Comprehensive Construction Quality Checklists

This checklist is for a Boomi Pooja project. It contains 14 items to check before the event including sending invitations, banner displays, arrangements for seating, refreshments, and photos/materials for the priest. The quality assurance engineer will sign off after inspection and note any remarks.

Uploaded by

Thang Tran Viet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
836 views28 pages

Comprehensive Construction Quality Checklists

This checklist is for a Boomi Pooja project. It contains 14 items to check before the event including sending invitations, banner displays, arrangements for seating, refreshments, and photos/materials for the priest. The quality assurance engineer will sign off after inspection and note any remarks.

Uploaded by

Thang Tran Viet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

Checklist for Boomi Pooja

Project : Doc. No. : QA/CL-EXC/01


Client : Project Location :

SITE LOCATION DATE

YES NO NA

1 Check site is clean including removal of bushes, rubbish, g


2 Check invitations have been sent to all clients
3 Check form advertise ment if necessary
4 Check flexible banner installed or not
5 Check garland on flex
6 Check company banners has to be displayed
7 Check site direction boards fixed or not
Check panda arrangements are done with chairs and
8 tables
check arrangements for refreshments had been made
9 with the good caterer
10 Check site entry & Boundary outline marked with chalkpo
Check arrangement of Good bricks, Pooja photo, sceets,
11 Check
vesselsarrangements
& Pooja materials with Priest
of project photos, Album, Brochures,
Document book & Enquiry note book, ISO certificate and
12 Quality Policy etc.,
13 Check light music arrangement

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Excavation

Project : Doc. No. : QA/CL-EXC/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

1 Are there any underground utilities like sewers, water pipelines, cables?
(if YES then bring to the notice of the Project Manager & adequate precautions to be taken while
excavation)

2 Check whether the excavated pits are adequately shored/ timbered?

3 Are the excavated areas provided with fences/ barricades?

4 Are the excavated material kept from the edge of the pit/ trench by atleast
1m?

5 Are the heavy equipment such as cranes, shovels, backtoe loaders etc.
kept away atleast 6m from the edge of excavated pit?

6 Are danger signs provided near the excavated area?

7 Means of access and exit from the work area provided?

8 Check Set out

9 Check Excavation Size with Tolerance (offset)

10 Check for Loose materials / Loose soil

11 Check bottom of excavation (indicate proposed GL/Basement level with respect to


existing road level)

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Anti Termite Treatment

Project : Doc. No. : QA/CL-EXC/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

1 Check Surface Preparation

2 Check Chemicals

3 Check Application as per Manufacturer's Instructions (MSDS) & Architects Specs

4 Check Finished treatment of work

5 Check for Mix Proportion (As per Manufacturer's Instruction)Water/Kerosene

6 Check for Stages like Foundation/flooring / Joinery / External

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for PCC

Project : Doc. No. : QA/CL-EXC/


Client : Project Location :

CONTRACTOR LOCATION DATE

YES NO NA

1 Check Surface Preparation

2 Check Marking & levels to be done with respect to drawing

3 Check for Form work

4 Check for finished level

5 Check for mixing of cement, sand and aggregate & adequate material

6 Check for Pouring height

7 Do not allow extra cement mortar on top of PCC for smooth finishing

8 Check for Agrregate test report. (Fine aggregates/Cement /Water)

9 Check for Ramming with proper tools

10 Check for Button marking for PCC thickness

11 Check for curing atleast 7days

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Shuttering

Project : Doc. No. : QA/CL-SHT/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

SHUTTERING
1 Shuttering Material is New/ Old?

2 Repairs are OK?

3 Cleanliness of Shuttering?

4 Oiling of Shuttering?

FIXED SHUTTERING

5 Shuttering Design OK? (Dimension, Diagonal, Sunken portions etc.,)

6 Alignment/ Level/ Rigidity OK?

7 Check Props. Are they OK?

8 Check Acrow Span. Are they OK?

9 Check Braces. Are they OK?

10 Check sealing Joints/ Holes, OK?

11 Check for any rework or alterations

AFTER REMOVAL OF SHUTTER

11 Surface of Concrete - good moderate, level and line?

12 Repair of surface required?

(if YES then the same is to be carried out and checked by Quality Assurance Engineer)

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:

Checklist-Shuttering Feedback Venture (Pvt.) Ltd. Sheet 7 of 28


Checklist for Reinforcement

Project : Doc. No. : QA/CL-REN/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

1 Structural Drg. No. and date as per which reinforcement checked.


Bar Bending Schedule Prepared?

2 Connecting of bars to existing dowels to be checked for alignment. OK?

3 Placing of Bar diameter, number, spacing match with the Construction Schedule?

4 Lap Length, Position of lap, OK?

5 Cleanliness of shuttering and Bars OK?

6 Chairs provided?

7 Cover for reinforcement ok?

8 Provision of cover blocks/ preparation of cover blocks

9 Maintaining records and getting approval for additional reinforcement not shown

10 To check the construction joint for proper concrete bonding before placing
reinforcement
11 Laying of bars of required dia. As per requirement

12 Check for Test Reports for steel and approved brand or not

13 Check colour coding for identification

14 Check for proper binding (double strand/quality of binding wire of 18 SWG)

15 Check for any rework or alteration

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:

Checklist-Reinforement Feedback Ventures (Pvt.) Ltd. Sheet 8 of 28


Checklist for Concreting

Project : Doc. No. : QA/CL-CON/


Client : contractor :

SITE: LOCATION: DATE:

Structure: Max Aggre Size: Slump:

Cement Test Cert No: Steel Test Cert No:


YES NO NA
PRE CONCRETING
1 Check surface preparation

2 Check for Form work and stagging

3 Conduits/ Ducts opening/ Insert Plates provided?

4 Check for provision of vibrators?

5 Working condition of mixer/ vibrators checked and gaps between plates


in mixer drum to be checked?

