL/TK/NH-66/STR/11751 4-Feb-2024 5-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Pre- Cast. 395+860 395+870 10 RHS Drain Erection
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11878 KHPL/TK/NH-66/STR/11752 4-Feb-2024 5-Feb-2024 378+840 378+850 10 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11879 KHPL/TK/NH-66/STR/11753 4-Feb-2024 5-Feb-2024 372+220 372+250 30 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11880 KHPL/TK/NH-66/STR/11754 4-Feb-2024 5-Feb-2024 372+250 372+300 50 RHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11881 KHPL/TK/NH-66/STR/11755 4-Feb-2024 5-Feb-2024 372+000 372+008 8 RHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11882 KHPL/TK/NH-66/STR/11756 4-Feb-2024 5-Feb-2024 372+050 372+078 28 RHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11883 KHPL/TK/NH-66/STR/11757 4-Feb-2024 5-Feb-2024 372+150 372+160 10 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11884 KHPL/TK/NH-66/STR/11758 4-Feb-2024 5-Feb-2024 393+950 393+997 47 RHS Drain
Drain Wall 1st with Final lift Done
Drain Work
11885 KHPL/TK/NH-66/STR/11759 4-Feb-2024 5-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Pre- Cast. 395+860 395+920 60 RHS
Erection Done
Drain
11886 KHPL/TK/NH-66/STR/11760 4-Feb-2024 5-Feb-2024 Checking of Level & Erection of Drain Pre- Cast. 395+800 395+840 40 RHS Not done
Erection
Drain
11887 KHPL/TK/NH-66/STR/11761 4-Feb-2024 5-Feb-2024 Checking of Level & Erection of Drain Pre- Cast. 395+860 395+920 60 RHS Not done
Erection
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11888 KHPL/TK/NH-66/STR/11762 4-Feb-2024 5-Feb-2024 397+390 397+410 20 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11889 KHPL/TK/NH-66/STR/11763 4-Feb-2024 5-Feb-2024 397+370 397+390 20 LHS Drain Not done
Drain Slab
11890 KHPL/TK/NH-66/STR/11764 4-Feb-2024 5-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 397+430 397+530 100 LHS Drain Not done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
11891 KHPL/TK/NH-66/STR/11765 4-Feb-2024 5-Feb-2024 389+585 RHS
Pedestal 08 nos of Elevated Bridge ( P18/RHS)(Design ch: 389+465) Bridge Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11892 KHPL/TK/NH-66/STR/11766 4-Feb-2024 5-Feb-2024 389+305 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P11/RHS) Bridge Bridge
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in
11893 KHPL/TK/NH-66/STR/11767 4-Feb-2024 5-Feb-2024 383+510 383+530 20 RHS Retaining Wall Not done
Raft of Retaining Wall.
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Retaining Wall Work
11894 KHPL/TK/NH-66/STR/11768 4-Feb-2024 5-Feb-2024 375+430 375+538 108 RHS
Retaining Wall NJCB. NJCB Done
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Retaining Wall Work
11895 KHPL/TK/NH-66/STR/11769 4-Feb-2024 5-Feb-2024 369+995 370+062 67 LHS
Retaining Wall NJCB. NJCB Done
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Retaining Wall Work
11896 KHPL/TK/NH-66/STR/11770 4-Feb-2024 5-Feb-2024 370+067 370+147 80 LHS
Retaining Wall NJCB. NJCB Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
11897 KHPL/TK/NH-66/STR/11771 4-Feb-2024 5-Feb-2024 389+305 LHS
Pedestal 08 nos of Elevated Bridge ( P11/LHS) Bridge Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated
11898 KHPL/TK/NH-66/STR/11772 4-Feb-2024 5-Feb-2024 390+025 LHS Repeated
Cap of Elevated Bridges (Pier No. P29/LHS) Bridge Bridge
Elevated
11899 KHPL/TK/NH-66/STR/11773 4-Feb-2024 5-Feb-2024 Reinforcement & profile checking of PSC girder of Elevated Bridge (IG-1/RHS,P8-P9) 394+000 RHS PSC Girder Repeated
Bridge
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated
11900 KHPL/TK/NH-66/STR/11774 4-Feb-2024 5-Feb-2024 394+000 RHS PSC Girder Repeated
Elevated Bridge (IG-1/RHS,P8-P9) Bridge
PSC Girder Work
11901 KHPL/TK/NH-66/STR/11775 4-Feb-2024 5-Feb-2024 Checking of stressing for PSC girder Major Bridge (OG-1/LHS,P3-A2) 387+230 MJB LHS
stressing Done
PSC Girder Work
11902 KHPL/TK/NH-66/STR/11776 4-Feb-2024 5-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-1/LHS,P3-A2) 387+230 MJB LHS
stressing Done
Checking of reinforcement, mould and pouring concrete M-40 grade for Plank Slab (Pre- Work
11903 KHPL/TK/NH-66/STR/11777 4-Feb-2024 5-Feb-2024 396+888 Flyover Plank Slab
Cast) (15 nos) Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11904 KHPL/TK/NH-66/STR/11778 4-Feb-2024 5-Feb-2024 386+600 RE Panel
S5 type-03 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting Work
11905 KHPL/TK/NH-66/STR/11779 4-Feb-2024 5-Feb-2024 397+300 Pre-Cast Drain
(09 nos) Yard Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11906 KHPL/TK/NH-66/STR/11780 4-Feb-2024 5-Feb-2024 369+550 RE Panel
S5 type-11 nos, P3 type-04 nos. Yard Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11907 KHPL/TK/NH-66/STR/11781 4-Feb-2024 5-Feb-2024 370+900 370+945 45 LHS Drain Repeated
Drain Raft

11908 KHPL/TK/NH-66/STR/11782 4-Feb-2024 5-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Pre- Cast. 395+860 395+870 10 RHS Drain Erection Repeated

Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in


11909 KHPL/TK/NH-66/STR/11783 4-Feb-2024 5-Feb-2024 378+840 378+850 10 LHS Drain Repeated
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11910 KHPL/TK/NH-66/STR/11784 4-Feb-2024 5-Feb-2024 372+220 372+250 30 RHS Drain Repeated
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11911 KHPL/TK/NH-66/STR/11785 4-Feb-2024 5-Feb-2024 372+250 372+268 18 RHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11912 KHPL/TK/NH-66/STR/11786 4-Feb-2024 5-Feb-2024 372+000 372+008 8 RHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11913 KHPL/TK/NH-66/STR/11787 4-Feb-2024 5-Feb-2024 372+050 372+078 28 RHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11914 KHPL/TK/NH-66/STR/11788 4-Feb-2024 5-Feb-2024 372+150 372+160 10 RHS Drain Repeated
Drain Slab

11915 KHPL/TK/NH-66/STR/11789 5-Feb-2024 6-Feb-2024 Checking of Level & Erection of Drain Pre- Cast. 395+860 395+888 28 RHS Drain Erection Not done

Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11916 KHPL/TK/NH-66/STR/11790 5-Feb-2024 6-Feb-2024 372+250 372+300 50 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11917 KHPL/TK/NH-66/STR/11791 5-Feb-2024 6-Feb-2024 372+000 372+008 8 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11918 KHPL/TK/NH-66/STR/11792 5-Feb-2024 6-Feb-2024 372+050 372+078 28 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11919 KHPL/TK/NH-66/STR/11793 5-Feb-2024 6-Feb-2024 397+430 397+530 100 LHS Drain Not done
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11920 KHPL/TK/NH-66/STR/11794 5-Feb-2024 6-Feb-2024 397+410 397+430 20 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11921 KHPL/TK/NH-66/STR/11795 5-Feb-2024 6-Feb-2024 397+390 397+410 20 LHS Drain Not done
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11922 KHPL/TK/NH-66/STR/11796 5-Feb-2024 6-Feb-2024 389+965 389+985 20 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11923 KHPL/TK/NH-66/STR/11797 5-Feb-2024 6-Feb-2024 397+455 397+480 25 LHS Drain Not done
Drain Raft
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated
11924 KHPL/TK/NH-66/STR/11798 5-Feb-2024 6-Feb-2024 388+905 LHS Repeated
Cap of Elevated Bridge (P01/LHS) Bridge Bridge
Elevated PSC Girder Work
11925 KHPL/TK/NH-66/STR/11799 5-Feb-2024 6-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,P2-P3) (388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
11926 KHPL/TK/NH-66/STR/11800 5-Feb-2024 6-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/LHS,P2-P3)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
