0% found this document useful (0 votes)
206 views

Foundation Design by Using Afes

FOUNDATION DESIGN BY USING AFES

Uploaded by

SardimalAmir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
206 views

Foundation Design by Using Afes

FOUNDATION DESIGN BY USING AFES

Uploaded by

SardimalAmir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 31

FOUNDATION CALCULATION SHEET

One-Stop Solution for Foundation

TITLE DESCRIPTION
PROJECT/JOB NO. VCM3-EXPANSION
PROJECT/JOB NAME FOUNDATION
CLIENT NAME ASAHIMAS
SITE NAME CILEGON
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME sample1a
LOAD COMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 1

FOUNDATION LISTS
Group Name No. Description No. Description
1 F1 2 F2
3 F3 4 F4
TAPAK 5 F5 6 F6
7 F7 8 F8
9 F9 10 F10
FOOTING2 11 F11 12 F12

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 2

CONTENTS

1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
4.2 CHECK OF OVERTURNING MOMENT
4.3 CHECK OF CONTACT PRESSURE

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 3

1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code American Concrete Institute (ACI 318) [Metric]
Horizontal Force for Wind AMERICAN SOCIETY OF CIVIL ENGINEERS [ASCE 7-05]
Horizontal Force for Seismic AMERICAN SOCIETY CIVIL ENGINEERS [ASCE 7-05]
Unit System Input : MKS, Output : MKS, Calculation Unit : IMPERIAL

1.2 MATERIALS & UNIT WEIGHT


Items Value
2
Concrete (f'c : compressive strength) 300.000 kgf/cm
Lean Concrete (Lf'c : compressive strength) 0.000 kgf/cm2
Reinforcement (#3 ~ #5 , yield strength) 40000.000 kgf/cm2
Reinforcement (#6 ~ , yield strength) 40000.000 kgf/cm2
Rs (Soil unit weight) 1.300 ton/m3
Rc (Concrete unit weight) 2.400 ton/m3
Es (Steel Modulus of Elasticity) 2.200 106 kgf/cm2
Ec (Concrete Modulus of Elasticity) 2.000 107 kgf/cm2

- Soil Capacity
Items Value
Soil Name Unit-01
Footing List F1, F2, F3, F4, F5, F6, F7, F8, F9, F10, F11, F12
Qa (Soil Bearing Capacity) 5 tonf/m2
Buoyancy Not Consider
WL (Water Label from the EL = 0) 0 mm
FD (Frost Depth from the EL = 0) 0 mm
Internal Friction Angle 0
Passive Soil Pressure Not Consider
Cu (Undrained cohesion) Clay , 0 tonf/m2

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items Description
Allowable Increase of Soil (Wind) 33.33 %
Allowable Increase of Soil (Seismic) 33.33 %
Allowable Increase of Soil (Test) 20 %
Safety factor against overturning for OVM1(FO1) 1.5
Safety factor against overturning for OVM2(FO2) 1.5
Safety factor against overturning for OVM3(FO3) 1.5
Safety factor against overturning for OVM4(FO4) 1.5

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 4

Safety factor against sliding for the SL1(FS1) 1.5


Safety factor against sliding for the SL2(FS2) 1.39
Safety factor against sliding for the SL3(FS3) 1.5
Safety factor against sliding for the SL4(FS4) 1.5
Friction factor () 0.35

1.4 LOAD COMBINATION


Index Load Case Name Load Case Description
1 SW SELF WEIGHT
2 DL DEAD LOAD
3 LL LIVE LOAD
4 WL WIND LOAD

1.4.1 Group - TAPAK


Footing List = F1, F2, F3, F4, F5, F6, F7, F8, F9, F10
Comb . ID Load Combination for stability
1 1.0 SW + 1.0 DL + 1.0 LL + 1.0 WL

1.4.2 Group - FOOTING2


Footing List = F11, F12
Comb . ID Load Combination for stability
1 1.0 SW + 1.0 DL + 1.0 LL + 1.0 WL

Copyright (c) GS E&C. All Rights Reserved


9/14/2019 Page 5

2. DRAWING REFERENCE DWGS


A01 A02 A03 A04 A05 NO. DWG NO. DWG TITLE

5000 5000
5000 5000

04 6 7 8 9 10

F6 F7 F8 F9 F10 NOTES
6250

* OUTPUT UNIT : mm

03
12
F12
6500

FOUNDATION PROJECT

02
11
F11

FOUNDATION LOCATION PLAN


6250

sample1a

SQUAD CHECK
01
1 2 3 4 5
Y PROCESS PIPING VESSELS STRUCT. ELEC. INST.

