Name of Project:
Name of Client: Design by: [Link] Ahmmed
DagonBhuiyan,feni, Phone 01670490920
DESIGN OF PILE CAP
INPUT DATA:
Maximum column Load P= 80,000 Lb
Bearing Capacity of Pile q= 20,000 LBS/PILE
Size of Column Width 18 Inch
Short side 18 Inch
Ultimate Strength of steel fy = 40000 psi
Ultimate Stress of Concrete fc' = 2,500 psi
Working Stress of Steel fs = 18,000 psi
Working Stress of Concretel fc = 1,125 psi
Shearing stress vc = 55 psi
Peripheral shearing stress vp = 100 psi
Unit wt. of Concrete w= 150 psf
Pile Diameter 18 Inch
Ec= w1.5x33Öfc' k= n/(n+r)
Ec= 3,031,244 PSI k= 0.374
Es= 2.90E+07 psi j= 1- k / 3
n= Es/Ec j= 0.875
n= 10 R= 1/2 fc j k
r= fs/fc R= 184
r= 16
DESIGN :
Weigth of the footing= 10 % of column Wt.)
Weigth of the footing= 8000 Lb
Estimated Design Weigth of the footing P1= 80,000+8,000
P1 = 88000 Lb
Number of pile required = 88,000/20,000
= 4.40 Nos.
Provided No of pile = 5 Nos.
Center to center spacing of piles S = 3 ft 80000 Lb
Distance from C/L of pile to the face of fotting= 1.25 ft 18 18
Width of footing B/L = 3.00+2.50 ft
B/L = 5.5 ft 16.00
Provided size of Footing 16000 1.375
B= 6.75 ft
L= 6.75 ft 6.75ft
Provided area of Footing, A= 45.56 ft2
The net upward pressure per pile
w= P/N
= 80,000 / 4 6.75ft
w= 16,000 lb
Bending Moment at the face of M= 2wc
= 2x16,000x1.375 0.29
M= 528000 Lb-inch
The minimum effective depth, d= ÖM/Rb
= SQRT(528,000/184x81)
d= 5.95 inch
Provided effective depth, d= 13.00 inch
Shearing StressChecking, v= V/bd Shearing stress is critical at a distance "d" from
= 32,000/81x13 the face of column
v= 30.39 psi Maximum shear,V= 16,000x2
Shear Check Ok V= 32000 Lb
Punching Shearing Stress Checking Punching Shear is critical at a distance "d/2" from
v= V/bod the face of column
= 64,000/124.0x13.0 Maximum shear,V= 4x16,000
v= 39.70 psi V= 64000 Lb
Shear Check Ok bo= 2x(31.00+31.00)
bo= 124.00 inch
Punching Shearing Stress Checking
v= V/bod V= 16000.00
= 16,000/56.55x13.00 b= 56.55 inch
v= 21.76 psi
Shear Check Ok
Tesile Reinforcment: As=M/fsjd
As= 528,000/18,000x0.875x13.0
As= 2.578 inch2
Provide # 4 bar
Spacing of reinforcement, S= (X-Sectional Area of Provided bar x 12xB) / As
S= 0.20x6.75x12/2.578
S= 6 inch C/C
So provide # 4 6.75 inch C/C
Total Number of reinforcing bar (B*12-6)/S +1
n= #VALUE!
n= #VALUE! nos
The perimeter of # 4
= 1.57 inch
The Bond stress u= V/åojd Maximum shear,V= 16,000.00x2
u= #VALUE! V= 32000 Lb
u= #VALUE! psi
Name of Project:
Name of Client: Design by: Engr. Masud Ahmmed
DagonBhuiyan,feni, Phone 01670490920
DESIGN OF PILE CAP
INPUT DATA:
Maximum column Load P= 200,000 Lb
Bearing Capacity of Pile q= 116,000 LBS/PILE
Size of Column, width 10 Inch
depth 18 Inch
Ultimate Strength of steel fy = 72000 psi
Ultimate Stress of Concrete fc' = 3,500 psi
Working Stress of Steel fs = 32,400 psi
Working Stress of Concretel fc = 1,575 psi
Shearing stress vc = 65 psi
Peripheral shearing stress vp = 118 psi
Unit wt. of Concrete w= 150 pcf
Pile Diameter 18 Inch
Ec= w1.5x33Öfc' k= n/(n+r)
Ec= 3,586,616 PSI k= 0.282
Es= 29,000,000 psi j= 1- k / 3
n= Es/Ec j= 0.906
n= 8 R= 1/2 fc j k
r= fs/fc R= 201
r= 21
DESIGN :
Weigth of the footing= 10 % of column Wt.)
Weigth of the footing= 20000 Lb
Estimated Design Weigth of the footing P1= 200,000+20,000
P1 = 220000 Lb
Number of pile required = 220,000/116,000=
= 1.90 Nos.
Provided No of pile = 2 Nos.