11927 KHPL/TK/NH-66/STR/11801 5-Feb-2024 6-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P12-P13)(388+500) 389+465 LHS
Bridge Grouting Done
PSC Girder Work
11928 KHPL/TK/NH-66/STR/11802 5-Feb-2024 6-Feb-2024 Checking of stressing for PSC girder Major Bridge (OG-2/LHS,P3-A2) 387+230 MJB LHS
stressing Done
PSC Girder Work
11929 KHPL/TK/NH-66/STR/11803 5-Feb-2024 6-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-2/LHS,P3-A2) 387+230 MJB LHS
stressing Done
PSC Girder Work
11930 KHPL/TK/NH-66/STR/11804 5-Feb-2024 6-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-3/LHS,P3-A2) 387+230 MJB LHS
stressing Done
PSC Girder Work
11931 KHPL/TK/NH-66/STR/11805 5-Feb-2024 6-Feb-2024 Checking of stressing for PSC girder Major Bridge (OG-1/RHS,P3-A2) 387+230 MJB RHS
stressing Done
PSC Girder Work
11932 KHPL/TK/NH-66/STR/11806 5-Feb-2024 6-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-1/RHS,P3-A2) 387+230 MJB RHS
stressing Done
PSC Girder Work
11933 KHPL/TK/NH-66/STR/11807 5-Feb-2024 6-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-2/RHS,P3-A2) 387+230 MJB RHS
stressing Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11934 KHPL/TK/NH-66/STR/11808 5-Feb-2024 6-Feb-2024 389+585 LHS Not done
Pedestal 08 nos of Elevated Bridge ( P18/LHS)(Design ch: 389+465) Bridge Bridge
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11935 KHPL/TK/NH-66/STR/11809 5-Feb-2024 6-Feb-2024 389+305 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P11/RHS) Bridge Bridge
Elevated Work
11936 KHPL/TK/NH-66/STR/11810 5-Feb-2024 6-Feb-2024 Reinforcement & profile checking of PSC girder of Elevated Bridge (IG-2/RHS,P8-P9) 394+000 RHS PSC Girder
Bridge Done
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated Work
11937 KHPL/TK/NH-66/STR/11811 5-Feb-2024 6-Feb-2024 394+000 RHS PSC Girder
Elevated Bridge (IG-2/RHS,P8-P9) Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for
11938 KHPL/TK/NH-66/STR/11812 5-Feb-2024 6-Feb-2024 396+888 Flyover LHS Flyover Not done
Pedestal 8 nos of Flyover (P02/LHS)
Checking of shuttering, centering and pouring concrete M-40 grade for RCC Girder of
11939 KHPL/TK/NH-66/STR/11813 5-Feb-2024 6-Feb-2024 396+888 Flyover LHS RCC Girder Not done
Flyover (IG-1/LHS, A1-P1)
Checking of reinforcement, mould and pouring concrete M-40 grade for Plank Slab (Pre- Work
11940 KHPL/TK/NH-66/STR/11814 5-Feb-2024 6-Feb-2024 396+888 Flyover Plank Slab
Cast) (13 nos) Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11941 KHPL/TK/NH-66/STR/11815 5-Feb-2024 6-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
11942 KHPL/TK/NH-66/STR/11816 5-Feb-2024 6-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting
11943 KHPL/TK/NH-66/STR/11817 5-Feb-2024 6-Feb-2024 369+550 RE Panel Not done
S4 type-02 nos, S5 type-18 nos, P3 type-02 nos, MG4 type-02 nos. Yard
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11944 KHPL/TK/NH-66/STR/11818 5-Feb-2024 6-Feb-2024 372+250 372+268 18 RHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11945 KHPL/TK/NH-66/STR/11819 5-Feb-2024 6-Feb-2024 372+000 372+008 8 RHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11946 KHPL/TK/NH-66/STR/11820 5-Feb-2024 6-Feb-2024 372+050 372+078 28 RHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11947 KHPL/TK/NH-66/STR/11821 5-Feb-2024 6-Feb-2024 372+150 372+160 10 RHS Drain Repeated
Drain Slab
Work
11948 KHPL/TK/NH-66/STR/11822 6-Feb-2024 7-Feb-2024 Checking of Level & Erection of Drain Pre- Cast. 395+800 395+840 40 RHS Drain Erection
Done

11949 KHPL/TK/NH-66/STR/11823 6-Feb-2024 7-Feb-2024 Checking of Level & Erection of Drain Pre- Cast. 395+860 395+920 60 RHS Drain Erection Not done

Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11950 KHPL/TK/NH-66/STR/11824 6-Feb-2024 7-Feb-2024 373+330 373+340 10 LHS Drain
Drain Raft Done
Work
11951 KHPL/TK/NH-66/STR/11825 6-Feb-2024 7-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Pre- Cast. 395+920 395+940 20 RHS Drain Erection
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11952 KHPL/TK/NH-66/STR/11826 6-Feb-2024 7-Feb-2024 389+940 389+968 28 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11953 KHPL/TK/NH-66/STR/11827 6-Feb-2024 7-Feb-2024 397+410 397+430 20 LHS Drain Not done
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11954 KHPL/TK/NH-66/STR/11828 6-Feb-2024 7-Feb-2024 372+535 372+580 45 LHS Drain
Drain Raft Done
Work
11955 KHPL/TK/NH-66/STR/11829 6-Feb-2024 7-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 371+760 371+800 40 LHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11956 KHPL/TK/NH-66/STR/11830 6-Feb-2024 7-Feb-2024 372+320 372+380 60 LHS Drain
Drain Raft Done
Work
11957 KHPL/TK/NH-66/STR/11831 6-Feb-2024 7-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 372+395 372+440 45 LHS Drain
Done
Work
11958 KHPL/TK/NH-66/STR/11832 6-Feb-2024 7-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 397+430 397+500 70 LHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated
11959 KHPL/TK/NH-66/STR/11833 6-Feb-2024 7-Feb-2024 394+000 RHS Not done
Elevated Bridge outer-side pier Shaft (Pier No. P02/RHS) (Ch.393+910) Bridge Bridge
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Work
11960 KHPL/TK/NH-66/STR/11834 6-Feb-2024 7-Feb-2024 396+888 Flyover LHS Flyover
Pedestal 8 nos of Flyover (P02/LHS) Done
Elevated PSC Girder Work
11961 KHPL/TK/NH-66/STR/11835 6-Feb-2024 7-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P2-P3)(388+500) 389+465 LHS
Bridge Grouting Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated Work
11962 KHPL/TK/NH-66/STR/11836 6-Feb-2024 7-Feb-2024 394+560 LHS
Cap of Elevated Bridge (Abutment No.A2/LHS) Bridge Bridge Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade for Work
11963 KHPL/TK/NH-66/STR/11837 6-Feb-2024 7-Feb-2024 393+833 Box Culvert LHS SR Box Culvert
Box Culvert Wall Final lift, Top Haunch with Slab (SR) Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade for Work
11964 KHPL/TK/NH-66/STR/11838 6-Feb-2024 7-Feb-2024 393+833 Box Culvert LHS MCW Box Culvert
Box Culvert Wall Final lift, Top Haunch with Slab (MCW) Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11965 KHPL/TK/NH-66/STR/11839 6-Feb-2024 7-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
11966 KHPL/TK/NH-66/STR/11840 6-Feb-2024 7-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11967 KHPL/TK/NH-66/STR/11841 6-Feb-2024 7-Feb-2024 369+550 RE Panel
S5 type-26 nos, P2 type-02 nos. Yard Done
Checking of shuttering, centering and pouring concrete M-40 grade for RCC Girder of Work
11968 KHPL/TK/NH-66/STR/11842 6-Feb-2024 7-Feb-2024 396+888 Flyover LHS RCC Girder
Flyover (IG-1/LHS, A1-P1) Done
11969 KHPL/TK/NH-66/STR/11843 6-Feb-2024 7-Feb-2024 Reinforcement & profile checking of PSC girder of Flyover (OG-2/RHS,P1-P2) 389+465 Flyover RHS PSC Girder Not done
Checking of shuttering, centering and pouring concrete M-50 grade for PSC Girder of
11970 KHPL/TK/NH-66/STR/11844 6-Feb-2024 7-Feb-2024 396+888 Flyover RHS PSC Girder Repeated
Flyover (OG-2/RHS,P1-P2)
Elevated PSC Girder Work
11971 KHPL/TK/NH-66/STR/11845 6-Feb-2024 7-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/LHS,A1-P1)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
11972 KHPL/TK/NH-66/STR/11846 6-Feb-2024 7-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/RHS,A1-P1)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
11973 KHPL/TK/NH-66/STR/11847 6-Feb-2024 7-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-1/RHS,A1-P1)(388+500) 389+465 RHS
Bridge stressing Done
Checking of excavation, level, layout and pouring PCC (M-15) grade for Pile Cap of Elevated Elevated Work