F1 F2 F3 F4 F5

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWN VCM3-EXPANSION

Copyright (c) GS E&C. All Rights Reserved


9/14/2019 Page 6

2.2 DETAIL SKETCH

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


9/14/2019 Page 7

REFERENCE DWGS
NO. DWG NO. DWG TITLE
3000 CL FOOTING
1500 TOP BOTTOM

TYP.
25
2000

#11@200

#18@200
4000

NOTES
* ANCHOR BOLT
1X4-M12 ANC. BOLTS (TYPE TYPE L)

* OUTPUT UNIT : mm

#11@200
#18@200
FOUNDATION PLAN FOOTING REINF. PLAN
(10 EA)
75 PROJ.

FOUNDATION PROJECT
30 GR.

400
TOG EL. + 1000
50 20

550
25
TYP.
1500

@200

FOUNDATION DETAIL FOR


#9

400
550

#9 F1 ~ F10
500

#14

SQUAD CHECK
100

12-#14
25
400

PEDESTAL
40

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

LEAN CONC. 50 THK


CRUSHED STONE 100 THK
SECTION SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPD APPD


AS SHOWN VCM3-EXPANSION

Copyright (c) GS E&C. All Rights Reserved


9/14/2019 Page 8

2.2 DETAIL SKETCH

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


9/14/2019 Page 9

REFERENCE DWGS
NO. DWG NO. DWG TITLE

3000 CL FOOTING
1500 TOP BOTTOM

TYP.
25
1000

#11@200

#18@200
2000

NOTES
* ANCHOR BOLT
1X4-M12 ANC. BOLTS (TYPE TYPE L)
#11@200
#18@200 * OUTPUT UNIT : mm

FOUNDATION PLAN FOOTING REINF. PLAN


(2 EA)
75 PROJ.

FOUNDATION PROJECT
30 GR.

300
TOG EL. + 1000
50 20

550
25
TYP.
1500

FOUNDATION DETAIL FOR


@200
#9

300
550

F11 ~ F12
#9
500

#14

SQUAD CHECK
100

8-#14
25
300

PEDESTAL
40

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

LEAN CONC. 50 THK


CRUSHED STONE 100 THK
SECTION SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPD APPD


AS SHOWN VCM3-EXPANSION

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 10

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name F1
Ft. Type ISO
3000 Area 12.000 m2
Ft. Thickness 400.00 mm
Ft. Volume 4.800 m3
Ft. Weight 11.520 tonf
Soil Height 500.00 mm
Soil Volume 5.920 m3
400 400 Soil Weight 7.696 tonf
4000

Buoyancy Not Consider


Self Weight (except Pr.SW) 19.216 tonf

1500
500

The Origin coordinate


400

The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
F1 All Direct 4.800 m3 5.920 m3 0.576 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


S1 12.000 m2 11.520 tonf 7.696 tonf 19.792 tonf

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 11

( mm ) Ft. Name F2
Ft. Type ISO
3000 Area 12.000 m2
Ft. Thickness 400.00 mm
Ft. Volume 4.800 m3
Ft. Weight 11.520 tonf
Soil Height 500.00 mm
Soil Volume 5.920 m3
400 400 Soil Weight 7.696 tonf
4000

Buoyancy Not Consider


Self Weight (except Pr.SW) 19.216 tonf

1500
500
The Origin coordinate
400
The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
F2 All Direct 4.800 m3 5.920 m3 0.576 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


