Proposal for 8KW Hybrid Solar System
Client Name: Ubaid Sahab Date:
Address: Muzaffatgarh Quotation No.
Contact No: Designed By:
Sr. No. Product Description Qty
1 Solar PV Panel JA/Jinko 550/555 Grade A Tier 1 555 14
2 Solar Inverter Crown Nova 8.2kw Hybrid 1
3 14 Guage Customized Structure 14 Guage GI L2 Structure 14 G 7
4 DC Cable 6mm 3
5 AC Breaker Schneider 3
6 DC Breaker Schneider 2
7 AC SPD Schneider 1
8 DC SPD Schneider 1
9 Distribution Box PVC 1
10 Bare Conductor 10 mm 2
11 Copper Rods 2
12 Earthing Bags 4
13 Earthing Cable 1
14 Bidirectional Green Meters Transfopower
15 Net Metering
4x Daewoo Deep Cycle Battery,
16 Batteries 4x Osaka 230A
Battery Cables, Thimbles
17 Battery Cables 1 Job
18 Battery Thimbles
19 Bores 2
20 Concrete Pads 1 Job 1
21 Transportation 1 Job 1
22 Installation Fee 1 Job 1
23 MC4 Connectors 8
24 Flexible pipe Adam G 1
25 PVC Pipe Adam G 1
26 Duct Patti simple 40x40 1
27 Cable Ties 1 Job 2
28 Screw for Duct 1 inch 2
29 J Bolts
30 Rawal Bolts
31 Insulation Tapes
Grand Total
brid Solar System
07/16/2023
338
Engr. Umar Hamid
Unit Rate
Hybrid System
(Rs.)
85 660,450 660,450
360,000 360,000 360,000
6,500 45,500 45,500
20,000 60,000
4,000 12,000
4,000 8,000
100,000
5,000 5,000
5,000 5,000
10,000 10,000
12,000 24,000
600 1200
32,000
300 1200
4,000 5600
27,000 0
130,000
70,000 70000
0
68,000
0
3,000 0
500
7,000 10000
25000
15,000 15,000
20,000 20,000 20,000
15,540 50,000 50,000
500 500
2,300 2,300
1,500 1,500
5,000 5,000
350 700 29500
250 500
19000
1,274,950 1,452,450
Proposal for 8KW Hybrid Solar System
Client Name: Mr. Date: 16-Jul-23
Address Multan Quotation No. 338
Contact No: Designed By: Engr. Umar Hamid
Type: Hybrid System
Unit Rate Total Price
Sr. No. Product Description Qty (Rs.) (Rs.)
JA/Jinko 550/555 Grade A
1 Solar PV Panel 14 85 660,450
Tier 1
2 Solar Inverter Crown Nova 8.2kw Hybrid 1 360,000 360,000
3 PV Mounting Structure 14 Guage GI L2 Structure 7 6,500 45,500
DC Cables, AC Breakers,
Protection Equipment
4 DC Breakers, AC SPDs, - - 100,000
& System Accessries
DC SPDs, DB Box
Copper Rope,
5 Earthing Equipment Copper Rods, Earthing Bags, - - 32,000
Earthing Cable
NOC,
6 Net Metering Green Meters, Netmetering - - 130,000
File, File Processing
4 x 230AH Battery, Battery
7 Backup Equipment - - 0
Cables, Thimbles
Bores for Earthing,
8 Civil Work - - 25,000
Concrete Pads
All Item from Wareshouse to
9 Transportation - - 20,000
Site
Installation, Comissioning
10 Site Services - - 50,000
and Testing Services
MC4 Connectors, Flexible
Pipe, PVC Pipe, Duct Patti,
11 Miscellaneous Cable Ties, Screws, J Bolts, - - 29,500
Rawal/Anchor Bolts,
Insulation Tapes etc.
Grand Total 1,738,500
*Rs. 150,000 will be charged additonal as Cost of PV Elevated
mounting structure as per site requirement
** Quotation is valid for 3 Days
Term and Conditions
1) Inclusion of
a) Electrical work :
• Installation and connection of PV panels
• Installation of Inverter and battery system
• Connection of circuit breakers and surge protection devices
• Complete services from WAPDA input to main distribution box.
• Net metering File + File Processing + Speed Money
b) Civil work:
• A minimum 60 feet bore for AC Earthing
• A minimum 60 feet bore for DC Earthing
• To concrete structure’s base for support
2) Protection
Inclusionfeatures
of
Sr. # Features Protection
1 Input-side disconnection device Yes
2 Anti-islanding protection Yes
3 AC over-current protection Yes
4 AC short-circuit protection Yes
5 AC over-voltage protection Yes
6 DC reverse-polarity protection Yes
7 DC surge protection Yes
8 AC surge protection Yes
9 Residual current monitoring unit Yes
10 Arc fault protection Yes
11 Ripple receiver control Yes
3) Standard Exclusions:
i) Any cost or activity associated with up-gradation of customer's existing electrical service/panel or
building
ii) electrical
Any cost grounding
or activity system.
associated with covering the risk of damage, loss or theft of solar system and its
components after delivery to the customer site.
iii) Any cost or activity associated with repair of damage caused by fluctuation in grid (DISCO).
iv) Any cost or activity associated with working on any live electricity system that comes under the
purview of local DISCO or Authority.
v) Demand Notice for 3phase connection, extension of load, change of name and extension of conductor.