11974 KHPL/TK/NH-66/STR/11848 6-Feb-2024 7-Feb-2024 394+000 LHS
Elevated Bridge (Ch.394+120) (Abutment No. A2/LHS) Bridge Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
11975 KHPL/TK/NH-66/STR/11849 6-Feb-2024 7-Feb-2024 389+585 LHS
Pedestal 08 nos of Elevated Bridge ( P18/LHS)(Design ch: 389+465) Bridge Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11976 KHPL/TK/NH-66/STR/11850 6-Feb-2024 7-Feb-2024 389+305 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P11/RHS) Bridge Bridge
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11977 KHPL/TK/NH-66/STR/11851 7-Feb-2024 8-Feb-2024 373+330 373+340 10 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11978 KHPL/TK/NH-66/STR/11852 7-Feb-2024 8-Feb-2024 372+535 372+580 45 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11979 KHPL/TK/NH-66/STR/11853 7-Feb-2024 8-Feb-2024 372+395 372+440 45 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11980 KHPL/TK/NH-66/STR/11854 7-Feb-2024 8-Feb-2024 397+430 397+500 70 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11981 KHPL/TK/NH-66/STR/11855 7-Feb-2024 8-Feb-2024 372+280 372+300 20 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11982 KHPL/TK/NH-66/STR/11856 7-Feb-2024 8-Feb-2024 372+320 372+345 25 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11983 KHPL/TK/NH-66/STR/11857 7-Feb-2024 8-Feb-2024 373+948 373+963 15 LHS Drain
Drain Slab Done
Work
11984 KHPL/TK/NH-66/STR/11858 7-Feb-2024 8-Feb-2024 Pouring PCC M-15 grade Below Drain Raft 378+645 378+650 5 LHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11985 KHPL/TK/NH-66/STR/11859 7-Feb-2024 8-Feb-2024 381+015 381+030 15 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11986 KHPL/TK/NH-66/STR/11860 7-Feb-2024 8-Feb-2024 384+055 384+065 10 LHS Drain
Drain Slab Done
Work
11987 KHPL/TK/NH-66/STR/11861 7-Feb-2024 8-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 385+115 385+120 5 LHS Drain
Done
Work
11988 KHPL/TK/NH-66/STR/11862 7-Feb-2024 8-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 387+000 387+029 29 LHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11989 KHPL/TK/NH-66/STR/11863 7-Feb-2024 8-Feb-2024 387+054 387+080 26 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11990 KHPL/TK/NH-66/STR/11864 7-Feb-2024 8-Feb-2024 393+960 393+997 37 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11991 KHPL/TK/NH-66/STR/11865 7-Feb-2024 8-Feb-2024 389+940 389+965 25 LHS Drain
Drain Slab Done
Work
11992 KHPL/TK/NH-66/STR/11866 7-Feb-2024 8-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 390+170 390+190 20 LHS Drain
Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11993 KHPL/TK/NH-66/STR/11867 7-Feb-2024 8-Feb-2024 389+305 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P11/RHS) Bridge Bridge
Elevated PSC Girder Work
11994 KHPL/TK/NH-66/STR/11868 7-Feb-2024 8-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P5-P6)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
11995 KHPL/TK/NH-66/STR/11869 7-Feb-2024 8-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,P5-P6)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
11996 KHPL/TK/NH-66/STR/11870 7-Feb-2024 8-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P8-P9)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
11997 KHPL/TK/NH-66/STR/11871 7-Feb-2024 8-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,P13-P14)(388+500) 389+465 RHS
Bridge Grouting Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11998 KHPL/TK/NH-66/STR/11872 7-Feb-2024 8-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
11999 KHPL/TK/NH-66/STR/11873 7-Feb-2024 8-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12000 KHPL/TK/NH-66/STR/11874 7-Feb-2024 8-Feb-2024 369+550 RE Panel
S5 type-11 nos, P2 type-04 nos, MG4 type-02 nos. Yard Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12001 KHPL/TK/NH-66/STR/11875 8-Feb-2024 9-Feb-2024 373+330 373+340 10 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12002 KHPL/TK/NH-66/STR/11876 8-Feb-2024 9-Feb-2024 372+280 372+300 20 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12003 KHPL/TK/NH-66/STR/11877 8-Feb-2024 9-Feb-2024 372+320 372+345 25 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12004 KHPL/TK/NH-66/STR/11878 8-Feb-2024 9-Feb-2024 372+560 372+580 20 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12005 KHPL/TK/NH-66/STR/11879 8-Feb-2024 9-Feb-2024 378+645 378+650 5 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12006 KHPL/TK/NH-66/STR/11880 8-Feb-2024 9-Feb-2024 385+115 385+120 5 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12007 KHPL/TK/NH-66/STR/11881 8-Feb-2024 9-Feb-2024 386+992 387+029 37 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12008 KHPL/TK/NH-66/STR/11882 8-Feb-2024 9-Feb-2024 387+054 387+080 26 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12009 KHPL/TK/NH-66/STR/11883 8-Feb-2024 9-Feb-2024 390+170 390+190 20 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12010 KHPL/TK/NH-66/STR/11884 8-Feb-2024 9-Feb-2024 397+430 397+450 20 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12011 KHPL/TK/NH-66/STR/11885 8-Feb-2024 9-Feb-2024 372+560 372+580 20 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12012 KHPL/TK/NH-66/STR/11886 8-Feb-2024 9-Feb-2024 373+755 373+775 20 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12013 KHPL/TK/NH-66/STR/11887 8-Feb-2024 9-Feb-2024 397+370 397+430 60 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12014 KHPL/TK/NH-66/STR/11888 8-Feb-2024 9-Feb-2024 391+737 391+749 12 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12015 KHPL/TK/NH-66/STR/11889 8-Feb-2024 9-Feb-2024 391+910 391+920 10 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12016 KHPL/TK/NH-66/STR/11890 8-Feb-2024 9-Feb-2024 396+543 396+550 7 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12017 KHPL/TK/NH-66/STR/11891 8-Feb-2024 9-Feb-2024 396+815 396+830 15 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12018 KHPL/TK/NH-66/STR/11892 8-Feb-2024 9-Feb-2024 397+470 397+500 30 LHS Drain Not done
Drain Wall 1st with Final lift
Work
12019 KHPL/TK/NH-66/STR/11893 8-Feb-2024 9-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for Retaining Wall. 372+170 372+220 50 LHS Retaining Wall
Done
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12020 KHPL/TK/NH-66/STR/11894 8-Feb-2024 9-Feb-2024 377+545 377+580 35 RHS Retaining Wall
Wall 1st lift with Final for Retaining Wall. Done
Checking of reinforcement, mould and pouring concrete M-40 grade for Plank Slab (Pre- Work
12021 KHPL/TK/NH-66/STR/11895 8-Feb-2024 9-Feb-2024 396+888 Flyover Plank Slab
Cast) (13 nos) Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
12022 KHPL/TK/NH-66/STR/11896 8-Feb-2024 9-Feb-2024 389+305 RHS
Pedestal 08 nos of Elevated Bridge ( P11/RHS) Bridge Bridge Done
Elevated PSC Girder Work
12023 KHPL/TK/NH-66/STR/11897 8-Feb-2024 9-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/RHS,P5-P6)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
12024 KHPL/TK/NH-66/STR/11898 8-Feb-2024 9-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/RHS,P2-P3)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
12025 KHPL/TK/NH-66/STR/11899 8-Feb-2024 9-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,P11-P12)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12026 KHPL/TK/NH-66/STR/11900 8-Feb-2024 9-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (IG-1/LHS,A1-P1)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