S1 12.000 m2 11.520 tonf 7.696 tonf 19.792 tonf

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 12

( mm ) Ft. Name F3
Ft. Type ISO
3000 Area 12.000 m2
Ft. Thickness 400.00 mm
Ft. Volume 4.800 m3
Ft. Weight 11.520 tonf
Soil Height 500.00 mm
Soil Volume 5.920 m3
400 400 Soil Weight 7.696 tonf
4000

Buoyancy Not Consider


Self Weight (except Pr.SW) 19.216 tonf

1500
500
The Origin coordinate
400
The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
F3 All Direct 4.800 m3 5.920 m3 0.576 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


S1 12.000 m2 11.520 tonf 7.696 tonf 19.792 tonf

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 13

( mm ) Ft. Name F4
Ft. Type ISO
3000 Area 12.000 m2
Ft. Thickness 400.00 mm
Ft. Volume 4.800 m3
Ft. Weight 11.520 tonf
Soil Height 500.00 mm
Soil Volume 5.920 m3
400 400 Soil Weight 7.696 tonf
4000

Buoyancy Not Consider


Self Weight (except Pr.SW) 19.216 tonf

1500
500
The Origin coordinate
400
The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
F4 All Direct 4.800 m3 5.920 m3 0.576 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


S1 12.000 m2 11.520 tonf 7.696 tonf 19.792 tonf

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 14

( mm ) Ft. Name F5
Ft. Type ISO
3000 Area 12.000 m2
Ft. Thickness 400.00 mm
Ft. Volume 4.800 m3
Ft. Weight 11.520 tonf
Soil Height 500.00 mm
Soil Volume 5.920 m3
400 400 Soil Weight 7.696 tonf
4000

Buoyancy Not Consider


Self Weight (except Pr.SW) 19.216 tonf

1500
500
The Origin coordinate
400
The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
F5 All Direct 4.800 m3 5.920 m3 0.576 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


S1 12.000 m2 11.520 tonf 7.696 tonf 19.792 tonf

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 15

( mm ) Ft. Name F6
Ft. Type ISO
3000 Area 12.000 m2
Ft. Thickness 400.00 mm
Ft. Volume 4.800 m3
Ft. Weight 11.520 tonf
Soil Height 500.00 mm
Soil Volume 5.920 m3
400 400 Soil Weight 7.696 tonf
4000

Buoyancy Not Consider


Self Weight (except Pr.SW) 19.216 tonf

1500
500
The Origin coordinate
400
The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
F6 All Direct 4.800 m3 5.920 m3 0.576 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


S1 12.000 m2 11.520 tonf 7.696 tonf 19.792 tonf

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 16

( mm ) Ft. Name F7
Ft. Type ISO
3000 Area 12.000 m2
Ft. Thickness 400.00 mm
Ft. Volume 4.800 m3
Ft. Weight 11.520 tonf
Soil Height 500.00 mm
Soil Volume 5.920 m3
400 400 Soil Weight 7.696 tonf
4000

Buoyancy Not Consider


Self Weight (except Pr.SW) 19.216 tonf

1500
500
The Origin coordinate
400
The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
F7 All Direct 4.800 m3 5.920 m3 0.576 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


S1 12.000 m2 11.520 tonf 7.696 tonf 19.792 tonf

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 17

( mm ) Ft. Name F8
Ft. Type ISO
3000 Area 12.000 m2
Ft. Thickness 400.00 mm
Ft. Volume 4.800 m3
Ft. Weight 11.520 tonf
Soil Height 500.00 mm
Soil Volume 5.920 m3
400 400 Soil Weight 7.696 tonf
4000

Buoyancy Not Consider


Self Weight (except Pr.SW) 19.216 tonf

1500
500
The Origin coordinate
400
The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
F8 All Direct 4.800 m3 5.920 m3 0.576 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


S1 12.000 m2 11.520 tonf 7.696 tonf 19.792 tonf

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 18

( mm ) Ft. Name F9
Ft. Type ISO
3000 Area 12.000 m2
Ft. Thickness 400.00 mm
Ft. Volume 4.800 m3
Ft. Weight 11.520 tonf
Soil Height 500.00 mm
Soil Volume 5.920 m3
400 400 Soil Weight 7.696 tonf
4000