4) Installation Period
i) Commissioning of solar PV system will be done within 15 days after submission of 70% project cost
by the customer to the Company.
ii) 100% payment at the time of order is mandatory
iii) The acquisition of the relevant net metering approval, generation license and installation of
bi-directional/net meter can be a lengthyprocess as it involves multiple Government departments/agencies.
So it will take 30 to 40 days.
5) Warranty
i) Inverter warranty 4 years (1 year parts + 3 Years’ service)
ii) Warranty of solar panel will be 12 years performance/ 25 Year power output.
Total Cost =
Advance =
Balance =
Signature of Company’s CEO Signature of Customer
Proposal for 8KW Hybrid Solar System
Client Name: Dr. Zunaib Date: 16-Jul-23
Address Mulan Quotation No. 338
Contact No: Designed By: Engr. Umar Hamid
Type: Hybrid System
Sr. No. Product Description Qty
JA/Jinko 550/555 Grade A
1 Solar PV Panel 14
Tier 1
2 Solar Inverter Crown Nova 8.2kw Hybrid 1
4
PV Mounting Structure*
Protection Equipment
14 Guage GI L2 Structure
DC Cables, AC Breakers,
DC Breakers, AC SPDs,
7
As per System
1
& System Accessries Requirement
DC SPDs, DB Box
Copper Rope,
As per System
5 Earthing Equipment Copper Rods, Earthing Bags,
Requirement
J
Earthing Cable
NOC,
As per System
6 Net Metering Green Meters, Netmetering
Requirement
File, File Processing
O
4xOsaka/Phonix TallTubler
7 Backup Equipment 230AH, Battery Cables, Nill
Thimbles
Bores for Earthing, As per System
B
8 Civil Work
Concrete Pads Requirement
All Item from Wareshouse to As per Site
9 Transportation
Site Requirement
Installation, Comissioning As per Site
10 Site Services
and Testing Services Requirement
MC4 Connectors, Flexible
Pipe, PVC Pipe, Duct Patti,
As per Site
11 Miscellaneous Cable Ties, Screws, J Bolts,
Requirement
Rawal/Anchor Bolts,
Insulation Tapes etc.
Grand Total 1,452,450
*Rs. 110,000 will be charged additonal as Cost of PV Elevated
mounting structure as per site requirement
** Quotation is valid for 3 days
Term and Conditions
1) Inclusion of
a) Electrical work :
• Installation and connection of PV panels
• Installation of Inverter and battery system
• Connection of circuit breakers and surge protection devices
• Complete services from WAPDA input to main distribution box.
• Net metering File + File Processing + Speed Money
b) Civil work:
• A minimum 60 feet bore for AC Earthing
• A minimum 60 feet bore for DC Earthing
• To concrete structure’s base for support
2) Protection
Inclusionfeatures
of
Sr. # Features Protection
1 Input-side disconnection device Yes
2 Anti-islanding protection Yes
3 AC over-current protection Yes
4 AC short-circuit protection Yes
5 AC over-voltage protection Yes
6 DC reverse-polarity protection Yes
7 DC surge protection Yes
8 AC surge protection Yes
9 Residual current monitoring unit Yes
10 Arc fault protection Yes
11 Ripple receiver control Yes
3) Standard Exclusions:
i) Any cost or activity associated with up-gradation of customer's existing electrical service/panel or
building
ii) electrical
Any cost grounding
or activity system.
associated with covering the risk of damage, loss or theft of solar system and its
components after delivery to the customer site.
iii) Any cost or activity associated with repair of damage caused by fluctuation in grid (DISCO).
iv) Any cost or activity associated with working on any live electricity system that comes under the
purview of local DISCO or Authority.
v) Demand Notice for 3phase connection, extension of load, change of name and extension of conductor.
4) Installation Period
i) 100%
ii) advance payment
The acquisition at the time
of the relevant of order is
net metering mandatory.
approval, generation license and installation of
bi-directional/net meter can be a lengthyprocess as it involves multiple Government departments/agencies.
So it will take 30 to 40 days.
5) Warranty
i) Inverter warranty 2 years (2 Years Part + Life Time service)
ii) Warranty of solar panel will be 12 years performance/ 25 Year power output.
Total Cost =
Advance =
Balance =
Signature of Company’s CEO Signature of Customer