12027 KHPL/TK/NH-66/STR/11901 8-Feb-2024 9-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,P8-P9)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12028 KHPL/TK/NH-66/STR/11902 8-Feb-2024 9-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P5-P6)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
12029 KHPL/TK/NH-66/STR/11903 8-Feb-2024 9-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P2-P3)(388+500) 389+465 LHS
Bridge Grouting Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated Work
12030 KHPL/TK/NH-66/STR/11904 8-Feb-2024 9-Feb-2024 389+745 RHS
Cap of Elevated Bridge (P22/RHS) (Design ch: 389+465) Bridge Bridge Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting
12031 KHPL/TK/NH-66/STR/11905 8-Feb-2024 9-Feb-2024 386+600 RE Panel Not done
S5 type-17 nos, P2 type-07 nos. Yard
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
12032 KHPL/TK/NH-66/STR/11906 8-Feb-2024 9-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12033 KHPL/TK/NH-66/STR/11907 8-Feb-2024 9-Feb-2024 369+550 RE Panel
S5 type-10 nos, P2 type-02 nos, MG4 type-02 nos. Yard Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
12034 KHPL/TK/NH-66/STR/11908 8-Feb-2024 9-Feb-2024 389+105 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P6/RHS)(Design ch: 389+465) Bridge Bridge
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12035 KHPL/TK/NH-66/STR/11909 9-Feb-2024 10-Feb-2024 385+115 385+120 5 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12036 KHPL/TK/NH-66/STR/11910 9-Feb-2024 10-Feb-2024 386+992 387+029 37 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12037 KHPL/TK/NH-66/STR/11911 9-Feb-2024 10-Feb-2024 387+054 387+080 26 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12038 KHPL/TK/NH-66/STR/11912 9-Feb-2024 10-Feb-2024 372+345 372+380 35 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12039 KHPL/TK/NH-66/STR/11913 9-Feb-2024 10-Feb-2024 391+910 391+920 10 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12040 KHPL/TK/NH-66/STR/11914 9-Feb-2024 10-Feb-2024 393+938 393+950 12 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12041 KHPL/TK/NH-66/STR/11915 9-Feb-2024 10-Feb-2024 396+543 396+550 7 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12042 KHPL/TK/NH-66/STR/11916 9-Feb-2024 10-Feb-2024 397+430 397+450 20 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12043 KHPL/TK/NH-66/STR/11917 9-Feb-2024 10-Feb-2024 371+810 371+860 50 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12044 KHPL/TK/NH-66/STR/11918 9-Feb-2024 10-Feb-2024 372+345 372+380 35 LHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12045 KHPL/TK/NH-66/STR/11919 9-Feb-2024 10-Feb-2024 393+935 393+950 15 RHS Drain
Drain Raft Done
Work
12046 KHPL/TK/NH-66/STR/11920 9-Feb-2024 10-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 397+500 397+520 20 LHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12047 KHPL/TK/NH-66/STR/11921 9-Feb-2024 10-Feb-2024 397+450 397+500 50 LHS Drain
Drain Wall 1st with Final lift Done
Elevated Work
12048 KHPL/TK/NH-66/STR/11922 9-Feb-2024 10-Feb-2024 Reinforcement & profile checking of PSC girder of Elevated Bridge (OG-2/RHS,P8-P9) 394+000 RHS PSC Girder
Bridge Done
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated Work
12049 KHPL/TK/NH-66/STR/11923 9-Feb-2024 10-Feb-2024 394+000 RHS PSC Girder
Elevated Bridge (OG-2/RHS,P8-P9) Bridge Done
Elevated Elevated
12050 KHPL/TK/NH-66/STR/11924 9-Feb-2024 10-Feb-2024 Pile Integrity test of Routine Pile at Elevated Bridge (P09/LHS). 394+000 LHS Not done
Bridge Bridge
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12051 KHPL/TK/NH-66/STR/11925 9-Feb-2024 10-Feb-2024 372+170 372+220 50 LHS Retaining Wall
Raft of Retaining Wall. Done
Work
12052 KHPL/TK/NH-66/STR/11926 9-Feb-2024 10-Feb-2024 Reinforcement & profile checking of PSC girder of Flyover (IG-1/RHS,P1-P2) 396+888 Flyover RHS PSC Girder
Done
Checking of shuttering, centering and pouring concrete M-50 grade for PSC Girder of Work
12053 KHPL/TK/NH-66/STR/11927 9-Feb-2024 10-Feb-2024 396+888 Flyover RHS PSC Girder
Flyover (IG-1/RHS,P1-P2) Done
Work
12054 KHPL/TK/NH-66/STR/11928 9-Feb-2024 10-Feb-2024 Reinforcement & profile checking of PSC girder of Flyover (IG-2/RHS,P1-P2) 396+888 Flyover RHS PSC Girder
Done
Checking of shuttering, centering and pouring concrete M-50 grade for PSC Girder of Work
12055 KHPL/TK/NH-66/STR/11929 9-Feb-2024 10-Feb-2024 396+888 Flyover RHS PSC Girder
Flyover (IG-2/RHS,P1-P2) Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade for Work
12056 KHPL/TK/NH-66/STR/11930 9-Feb-2024 10-Feb-2024 393+397 Box Culvert LHS S/R Box Culvert
Box Culvert Raft with Bottom Haunch (SR) Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade for Work
12057 KHPL/TK/NH-66/STR/11931 9-Feb-2024 10-Feb-2024 393+397 Box Culvert LHS MCW Box Culvert
Box Culvert Raft with Bottom Haunch (MCW) Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated
12058 KHPL/TK/NH-66/STR/11932 9-Feb-2024 10-Feb-2024 394+560 RHS Not done
Cap of Elevated Bridge (P04/RHS) Bridge Bridge
Elevated PSC Girder Work
12059 KHPL/TK/NH-66/STR/11933 9-Feb-2024 10-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (IG-2/LHS,P3-P4)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
12060 KHPL/TK/NH-66/STR/11934 9-Feb-2024 10-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (IG-2/RHS,P3-P4)(388+500) 389+465 RHS
Bridge stressing Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12061 KHPL/TK/NH-66/STR/11935 9-Feb-2024 10-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
12062 KHPL/TK/NH-66/STR/11936 9-Feb-2024 10-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard

Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12063 KHPL/TK/NH-66/STR/11937 9-Feb-2024 10-Feb-2024 369+550 RE Panel
SR4 type-01 nos, S5 type-20 nos, P2 type-06 nos, MG4 type-02 nos, TB6 type-01 nos Yard Done

Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
12064 KHPL/TK/NH-66/STR/11938 9-Feb-2024 10-Feb-2024 389+105 RHS
Pedestal 08 nos of Elevated Bridge ( P6/RHS)(Design ch: 389+465) Bridge Bridge Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12065 KHPL/TK/NH-66/STR/11939 10-Feb-2024 11-Feb-2024 385+115 385+125 10 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12066 KHPL/TK/NH-66/STR/11940 10-Feb-2024 11-Feb-2024 386+992 387+029 37 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12067 KHPL/TK/NH-66/STR/11941 10-Feb-2024 11-Feb-2024 372+170 372+220 50 LHS Retaining Wall
Wall 1st lift with Final for Retaining Wall. Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12068 KHPL/TK/NH-66/STR/11942 10-Feb-2024 11-Feb-2024 372+345 372+380 35 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12069 KHPL/TK/NH-66/STR/11943 10-Feb-2024 11-Feb-2024 372+535 372+560 25 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12070 KHPL/TK/NH-66/STR/11944 10-Feb-2024 11-Feb-2024 391+910 391+920 10 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12071 KHPL/TK/NH-66/STR/11945 10-Feb-2024 11-Feb-2024 396+543 396+550 7 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12072 KHPL/TK/NH-66/STR/11946 10-Feb-2024 11-Feb-2024 371+810 371+860 50 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12073 KHPL/TK/NH-66/STR/11947 10-Feb-2024 11-Feb-2024 397+500 397+520 20 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12074 KHPL/TK/NH-66/STR/11948 10-Feb-2024 11-Feb-2024 397+445 397+475 30 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12075 KHPL/TK/NH-66/STR/11949 10-Feb-2024 11-Feb-2024 393+935 393+950 15 RHS Drain
Drain Wall 1st with Final lift Done
Work
12076 KHPL/TK/NH-66/STR/11950 10-Feb-2024 11-Feb-2024 Checking of Level & Erection of Drain Pre- Cast. 395+860 395+940 80 RHS Drain Erection