Buoyancy Not Consider


Self Weight (except Pr.SW) 19.216 tonf

1500
500
The Origin coordinate
400
The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
F9 All Direct 4.800 m3 5.920 m3 0.576 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


S1 12.000 m2 11.520 tonf 7.696 tonf 19.792 tonf

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 19

( mm ) Ft. Name F10


Ft. Type ISO
3000 Area 12.000 m2
Ft. Thickness 400.00 mm
Ft. Volume 4.800 m3
Ft. Weight 11.520 tonf
Soil Height 500.00 mm
Soil Volume 5.920 m3
400 400 Soil Weight 7.696 tonf
4000

Buoyancy Not Consider


Self Weight (except Pr.SW) 19.216 tonf

1500
500
The Origin coordinate
400
The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
F10 All Direct 4.800 m3 5.920 m3 0.576 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


S1 12.000 m2 11.520 tonf 7.696 tonf 19.792 tonf

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 20

( mm ) Ft. Name F11


Ft. Type ISO
Area 6.000 m2
Ft. Thickness 300.00 mm
3000 Ft. Volume 1.800 m3
Ft. Weight 4.320 tonf
Soil Height 500.00 mm
Soil Volume 2.955 m3
300 300 Soil Weight 3.841 tonf
2000

Buoyancy Not Consider


Self Weight (except Pr.SW) 8.161 tonf

1500
500
The Origin coordinate
300
The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
F11 All Direct 1.800 m3 2.955 m3 0.324 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


S1 6.000 m2 4.320 tonf 3.841 tonf 8.486 tonf

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 21

( mm ) Ft. Name F12


Ft. Type ISO
Area 6.000 m2
Ft. Thickness 300.00 mm
3000 Ft. Volume 1.800 m3
Ft. Weight 4.320 tonf
Soil Height 500.00 mm
Soil Volume 2.955 m3
300 300 Soil Weight 3.841 tonf
2000

Buoyancy Not Consider


Self Weight (except Pr.SW) 8.161 tonf

1500
500
The Origin coordinate
300
The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
F12 All Direct 1.800 m3 2.955 m3 0.324 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


S1 6.000 m2 4.320 tonf 3.841 tonf 8.486 tonf

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
Unit( Length : mm , Weight : tonf , Area : m2 )
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
F1 1 Rectangle 400.000 400.000 1500.000 0.160 0.576 0.000 0.000
F2 2 Rectangle 400.000 400.000 1500.000 0.160 0.576 0.000 0.000
F3 3 Rectangle 400.000 400.000 1500.000 0.160 0.576 0.000 0.000
F4 4 Rectangle 400.000 400.000 1500.000 0.160 0.576 0.000 0.000
F5 5 Rectangle 400.000 400.000 1500.000 0.160 0.576 0.000 0.000
F6 6 Rectangle 400.000 400.000 1500.000 0.160 0.576 0.000 0.000
F7 7 Rectangle 400.000 400.000 1500.000 0.160 0.576 0.000 0.000
F8 8 Rectangle 400.000 400.000 1500.000 0.160 0.576 0.000 0.000
F9 9 Rectangle 400.000 400.000 1500.000 0.160 0.576 0.000 0.000
F10 10 Rectangle 400.000 400.000 1500.000 0.160 0.576 0.000 0.000
F11 11 Rectangle 300.000 300.000 1500.000 0.090 0.324 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 22

F12 12 Rectangle 300.000 300.000 1500.000 0.090 0.324 0.000 0.000

3.3 LOAD CASE


Fz
Fy
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are
My based on the right hand rule.
Fx
Mx

Index Load Case Name Load Case Description


1 SW SELF WEIGHT
2 DL DEAD LOAD
3 LL LIVE LOAD
4 WL WIND LOAD

Unit( tonf , tonf-m )


Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
1 0 0 -0.58 0 0
2 3.3 0 2.6 0 4.7
1
F1 3 0.5 0 0.3 0 0.2
4 0.2 0 0.8 0 0.3
Footing SW 0.000 0.000 -19.216 0.000 0.000
1 0 0 -0.58 0 0
2 3.3 0 2.6 0 4.7
2
F2 3 0.5 0 0.3 0 0.2
4 0.2 0 0.8 0 0.3
Footing SW 0.000 0.000 -19.216 0.000 0.000
1 0 0 -0.58 0 0
2 3.3 0 2.6 0 4.7
3
F3 3 0.5 0 0.3 0 0.2
4 0.2 0 0.9 0 0.3
Footing SW 0.000 0.000 -19.216 0.000 0.000
1 0 0 -0.58 0 0
2 3.3 0 2.6 0 4.7
4
F4 3 0.5 0 0.3 0 0.2
4 0.2 0 0.8 0 0.3
Footing SW 0.000 0.000 -19.216 0.000 0.000
1 0 0 -0.58 0 0
2 3.3 0 2.6 0 4.7
5
F5 3 0.5 0 0.3 0 0.2
4 -0.1 0 0.4 0 0.6
Footing SW 0.000 0.000 -19.216 0.000 0.000
1 0 0 -0.58 0 0
2 3.3 0 2.6 0 4.7
6
F6 3 0.5 0 0.3 0 0.2
4 -0.4 0 0.2 0 -1.3
Footing SW 0.000 0.000 -19.216 0.000 0.000
1 0 0 -0.58 0 0
F7 7
2 3.3 0 2.6 0 4.7

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 23

3 0.5 0 0.3 0 0.2


4 -0.6 0 0.1 0 -1.7
Footing SW 0.000 0.000 -19.216 0.000 0.000
1 0 0 -0.58 0 0
2 3.3 0 2.6 0 4.7
8
F8 3 0.5 0 0.3 0 0.2
4 -0.6 0 0.1 0 -1.7
Footing SW 0.000 0.000 -19.216 0.000 0.000
1 0 0 -0.58 0 0
2 3.3 0 2.6 0 4.7
9
F9 3 0.5 0 0.3 0 0.2
4 -0.6 0 0.2 0 -1.7
Footing SW 0.000 0.000 -19.216 0.000 0.000
1 0 0 -0.58 0 0
2 3.3 0 2.6 0 4.7
10
F10 3 0.5 0 0.3 0 0.2
4 0.2 0 0.5 0 -0.6
Footing SW 0.000 0.000 -19.216 0.000 0.000
1 0 0 -0.32 0 0
2 0 0 1.4 0 0
11
F11 3 0 0 0.7 0 0
4 0 0 0.7 0 0
Footing SW 0.000 0.000 -8.161 0.000 0.000
1 0 0 -0.32 0 0
2 0 0 1.4 0 0
12
F12 3 0 0 0.7 0 0
4 0 0 0.2 0 0
Footing SW 0.000 0.000 -8.161 0.000 0.000

3.4 LOAD COMBINATION


In Pier Top In Footing Bottom In Footing Bottom Center
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight, Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.4.1 Load Combination in Pier Top (Without SW)


Group 1 - TAPAK Unit( tonf , tonf-m )
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
F1 1 1 4.000 0.000 3.700 0.000 5.200
F2 2 1 4.000 0.000 3.700 0.000 5.200
F3 3 1 4.000 0.000 3.800 0.000 5.200

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 24

F4 4 1 4.000 0.000 3.700 0.000 5.200


F5 5 1 3.700 0.000 3.300 0.000 5.500
F6 6 1 3.400 0.000 3.100 0.000 3.600
F7 7 1 3.200 0.000 3.000 0.000 3.200
F8 8 1 3.200 0.000 3.000 0.000 3.200
F9 9 1 3.200 0.000 3.100 0.000 3.200
F10 10 1 4.000 0.000 3.400 0.000 4.300

Group 2 - FOOTING2 Unit( tonf , tonf-m )


Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
F11 11 1 0.000 0.000 2.800 0.000 0.000
F12 12 1 0.000 0.000 2.300 0.000 0.000

3.4.2 Load Combination in Footing Bottom (With Pier SW)


Group 1 - TAPAK Unit( tonf , tonf-m )
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
F1 1 1 4.000 0.000 3.124 0.000 12.800
F2 2 1 4.000 0.000 3.124 0.000 12.800
F3 3 1 4.000 0.000 3.224 0.000 12.800
F4 4 1 4.000 0.000 3.124 0.000 12.800
F5 5 1 3.700 0.000 2.724 0.000 12.530
F6 6 1 3.400 0.000 2.524 0.000 10.060
F7 7 1 3.200 0.000 2.424 0.000 9.280
F8 8 1 3.200 0.000 2.424 0.000 9.280
F9 9 1 3.200 0.000 2.524 0.000 9.280
F10 10 1 4.000 0.000 2.824 0.000 11.900

Group 2 - FOOTING2 Unit( tonf , tonf-m )


Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
F11 11 1 0.000 0.000 2.476 0.000 0.000
F12 12 1 0.000 0.000 1.976 0.000 0.000

3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
Group 1 - TAPAK
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads
F1 1 4.000 0.000 -16.092 0.000 12.800 1500.0 , 2000.0
F2 1 4.000 0.000 -16.092 0.000 12.800 1500.0 , 2000.0
F3 1 4.000 0.000 -15.992 0.000 12.800 1500.0 , 2000.0
F4 1 4.000 0.000 -16.092 0.000 12.800 1500.0 , 2000.0
F5 1 3.700 0.000 -16.492 0.000 12.530 1500.0 , 2000.0
F6 1 3.400 0.000 -16.692 0.000 10.060 1500.0 , 2000.0
F7 1 3.200 0.000 -16.792 0.000 9.280 1500.0 , 2000.0
F8 1 3.200 0.000 -16.792 0.000 9.280 1500.0 , 2000.0

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 25

F9 1 3.200 0.000 -16.692 0.000 9.280 1500.0 , 2000.0


F10 1 4.000 0.000 -16.392 0.000 11.900 1500.0 , 2000.0

Group 2 - FOOTING2
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads
F11 1 0.000 0.000 -5.686 0.000 0.000 1500.0 , 1000.0
F12 1 0.000 0.000 -6.186 0.000 0.000 1500.0 , 1000.0

Load Combination of Ultimate Condition


There is no Load Combination

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 26

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
Fz + P.F Fz + P.F
Formula : ( or ) > Fs -> OK (Uni-Axial)
Fx Fy
P.F = Passive Force (apply only in case checked passive force, mark by P )
Group 1 - TAPAK Unit ( tonf )
Ft.Name Dir. L.Comb. ( Fz + P.F) / Fx or ( Fz + H.P.F) / Fy Fs(i) Result
X 1 0.35 16.09 / 4 = 1.41 1.39 OK
F1
Y 1 Fy = 0 , Then N/A 1.39 OK
X 1 0.35 16.09 / 4 = 1.41 1.39 OK
F2
Y 1 Fy = 0 , Then N/A 1.39 OK
X 1 0.35 15.99 / 4 = 1.4 1.39 OK
F3
Y 1 Fy = 0 , Then N/A 1.39 OK
X 1 0.35 16.09 / 4 = 1.41 1.39 OK
F4
Y 1 Fy = 0 , Then N/A 1.39 OK
X 1 0.35 16.49 / 3.7 = 1.56 1.39 OK
F5
Y 1 Fy = 0 , Then N/A 1.39 OK
X 1 0.35 16.69 / 3.4 = 1.72 1.39 OK
F6
Y 1 Fy = 0 , Then N/A 1.39 OK
X 1 0.35 16.79 / 3.2 = 1.84 1.39 OK
F7
Y 1 Fy = 0 , Then N/A 1.39 OK
X 1 0.35 16.79 / 3.2 = 1.84 1.39 OK
F8
Y 1 Fy = 0 , Then N/A 1.39 OK
X 1 0.35 16.69 / 3.2 = 1.83 1.39 OK
F9
Y 1 Fy = 0 , Then N/A 1.39 OK
X 1 0.35 16.39 / 4 = 1.43 1.39 OK
F10
Y 1 Fy = 0 , Then N/A 1.39 OK