Center to center spacing of piles S = 4 ft 200000 Lb
Distance from C/L of pile to the face of fotting= 2 ft 10 18
Width of footing B/L = 4.00+4.00 ft
B/L = 8 ft 23.00 inchs
Provided size of Footing 100000 1.583
B= 8.00 ft
L= 4.00 ft 8.00
Provided area of Footing, A= 32.00 ft2
The net upward pressure per pile
w= P/N 4.00 ft
= 200,000 / 2
w= 100,000 lb
Bending Moment at the face of M= wc -0.08
= 100,000x1.583
M= 1,900,000.00 Lb-inch Note: Shear Check Not Required
The minimum effective depth, d= ÖM/Rb
= SQRT(1,900,000/201x48.00)
d= 14.02 inch
Provided effective depth, d= 20.00 inch
Shearing StressChecking, v= V/bd Shearing stress is critical at a distance "d" from
= 100,000/48x20 the face of column
v= 104.17 psi Maximum shear,V= 100,000 lb
Sheas Check Not Ok
Punching Shearing Stress Checking for Column Punching Shear is critical at a distance "d/2"
v= V/bod from the face of column
= 100,000/136.00x20.0 Maximum shear
v= 36.76 psi V= 100000 Lb
Shear Check Ok bo= 2x(30.00+38.00)
bo= 136.00 inch
Punching Shearing Stress Checking for Pile
v= V/bod V = 100000.00
= 100,000/56.55x20.00 b= 56.55 inch
v= 88.42 psi
Shear Check Ok
Tesile Reinforcment: As=M/fsjd
As= 1,900,000/32,400x0.906x20.0
As= 3.236 inch2 10.419355
Provide # 11 bar
Spacing of reinforcement, S= (X-Sectional Area of Provided bar x 12xB) / As
S= 1.48x8.00x12/3.236
S= 43.9043 inch C/C
So provide # 11 8 inch C/C
Total Number of reinforcing bar (B*12-6)/S +1
n= (8.00x12-6)/8+1
n= 12 nos
The perimeter of # 11
= 4.32 inch
The Bond stress u= V/åojd Maximum shear,V= 100,000.00x2
u= 200,000/12x4.32x0.906x20.00 V= 200000 Lb
u= 209 psi
Name of Project:
Name of Client: Design by: Engr. Masud Ahmmed
Dagonbhuiyan,feni, Phone 01670490920
DESIGN OF PILE CAP
INPUT DATA:
Maximum column Load P= 80,000 Lb
Bearing Capacity of Pile q= 45,000 LBS/PILE
Size of Column, width 18 Inch
depth 18 Inch
Ultimate Strength of steel fy = 40000 psi
Ultimate Stress of Concrete fc' = 2,500 psi
Working Stress of Steel fs = 18,000 psi
Working Stress of Concretel fc = 1,125 psi
Shearing stress vc = 55 psi
Peripheral shearing stress vp = 100 psi
Unit wt. of Concrete w= 150 psf
Pile Diameter 18 Inch
Ec= w1.5x33Öfc' k= n/(n+r)
Ec= 3,031,244 PSI k= 0.374
Es= 29,000,000 psi j= 1- k / 3
n= Es/Ec j= 0.875
n= 10 R= 1/2 fc j k
r= fs/fc R= 184
r= 16
DESIGN :
Weigth of the footing= 10 % of column Wt.)
Weigth of the footing= 8000 Lb 80,000 lb
Estimated Design Weigth of the footing P1= 80,000+8,000 18 18
P1 = 88000 Lb
Number of pile required = 88,000/45,000=
= 1.96 Nos.
Provided No of pile = 2 Nos.
Center to center spacing of piles S = 3 ft
Distance from C/L of pile to the face of fotting= 1.25 ft
Width of footing B/L = 3.00+2.50 ft 5.5ft
B/L = 5.5 ft
Provided size of Footing 3
B= 5.50 ft
L= 3.00 ft
Provided area of Footing, A= 16.50 ft2
Length of AB=AC=BC= 3 ft 3ft
Length of CD= 2.60 ft
Length of CE= 1.73 ft
Length of DE= 0.87 ft 80,000
DESIGN OF BEAM CD 3ft
C D A
E B
Rc= 26,666.67 53,333.33 =Rd D
E
Max bending moment = 46,188.09 lb ft
Use over all depth of Beam= 15 inch
Self wt of beam= 843.75 lb/ft
Moment due to self wt.= 632.81 lb ft
Total moment= 46,820.90 lb ft C
d= 13.02
use 6 # dia bar
Area = 0.44 t= 17.14 inch
use 18 inch
d= 13.88 inch
As= 2.57 in2
No of bar required= 5.82 no
Provide 6
53,333.33 lb
DESIGN OF BEAM AB
A B
1.5
27,932.29 lb 27932.29 lb
Mid span moment = 40949.22 lb ft
d= 13.77 inch
As= 2.27 in2
No of bar required= 5.13 no
Provide = 6
Secondary Reinforcement:
Area of S.R. around Pile= 0.514 in2
Provide = 3 # bar
Area = 0.11 in2
No of bar required = 4.65 no
Provide = 5 no
ne 01670490920