Done
Work
12077 KHPL/TK/NH-66/STR/11951 10-Feb-2024 11-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 396+250 396+280 30 LHS Drain
Done
Work
12078 KHPL/TK/NH-66/STR/11952 10-Feb-2024 11-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for Retaining Wall. 392+086 392+160 74 LHS Retaining Wall
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated
12079 KHPL/TK/NH-66/STR/11953 10-Feb-2024 11-Feb-2024 394+000 RHS Not done
Elevated Bridge outer-side pier Shaft (Pier No. P02/RHS) (Ch.393+910) Bridge Bridge
Reinforcement, Shuttering checking & pouring concrete M-40 grade of Cross Girder Work
12080 KHPL/TK/NH-66/STR/11954 10-Feb-2024 11-Feb-2024 371+295 Flyover LHS Cross Girder
(Span P1-P2 towards P2/LHS, nos of 03 at Flyover Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade for Work
12081 KHPL/TK/NH-66/STR/11955 10-Feb-2024 11-Feb-2024 388+027 Box Culvert RHS MCW Box Culvert
Box Culvert Raft with Bottom Haunch (MCW) Done
Checking of excavation, level, layout and pouring PCC (M-15) grade for Box Culvert Work
12082 KHPL/TK/NH-66/STR/11956 10-Feb-2024 11-Feb-2024 388+064 Box Culvert RHS MCW Box Culvert
(MCW) Done
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated
12083 KHPL/TK/NH-66/STR/11957 10-Feb-2024 11-Feb-2024 394+000 RHS Not done
Pile Cap of Elevated Bridge (Pier No. P01/LHS) (Ch.393+880) Bridge Bridge
Major PSC Girder Work
12084 KHPL/TK/NH-66/STR/11958 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-1/RHS,P2-P3) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12085 KHPL/TK/NH-66/STR/11959 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-1/RHS,P2-P3) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12086 KHPL/TK/NH-66/STR/11960 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-2/RHS,P2-P3) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12087 KHPL/TK/NH-66/STR/11961 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-3/RHS,P2-P3) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12088 KHPL/TK/NH-66/STR/11962 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-2/RHS,P2-P3) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12089 KHPL/TK/NH-66/STR/11963 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-1/LHS,P2-P3) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12090 KHPL/TK/NH-66/STR/11964 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-1/LHS,P2-P3) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12091 KHPL/TK/NH-66/STR/11965 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-2/LHS,P2-P3) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12092 KHPL/TK/NH-66/STR/11966 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-3/LHS,P2-P3) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12093 KHPL/TK/NH-66/STR/11967 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-2/LHS,P2-P3) 387+230 LHS
Bridge Grouting Done
Reinforcement & profile checking of PSC girder (IG-1/LHS,P11-P12) (Casting Ch: Elevated Work
12094 KHPL/TK/NH-66/STR/11968 10-Feb-2024 11-Feb-2024 389+465 LHS PSC Girder
388+550). Bridge Done
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated Work
12095 KHPL/TK/NH-66/STR/11969 10-Feb-2024 11-Feb-2024 389+465 LHS PSC Girder
Elevated Bridge (IG-1/LHS,P11-P12) (Casting Ch: 388+550) Bridge Done
Reinforcement & profile checking of PSC girder (IG-2/LHS,P11-P12) (Casting Ch: Elevated
12096 KHPL/TK/NH-66/STR/11970 10-Feb-2024 11-Feb-2024 389+465 LHS PSC Girder Not done
388+550). Bridge
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated
12097 KHPL/TK/NH-66/STR/11971 10-Feb-2024 11-Feb-2024 389+465 LHS PSC Girder Not done
Elevated Bridge (IG-2/LHS,P11-P12) (Casting Ch: 388+550) Bridge
Elevated PSC Girder Work
12098 KHPL/TK/NH-66/STR/11972 10-Feb-2024 11-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (IG-2/LHS,P1-P2)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
12099 KHPL/TK/NH-66/STR/11973 10-Feb-2024 11-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (IG-2/RHS,P1-P2)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
12100 KHPL/TK/NH-66/STR/11974 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/RHS,P8-P9)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12101 KHPL/TK/NH-66/STR/11975 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P8-P9)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
12102 KHPL/TK/NH-66/STR/11976 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P11-P12)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
12103 KHPL/TK/NH-66/STR/11977 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/RHS,P11-P12)(388+500) 389+465 RHS
Bridge Grouting Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated Work
12104 KHPL/TK/NH-66/STR/11978 10-Feb-2024 11-Feb-2024 388+905 RHS
Cap of Elevated Bridge (P01/RHS) Bridge Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated
12105 KHPL/TK/NH-66/STR/11979 10-Feb-2024 11-Feb-2024 389+985 LHS Not done
Cap of Elevated Bridge (P28/LHS) Bridge Bridge
Elevated Work
12106 KHPL/TK/NH-66/STR/11980 10-Feb-2024 11-Feb-2024 Reinforcement & profile checking of PSC girder of Elevated Bridge (OG-2/LHS,P8-P9) 394+000 LHS PSC Girder
Bridge Done
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated Work
12107 KHPL/TK/NH-66/STR/11981 10-Feb-2024 11-Feb-2024 394+000 LHS PSC Girder
Elevated Bridge (OG-2/LHS,P8-P9) Bridge Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12108 KHPL/TK/NH-66/STR/11982 10-Feb-2024 11-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
12109 KHPL/TK/NH-66/STR/11983 10-Feb-2024 11-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12110 KHPL/TK/NH-66/STR/11984 10-Feb-2024 11-Feb-2024 369+550 RE Panel
S5 type-12 nos. Yard Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12111 KHPL/TK/NH-66/STR/11985 11-Feb-2024 12-Feb-2024 371+810 371+860 50 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12112 KHPL/TK/NH-66/STR/11986 11-Feb-2024 12-Feb-2024 393+932 393+960 28 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12113 KHPL/TK/NH-66/STR/11987 11-Feb-2024 12-Feb-2024 396+250 396+280 30 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12114 KHPL/TK/NH-66/STR/11988 11-Feb-2024 12-Feb-2024 371+780 371+810 30 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12115 KHPL/TK/NH-66/STR/11989 11-Feb-2024 12-Feb-2024 372+395 372+440 45 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12116 KHPL/TK/NH-66/STR/11990 11-Feb-2024 12-Feb-2024 394+465 394+490 25 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12117 KHPL/TK/NH-66/STR/11991 11-Feb-2024 12-Feb-2024 396+253 396+280 27 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12118 KHPL/TK/NH-66/STR/11992 11-Feb-2024 12-Feb-2024 373+775 373+800 25 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12119 KHPL/TK/NH-66/STR/11993 11-Feb-2024 12-Feb-2024 394+475 394+490 15 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12120 KHPL/TK/NH-66/STR/11994 11-Feb-2024 12-Feb-2024 372+160 372+173 13 RHS Drain
Drain Slab Done
Work
12121 KHPL/TK/NH-66/STR/11995 11-Feb-2024 12-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 389+985 390+000 15 LHS Drain
Done
Work
12122 KHPL/TK/NH-66/STR/11996 11-Feb-2024 12-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 397+185 397+230 45 LHS Drain
Done
Work
12123 KHPL/TK/NH-66/STR/11997 11-Feb-2024 12-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 397+520 397+540 20 LHS Drain
Done
Work
12124 KHPL/TK/NH-66/STR/11998 11-Feb-2024 12-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 375+250 375+285 35 LHS Drain
Done