Group 2 - FOOTING2 Unit ( tonf )


Ft.Name Dir. L.Comb. ( Fz + P.F) / Fx or ( Fz + H.P.F) / Fy Fs(i) Result
X 1 Fx = 0 , Then N/A 1.39 OK
F11
Y 1 Fy = 0 , Then N/A 1.39 OK
X 1 Fx = 0 , Then N/A 1.39 OK
F12
Y 1 Fy = 0 , Then N/A 1.39 OK

4.2 CHECK OF OVERTURNING MOMENT


Formula : (Mry / Moy or Mrx / Mox) > OVM(i) -> OK
Group 1 - TAPAK Unit ( tonf-m )
Ft.Name Dir. L.Comb. Mry / Moy = OVM or Mrx / Mox = OVM OVM(i) Result
X 1 24.14 / 12.8 = 1.89 1.5 OK
F1
Y 1 Mo = 0 , Then N/A 1.5 OK

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 27

X 1 24.14 / 12.8 = 1.89 1.5 OK


F2
Y 1 Mo = 0 , Then N/A 1.5 OK
X 1 23.99 / 12.8 = 1.87 1.5 OK
F3
Y 1 Mo = 0 , Then N/A 1.5 OK
X 1 24.14 / 12.8 = 1.89 1.5 OK
F4
Y 1 Mo = 0 , Then N/A 1.5 OK
X 1 24.74 / 12.53 = 1.97 1.5 OK
F5
Y 1 Mo = 0 , Then N/A 1.5 OK
X 1 25.04 / 10.06 = 2.49 1.5 OK
F6
Y 1 Mo = 0 , Then N/A 1.5 OK
X 1 25.19 / 9.28 = 2.71 1.5 OK
F7
Y 1 Mo = 0 , Then N/A 1.5 OK
X 1 25.19 / 9.28 = 2.71 1.5 OK
F8
Y 1 Mo = 0 , Then N/A 1.5 OK
X 1 25.04 / 9.28 = 2.7 1.5 OK
F9
Y 1 Mo = 0 , Then N/A 1.5 OK
X 1 24.59 / 11.9 = 2.07 1.5 OK
F10
Y 1 Mo = 0 , Then N/A 1.5 OK

Group 2 - FOOTING2 Unit ( tonf-m )


Ft.Name Dir. L.Comb. Mry / Moy = OVM or Mrx / Mox = OVM OVM(i) Result
X 1 Mo = 0 , Then N/A 1.5 OK
F11
Y 1 Mo = 0 , Then N/A 1.5 OK
X 1 Mo = 0 , Then N/A 1.5 OK
F12
Y 1 Mo = 0 , Then N/A 1.5 OK

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 28

4.3 CHECK OF CONTACT PRESSURE


4.3.1 Contact Pressure Formula
'Handbook CONCRETE ENGINEERING' Second Edition edited by Mark Fintel

Fz My X(i) Mx Y(i)


q1,q2 = or
Af Iy Ix
if q1 or q2 < 0 , than q1 and q2 will be recalculated
by following formula
L
q(x) width(x) X dx
Px = 0 L
0
q(x) width(x) dx
P= L
0
q(x) width(x) dx

4.3.2 Input Data


2 4 4
Ft.Name Af (m ) Fl (m ) Fw (m ) Ix (m ) Iy (m )
F1 12.000 3.000 4.000 16.0000 9.0000
F2 12.000 3.000 4.000 16.0000 9.0000
F3 12.000 3.000 4.000 16.0000 9.0000
F4 12.000 3.000 4.000 16.0000 9.0000
F5 12.000 3.000 4.000 16.0000 9.0000
F6 12.000 3.000 4.000 16.0000 9.0000
F7 12.000 3.000 4.000 16.0000 9.0000
F8 12.000 3.000 4.000 16.0000 9.0000
F9 12.000 3.000 4.000 16.0000 9.0000
F10 12.000 3.000 4.000 16.0000 9.0000
F11 6.000 3.000 2.000 2.0000 4.5000
F12 6.000 3.000 2.000 2.0000 4.5000

4.3.3 Pressure Check


- Qa = Soil bearing capacity
- Uc = Uplift Allowable capacity
Group 1 - TAPAK
- X-Direction (Uni-Axial) Unit( tonf , tonf-m , tonf/m2 )
Ft.Name L.Comb. q1 q2 ci cj Qmax Qa Cont.A.R Result
F1 1 0.000 3.807 0.886 3.000 3.8 6.7(gross) 70.45 % OK
F2 1 0.000 3.807 0.886 3.000 3.8 6.7(gross) 70.45 % OK

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 29

F3 1 0.000 3.810 0.901 3.000 3.8 6.7(gross) 69.95 % OK


F4 1 0.000 3.807 0.886 3.000 3.8 6.7(gross) 70.45 % OK
F5 1 0.000 3.714 0.779 3.000 3.7 6.7(gross) 74.02 % OK
F6 1 0.000 3.100 0.308 3.000 3.1 6.7(gross) 89.73 % OK
F7 1 0.000 2.954 0.158 3.000 3.0 6.7(gross) 94.73 % OK
F8 1 0.000 2.954 0.158 3.000 3.0 6.7(gross) 94.73 % OK
F9 1 0.000 2.947 0.168 3.000 2.9 6.7(gross) 94.4 % OK
F10 1 0.000 3.530 0.678 3.000 3.5 6.7(gross) 77.4 % OK

- Y-Direction (Uni-Axial) Unit( tonf , tonf-m , tonf/m2 )


Ft.Name L.Comb. q1 q2 ci cj Qmax Qa Cont.A.R Result
F1 1 1.341 1.341 0.000 4.000 1.3 6.7(gross) 100 % OK
F2 1 1.341 1.341 0.000 4.000 1.3 6.7(gross) 100 % OK
F3 1 1.333 1.333 0.000 4.000 1.3 6.7(gross) 100 % OK
F4 1 1.341 1.341 0.000 4.000 1.3 6.7(gross) 100 % OK
F5 1 1.374 1.374 0.000 4.000 1.4 6.7(gross) 100 % OK
F6 1 1.391 1.391 0.000 4.000 1.4 6.7(gross) 100 % OK
F7 1 1.399 1.399 0.000 4.000 1.4 6.7(gross) 100 % OK
F8 1 1.399 1.399 0.000 4.000 1.4 6.7(gross) 100 % OK
F9 1 1.391 1.391 0.000 4.000 1.4 6.7(gross) 100 % OK
F10 1 1.366 1.366 0.000 4.000 1.4 6.7(gross) 100 % OK

Group 2 - FOOTING2
- X-Direction (Uni-Axial) Unit( tonf , tonf-m , tonf/m2 )
Ft.Name L.Comb. q1 q2 ci cj Qmax Qa Cont.A.R Result
F11 1 0.948 0.948 0.000 3.000 0.9 6.7(gross) 100 % OK
F12 1 1.031 1.031 0.000 3.000 1.0 6.7(gross) 100 % OK

- Y-Direction (Uni-Axial) Unit( tonf , tonf-m , tonf/m2 )


Ft.Name L.Comb. q1 q2 ci cj Qmax Qa Cont.A.R Result
F11 1 0.948 0.948 0.000 2.000 0.9 6.7(gross) 100 % OK
F12 1 1.031 1.031 0.000 2.000 1.0 6.7(gross) 100 % OK

Copyright (c) GS E&C. All Rights Reserved


9/14/2019

Project Na. : FOUNDATION


Calculation Sheet
of Project No. : VCM3-EXPANSION

Foundation Client : ASAHIMAS Page 30

5. DESIGN OF FOOTING
There is no Reinforce LoadCombination

Copyright (c) GS E&C. All Rights Reserved