Reinforcement, Shuttering checking & pouring concrete M-40 grade of Cross Girder Work
12125 KHPL/TK/NH-66/STR/11999 11-Feb-2024 12-Feb-2024 371+295 Flyover RHS Cross Girder
(Span P1-P2 towards P1/RHS, nos of 03 at Flyover Done
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated
12126 KHPL/TK/NH-66/STR/12000 11-Feb-2024 12-Feb-2024 394+000 RHS Not done
Pile Cap of Elevated Bridge (Pier No. P01/RHS) (Ch.393+880) Bridge Bridge
Work
12127 KHPL/TK/NH-66/STR/12001 11-Feb-2024 12-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for Retaining Wall. 391+999 392+086 87 LHS Retaining Wall
Done
Work
12128 KHPL/TK/NH-66/STR/12002 11-Feb-2024 12-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for L-Type Retaining Wall. 391+108 391+128 20 LHS Retaining Wall
Done
Work
12129 KHPL/TK/NH-66/STR/12003 11-Feb-2024 12-Feb-2024 Reinforcement & profile checking of PSC girder of Flyover (OG-2/LHS,P1-P2) 396+888 Flyover LHS PSC Girder
Done
Checking of shuttering, centering and pouring concrete M-50 grade for PSC Girder of Work
12130 KHPL/TK/NH-66/STR/12004 11-Feb-2024 12-Feb-2024 396+888 Flyover LHS PSC Girder
Flyover (OG-2/LHS,P1-P2) Done
Major PSC Girder Work
12131 KHPL/TK/NH-66/STR/12005 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-1/RHS,P1-P2) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12132 KHPL/TK/NH-66/STR/12006 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-1/RHS,P1-P2) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12133 KHPL/TK/NH-66/STR/12007 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-2/RHS,P1-P2) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12134 KHPL/TK/NH-66/STR/12008 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-2/RHS,P1-P2) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12135 KHPL/TK/NH-66/STR/12009 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-3/RHS,P1-P2) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12136 KHPL/TK/NH-66/STR/12010 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-1/LHS,P1-P2) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12137 KHPL/TK/NH-66/STR/12011 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-1/LHS,P1-P2) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12138 KHPL/TK/NH-66/STR/12012 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-3/LHS,P1-P2) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12139 KHPL/TK/NH-66/STR/12013 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-2/LHS,P1-P2) 387+230 LHS
Bridge Grouting Done
Work
12140 KHPL/TK/NH-66/STR/12014 11-Feb-2024 12-Feb-2024 Reinforcement & profile checking of PSC girder of Flyover (IG-1/LHS,P1-P2) 396+888 Flyover LHS PSC Girder
Done
Checking of shuttering, centering and pouring concrete M-50 grade for PSC Girder of Work
12141 KHPL/TK/NH-66/STR/12015 11-Feb-2024 12-Feb-2024 396+888 Flyover LHS PSC Girder
Flyover (IG-1/LHS,P1-P2) Done
Checking of shuttering, centering and pouring concrete M-40 grade for RCC Girder of
12142 KHPL/TK/NH-66/STR/12016 11-Feb-2024 12-Feb-2024 396+888 Flyover LHS RCC Girder Not done
Flyover (IG-2/LHS, A1-P1)
Elevated PSC Girder Work
12143 KHPL/TK/NH-66/STR/12017 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (IG-1/RHS,A1-P1)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12144 KHPL/TK/NH-66/STR/12018 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P11-P12)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
12145 KHPL/TK/NH-66/STR/12019 11-Feb-2024 12-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/LHS,P13-P14)(388+500) 389+465 LHS
Bridge stressing Done
Reinforcement & profile checking of PSC girder (IG-2/LHS,P11-P12) (Casting Ch: Elevated Work
12146 KHPL/TK/NH-66/STR/12020 11-Feb-2024 12-Feb-2024 389+465 LHS PSC Girder
388+550). Bridge Done
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated Work
12147 KHPL/TK/NH-66/STR/12021 11-Feb-2024 12-Feb-2024 389+465 LHS PSC Girder
Elevated Bridge (IG-2/LHS,P11-P12) (Casting Ch: 388+550) Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated Work
12148 KHPL/TK/NH-66/STR/12022 11-Feb-2024 12-Feb-2024 394+560 RHS
Cap of Elevated Bridge (P04/RHS) Bridge Bridge Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12149 KHPL/TK/NH-66/STR/12023 11-Feb-2024 12-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
12150 KHPL/TK/NH-66/STR/12024 11-Feb-2024 12-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12151 KHPL/TK/NH-66/STR/12025 11-Feb-2024 12-Feb-2024 369+550 RE Panel
S5 type-10 nos, P2 type-02 nos, MG4 type-02 nos. Yard Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12152 KHPL/TK/NH-66/STR/12026 11-Feb-2024 12-Feb-2024 372+560 372+580 20 LHS Drain Repeated
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12153 KHPL/TK/NH-66/STR/12027 11-Feb-2024 12-Feb-2024 378+645 378+650 5 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12154 KHPL/TK/NH-66/STR/12028 11-Feb-2024 12-Feb-2024 385+115 385+120 5 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12155 KHPL/TK/NH-66/STR/12029 11-Feb-2024 12-Feb-2024 386+992 387+029 37 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12156 KHPL/TK/NH-66/STR/12030 11-Feb-2024 12-Feb-2024 387+054 387+080 26 LHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12157 KHPL/TK/NH-66/STR/12031 11-Feb-2024 12-Feb-2024 390+170 390+190 20 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12158 KHPL/TK/NH-66/STR/12032 11-Feb-2024 12-Feb-2024 390+170 390+190 20 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12159 KHPL/TK/NH-66/STR/12033 11-Feb-2024 12-Feb-2024 397+430 397+450 20 LHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12160 KHPL/TK/NH-66/STR/12034 11-Feb-2024 12-Feb-2024 372+560 372+580 20 LHS Drain Repeated
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12161 KHPL/TK/NH-66/STR/12035 12-Feb-2024 13-Feb-2024 391+999 392+103 104 LHS Retaining Wall
Raft of Retaining Wall. Done
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12162 KHPL/TK/NH-66/STR/12036 12-Feb-2024 13-Feb-2024 391+108 391+128 20 LHS Retaining Wall
Raft of L-Type Retaining Wall. Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12163 KHPL/TK/NH-66/STR/12037 12-Feb-2024 13-Feb-2024 396+250 396+280 30 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12164 KHPL/TK/NH-66/STR/12038 12-Feb-2024 13-Feb-2024 371+780 371+810 30 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12165 KHPL/TK/NH-66/STR/12039 12-Feb-2024 13-Feb-2024 394+475 394+490 15 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12166 KHPL/TK/NH-66/STR/12040 12-Feb-2024 13-Feb-2024 396+253 396+280 27 LHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12167 KHPL/TK/NH-66/STR/12041 12-Feb-2024 13-Feb-2024 372+395 372+440 45 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12168 KHPL/TK/NH-66/STR/12042 12-Feb-2024 13-Feb-2024 394+475 394+490 15 LHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12169 KHPL/TK/NH-66/STR/12043 12-Feb-2024 13-Feb-2024 389+985 390+000 15 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12170 KHPL/TK/NH-66/STR/12044 12-Feb-2024 13-Feb-2024 397+520 397+540 20 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12171 KHPL/TK/NH-66/STR/12045 12-Feb-2024 13-Feb-2024 370+920 370+945 25 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12172 KHPL/TK/NH-66/STR/12046 12-Feb-2024 13-Feb-2024 390+160 390+190 30 LHS Drain
Drain Wall 1st with Final lift Done
Work
12173 KHPL/TK/NH-66/STR/12047 12-Feb-2024 13-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 395+580 395+623 43 LHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12174 KHPL/TK/NH-66/STR/12048 12-Feb-2024 13-Feb-2024 397+500 397+510 10 LHS Drain Not done
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12175 KHPL/TK/NH-66/STR/12049 12-Feb-2024 13-Feb-2024 397+475 397+500 25 LHS Drain Not done
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12176 KHPL/TK/NH-66/STR/12050 12-Feb-2024 13-Feb-2024 372+090 372+100 10 RHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12177 KHPL/TK/NH-66/STR/12051 12-Feb-2024 13-Feb-2024 384+372 384+385 13 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12178 KHPL/TK/NH-66/STR/12052 12-Feb-2024 13-Feb-2024 391+615 391+630 15 RHS Drain
Drain Raft Done
Reinforcement, Shuttering checking & pouring concrete M-35 grade of RCC Cross Girder RCC Cross Work
12179 KHPL/TK/NH-66/STR/12053 12-Feb-2024 13-Feb-2024 371+295 Flyover RHS
(Span A1-P1 towards P1/RHS, nos of 03 at Flyover Girder Done
Reinforcement, Shuttering checking & pouring concrete M-35 grade of RCC Cross Girder RCC Cross Work
12180 KHPL/TK/NH-66/STR/12054 12-Feb-2024 13-Feb-2024 371+295 Flyover LHS
(Span A1-P1 towards P1/LHS, nos of 03 at Flyover Girder Done
Elevated Work
12181 KHPL/TK/NH-66/STR/12055 12-Feb-2024 13-Feb-2024 Reinforcement & profile checking of PSC girder of Elevated Bridge (IG-1/LHS,P8-P9) 394+000 RHS PSC Girder
Bridge Done
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated Work
12182 KHPL/TK/NH-66/STR/12056 12-Feb-2024 13-Feb-2024 394+000 RHS PSC Girder
Elevated Bridge (IG-1/LHS,P8-P9) Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
12183 KHPL/TK/NH-66/STR/12057 12-Feb-2024 13-Feb-2024 389+105 LHS
Pedestal 08 nos of Elevated Bridge ( P6/LHS)(Design ch: 389+465) Bridge Bridge Done
Checking of shuttering, centering and pouring concrete M-40 grade for RCC Girder of
12184 KHPL/TK/NH-66/STR/12058 12-Feb-2024 13-Feb-2024 396+888 Flyover LHS RCC Girder Not done
Flyover (IG-2/LHS, A1-P1)
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade for Work
12185 KHPL/TK/NH-66/STR/12059 12-Feb-2024 13-Feb-2024 388+027 Box Culvert RHS MCW Box Culvert
Box Culvert Wall 1st lift (MCW) Done
Elevated PSC Girder Work
12186 KHPL/TK/NH-66/STR/12060 12-Feb-2024 13-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,A1-P1)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
12187 KHPL/TK/NH-66/STR/12061 12-Feb-2024 13-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/RHS,A1-P1)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12188 KHPL/TK/NH-66/STR/12062 12-Feb-2024 13-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,A1-P1)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12189 KHPL/TK/NH-66/STR/12063 12-Feb-2024 13-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/RHS,P2-P3)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12190 KHPL/TK/NH-66/STR/12064 12-Feb-2024 13-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P13-P14)(388+500) 389+465 LHS
Bridge Grouting Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12191 KHPL/TK/NH-66/STR/12065 12-Feb-2024 13-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting Work
12192 KHPL/TK/NH-66/STR/12066 12-Feb-2024 13-Feb-2024 397+300 Pre-Cast Drain
(14 nos) Yard Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12193 KHPL/TK/NH-66/STR/12067 12-Feb-2024 13-Feb-2024 369+550 RE Panel
S5 type-10 nos, P2 type-04 nos, MG4 type-02 nos. Yard Done
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12194 KHPL/TK/NH-66/STR/12068 13-Feb-2024 14-Feb-2024 391+108 391+128 20 LHS Retaining Wall
Wall 1st lift for L-Type Retaining Wall. Done
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12195 KHPL/TK/NH-66/STR/12069 13-Feb-2024 14-Feb-2024 377+500 377+545 45 RHS Retaining Wall
Wall 1st lift with Final for Retaining Wall. Done
Work
12196 KHPL/TK/NH-66/STR/12070 13-Feb-2024 14-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for Retaining Wall. 377+600 377+680 80 LHS Retaining Wall
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12197 KHPL/TK/NH-66/STR/12071 13-Feb-2024 14-Feb-2024 394+475 394+490 15 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12198 KHPL/TK/NH-66/STR/12072 13-Feb-2024 14-Feb-2024 370+920 370+945 25 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12199 KHPL/TK/NH-66/STR/12073 13-Feb-2024 14-Feb-2024 371+780 371+810 30 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12200 KHPL/TK/NH-66/STR/12074 13-Feb-2024 14-Feb-2024 389+985 390+000 15 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12201 KHPL/TK/NH-66/STR/12075 13-Feb-2024 14-Feb-2024 372+090 372+100 10 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12202 KHPL/TK/NH-66/STR/12076 13-Feb-2024 14-Feb-2024 391+615 391+630 15 RHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12203 KHPL/TK/NH-66/STR/12077 13-Feb-2024 14-Feb-2024 370+900 370+920 20 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12204 KHPL/TK/NH-66/STR/12078 13-Feb-2024 14-Feb-2024 390+160 390+190 30 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12205 KHPL/TK/NH-66/STR/12079 13-Feb-2024 14-Feb-2024 397+185 397+230 45 LHS Drain
Drain Raft Done
Work
12206 KHPL/TK/NH-66/STR/12080 13-Feb-2024 14-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 394+760 394+800 40 LHS Drain
Done
Work
12207 KHPL/TK/NH-66/STR/12081 13-Feb-2024 14-Feb-2024 Reinforcement & profile checking of PSC girder of Flyover (IG-2/LHS,P1-P2) 396+888 Flyover LHS PSC Girder
Done
Checking of shuttering, centering and pouring concrete M-50 grade for PSC Girder of Work
12208 KHPL/TK/NH-66/STR/12082 13-Feb-2024 14-Feb-2024 396+888 Flyover LHS PSC Girder
Flyover (IG-2/LHS,P1-P2) Done
Elevated PSC Girder Work
12209 KHPL/TK/NH-66/STR/12083 13-Feb-2024 14-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (IG-2/RHS,A1-P1)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
12210 KHPL/TK/NH-66/STR/12084 13-Feb-2024 14-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/RHS,P13-P14)(388+500) 389+465 RHS
Bridge stressing Done
Major PSC Girder Work
12211 KHPL/TK/NH-66/STR/12085 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-1/RHS,A1-P1) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12212 KHPL/TK/NH-66/STR/12086 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-1/RHS,A1-P1) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12213 KHPL/TK/NH-66/STR/12087 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-2/RHS,A1-P1) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12214 KHPL/TK/NH-66/STR/12088 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-3/RHS,A1-P1) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12215 KHPL/TK/NH-66/STR/12089 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-1/LHS,A1-P1) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12216 KHPL/TK/NH-66/STR/12090 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-1/LHS,A1-P1) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12217 KHPL/TK/NH-66/STR/12091 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-2/LHS,A1-P1) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12218 KHPL/TK/NH-66/STR/12092 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-3/LHS,A1-P1) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12219 KHPL/TK/NH-66/STR/12093 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-2/LHS,A1-P1) 387+230 LHS
Bridge Grouting Done
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated Work
12220 KHPL/TK/NH-66/STR/12094 13-Feb-2024 14-Feb-2024 394+000 LHS
Pile Cap of Elevated Bridge (Pier No. P09/LHS) (Ch.394+120) Bridge Bridge Done
Status
Reinforcement & profile checking of PSC girder (IG-1/RHS,P11-P12) (Casting Ch: Elevated
12221 KHPL/TK/NH-66/STR/12095 13-Feb-2024 14-Feb-2024 389+465 RHS PSC Girder not
388+550). Bridge
Received
Status
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated
12222 KHPL/TK/NH-66/STR/12096 13-Feb-2024 14-Feb-2024 389+465 RHS PSC Girder not
Elevated Bridge (IG-1/RHS,P11-P12) (Casting Ch: 388+550) Bridge
Received
Status
Reinforcement, Shuttering checking & pouring concrete M-35 grade of RCC Cross Girder RCC Cross
12223 KHPL/TK/NH-66/STR/12097 13-Feb-2024 14-Feb-2024 371+295 Flyover LHS not
(Span P2-A2 towards P2/LHS, nos of 03 at Flyover Girder
Received
Status
Reinforcement, Shuttering checking & pouring concrete M-35 grade of RCC Cross Girder RCC Cross
12224 KHPL/TK/NH-66/STR/12098 13-Feb-2024 14-Feb-2024 371+295 Flyover LHS not
(Span A1-P1 towards A1/LHS, nos of 03 at Flyover Girder
Received
Status
Reinforcement, Shuttering checking & pouring concrete M-35 grade of RCC Cross Girder RCC Cross
12225 KHPL/TK/NH-66/STR/12099 13-Feb-2024 14-Feb-2024 371+295 Flyover RHS not
(Span A1-P1 towards A1/RHS, nos of 03 at Flyover Girder
Received
Checking of shuttering, centering and pouring concrete M-40 grade for RCC Girder of Work
12226 KHPL/TK/NH-66/STR/12100 13-Feb-2024 14-Feb-2024 396+888 Flyover LHS RCC Girder
Flyover (IG-2/LHS, A1-P1) Done
Major PSC Girder Work
12227 KHPL/TK/NH-66/STR/12101 13-Feb-2024 14-Feb-2024 Checking of stressing for PSC girder Major Bridge (OG-2/RHS,A1-P1) 387+230 RHS
Bridge stressing Done
Status
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated
12228 KHPL/TK/NH-66/STR/12102 13-Feb-2024 14-Feb-2024 394+000 RHS not
Elevated Bridge outer-side pier Shaft (Pier No. P02/RHS) (Ch.393+910) Bridge Bridge
Received
Status
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated
12229 KHPL/TK/NH-66/STR/12103 13-Feb-2024 14-Feb-2024 394+000 RHS not
Pile Cap of Elevated Bridge (Pier No. P01/LHS) (Ch.393+880) Bridge Bridge
Received
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated Work
12230 KHPL/TK/NH-66/STR/12104 13-Feb-2024 14-Feb-2024 389+985 LHS
Cap of Elevated Bridge (P28/LHS) Bridge Bridge Done
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated Work
12231 KHPL/TK/NH-66/STR/12105 13-Feb-2024 14-Feb-2024 394+000 RHS
Pile Cap of Elevated Bridge (Pier No. P01/RHS) (Ch.393+880) Bridge Bridge Done
Reinforcement, Shuttering checking & pouring concrete M-40 grade of Cross Girder Work
12232 KHPL/TK/NH-66/STR/12106 13-Feb-2024 14-Feb-2024 371+295 Flyover RHS Cross Girder
(Span P1-P2 towards P2/RHS, nos of 03 at Flyover Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12233 KHPL/TK/NH-66/STR/12107 13-Feb-2024 14-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
12234 KHPL/TK/NH-66/STR/12108 13-Feb-2024 14-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting Work
12235 KHPL/TK/NH-66/STR/12109 13-Feb-2024 14-Feb-2024 386+400 Pre-Cast Drain
(06 nos) Yard Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12236 KHPL/TK/NH-66/STR/12110 13-Feb-2024 14-Feb-2024 369+550 RE Panel
S5 type-29 nos, P2 type-06 nos, MG4 type-02 nos. Yard Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12237 KHPL/TK/NH-66/STR/12111 14-Feb-2024 15-Feb-2024 391+615 391+630 15 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12238 KHPL/TK/NH-66/STR/12112 14-Feb-2024 15-Feb-2024 370+900 370+945 45 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12239 KHPL/TK/NH-66/STR/12113 14-Feb-2024 15-Feb-2024 371+760 371+780 20 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12240 KHPL/TK/NH-66/STR/12114 14-Feb-2024 15-Feb-2024 389+985 390+000 15 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12241 KHPL/TK/NH-66/STR/12115 14-Feb-2024 15-Feb-2024 396+250 396+272 22 LHS Drain
Drain Slab Done
Work
12242 KHPL/TK/NH-66/STR/12116 14-Feb-2024 15-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 372+535 372+560 25 RHS Drain
Done
Status
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12243 KHPL/TK/NH-66/STR/12117 14-Feb-2024 15-Feb-2024 397+500 397+530 30 LHS Drain not
Drain Wall 1st with Final lift
Received
Status
Elevated
12244 KHPL/TK/NH-66/STR/12118 14-Feb-2024 15-Feb-2024 Reinforcement & profile checking of PSC girder of Elevated Bridge (IG-2/LHS,P8-P9) 394+000 LHS PSC Girder not
Bridge
Received
Status
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated
12245 KHPL/TK/NH-66/STR/12119 14-Feb-2024 15-Feb-2024 394+000 LHS PSC Girder not
Elevated Bridge (IG-2/LHS,P8-P9) Bridge
Received
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12246 KHPL/TK/NH-66/STR/12120 14-Feb-2024 15-Feb-2024 377+600 377+640 40 LHS Retaining Wall
Raft of Retaining Wall. Done
Elevated PSC Girder Work
12247 KHPL/TK/NH-66/STR/12121 14-Feb-2024 15-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (IG-2/LHS,P3-P4) (388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
12248 KHPL/TK/NH-66/STR/12122 14-Feb-2024 15-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (IG-2/RHS,P3-P4) (388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12249 KHPL/TK/NH-66/STR/12123 14-Feb-2024 15-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/RHS,P5-P6)(388+500) 389+465 RHS
Bridge Grouting Done
Major PSC Girder Work
12250 KHPL/TK/NH-66/STR/12124 14-Feb-2024 15-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-2/RHS,A1-P1) 387+230 RHS
Bridge Grouting Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
12251 KHPL/TK/NH-66/STR/12125 14-Feb-2024 15-Feb-2024 388+905 LHS
Pedestal 08 nos of Elevated Bridge ( P01/LHS)(Design ch: 389+465) Bridge Bridge Done
Status
Plank Slab
12252 KHPL/TK/NH-66/STR/12126 14-Feb-2024 15-Feb-2024 Checking of Plank Slab Erection of RCC Girder (Span A1-P1/RHS) at Flyover 371+295 Flyover RHS not
Erection
Received
Status
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel S5 Casting
12253 KHPL/TK/NH-66/STR/12127 14-Feb-2024 15-Feb-2024 386+600 RE Panel not
type-17 nos, P2 type-07 nos. Yard
Received
Status
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
12254 KHPL/TK/NH-66/STR/12128 14-Feb-2024 15-Feb-2024 397+300 Pre-Cast Drain not
(14 nos) Yard
Received
Status
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
12255 KHPL/TK/NH-66/STR/12129 14-Feb-2024 15-Feb-2024 386+300 Pre-Cast Drain not
(06 nos) Yard
Received
Status
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel S5 Casting
12256 KHPL/TK/NH-66/STR/12130 14-Feb-2024 15-Feb-2024 369+550 RE Panel not
type-10 nos, P2 type-02 nos, MG4 type-02 nos. Yard
Received
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12257 KHPL/TK/NH-66/STR/12131 14-Feb-2024 15-Feb-2024 378+645 378+650 5 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12258 KHPL/TK/NH-66/STR/12132 14-Feb-2024 15-Feb-2024 385+115 385+120 5 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12259 KHPL/TK/NH-66/STR/12133 14-Feb-2024 15-Feb-2024 386+992 387+029 37 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12260 KHPL/TK/NH-66/STR/12134 14-Feb-2024 15-Feb-2024 387+054 387+080 26 LHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12261 KHPL/TK/NH-66/STR/12135 14-Feb-2024 15-Feb-2024 390+170 390+190 20 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12262 KHPL/TK/NH-66/STR/12136 14-Feb-2024 15-Feb-2024 390+170 390+190 20 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12263 KHPL/TK/NH-66/STR/12137 14-Feb-2024 15-Feb-2024 397+430 397+450 20 LHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12264 KHPL/TK/NH-66/STR/12138 14-Feb-2024 15-Feb-2024 372+560 372+580 20 LHS Drain Repeated
Drain Slab
Status
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade for
12265 KHPL/TK/NH-66/STR/12139 14-Feb-2024 15-Feb-2024 393+833 Box Culvert RHS S/R Box Culvert not
Box Culvert Wall Final lift, Top Haunch with Slab (SR)
Received