6 Access platform and walkways (if required) provided?

7 Check reinforcement as per drawings

8 Check Embedded parts

9 Check cover to Reinforcement

10 Check Plumb

11 Check Reduced levels

12 Check for Concrete (Pour card)

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:

Checklist-Pre concreting Feedback Ventures Pvt. Ltd. Sheet 9 of 28


Checklist for Concreting

Project : Doc. No. : QA/CL-CON/


Client : contractor :

SITE: LOCATION: DATE:

YES NO NA

DURING CONCRETING
1 Proper vibration till screed appears in sides of shutters?

2 Hitting with mortar mallets on sides of shutter?

3 Slump checked/ No of cubes taken? / Mix proportion / Cleaning the surface

4 Level is checked intermittenly?

5 Maintaining temperature of concrete by ice (In case of richer mixes)

6 Sequence of pour as prepared to be followed

7 Stoppers are predetermined and placed for construction joint.

8 Water is sprinkled on concrete surface after an hr. or two as per weather


conditions

AFTER CONCRETING
1 Making arrangements for ponding or covering with hessain cloth for curing

2 Check for Identification & curing of cubes

3 Line/ Level of concrete surface O.K.?

4 Check for surface defects/ honeycombing/Alignment

5 Reason for any defects

6 Check Cement Consumption

7 Rectifications if any / Pressure grouting

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:

Checklist-Concreting Feedback Ventures Pvt Ltd. Sheet 10 of 28


Checklist for Masonry

Project : Doc. No. : QA/CL-MSN/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

1 Availability of material as per daily requirement & Test reports

2 Cleaning work area off loose material/ concrete

3 Proper stacking of bricks/ blocks

4 Quality of Bricks/ sand, Tests performed and OK?

5 Wetting of bricks

6 Door frames, if any, erected in position?

Line out rechecked? (Room dimension, diagonals, alignment with one layer of
7 brick work, Door opening position & verticality, etc.,

8 Check Mortar Preparation & provision of platform

9 Check Mortar Thickness

10 Check Plumb

11 Check finished level / Rt. Angle/ Proportion of mix

12 Check hacking/ conduit/ silt content in sand

13 Check cleaning of dead mortar

14 Check curing / raking

15 Check provision of patti

16 Check for any addition & alterations

17 Check for proper pointing, packing & finsihing

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:

Checklist-Brick work Feedback Strategic Consultancy (Pvt.) Ltd. Sheet 11 of 28


Checklist for Rubble work

Project : Doc. No. : QA/CL-MSN/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

1 Check Setting out

2 Check line and level

3 Check gaps to be filled between Rubble stone with mortar & water for settle men

4 Check bond stone are placed / Marking of bond stone

5 Preparation of Surface - Remove moss/ efflorescence & Dampen Surface

6 Check for curing

6 Check for mix mortor proportion & pointing

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Carpentry & Joinery works

Project : Doc. No. : QA/CL-MSN/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

1 Check type of wood & size as per drawing / specified

2 Check wood free of sapwood, splits, ring shakes, soft pith, seasoning

3 Check wood free of cracks over 300mm length & 6mm width

4 Check wood free fo decay & pin worm holes

5 Check wood free of pith pockets

6 Check all decayed knots, loose knots & knot holes plugged

7 Check wood treated with appropriate wood preservative / Pest control

8 Check for ply lamination and adhesive

9 Check size of openings as per drawing & specs

10 Check type & height of fixtures like Iron mongreys / as per specs

11 Check Door /Window shutter alignment

12 Check for over all size of Door/Window frames

13 Check for moisture content

14 Check the Joints of Door/Window frames

15 Check for the Hold fast as per our specification

16 Check the Door/Window frame projection from wall and opening position

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Aluminium Windows

Project : Doc. No. : QA/CL-MSN/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

10

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Plastering

Project : Doc. No. : QA/CL-MSN/


Client : Project Location :

SITE LOCATION DATE

YES NO NA
BEFORE PLASTERING

Check Drg./ Number/ Date & Revision for all other service like electrical,
1 plumbing etc.,

2 Safety access platform

3 Check for hacking/ Button marking / Mortar thickness

4 Provision of chicken mesh for conduits, column brick work joints & other

5 Preparation of Surface - Remove moss/ efflorescence & Dampen Surface

6 Material stacked - Cement, sand at various locations

7 Prewetting of surface

8 Quality of Sand - screening silt

9 Check the Beam, B/W joints packing with Nito Bond AR

10 check for Door Frame Projections


DURING PLASTERING
1 Platform for mortar mixing on tray

2 Check for thickness/ level & line & right angle

3 Proportion of mix

4 Addition of water proofing compound

5 Proper roughing of first coat

6 Check for collection of mortar spills

7 Cleaning of dead mortar

8 Check for waviness

9 Check for grooves/ drip moulds

Application of cement slurry on concrete surface/Space for tile area, cutting for
10 skirting area

11 Check for loft thickness and top surface in dead level W/Robe size

AFTER PLASTERING
1 Curing water distribution for various locations

2 Check for hollowness

3 Check for cracks

4 Check of plastering date for curing

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:

Checklist-Plastering Feedback Strategic Consultancy (Pvt.) Ltd. Sheet 15 of 28


Checklist for Water Proofing

Project : Doc. No. : QA/CL-CON/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

1 Check for clean surface

2 Check leakage after 24hrs

3 Check all embedded pipelines/Flanges for leakages

Check packing of pipes with concrete & addition of waterproofing admixture


4 (as per specification & mixing proportion)

5 Check application of water proofing chemical coating

6 Check motor mix thickness, slope & finish

7 Check curing for 7days & Curing date

8 Fill water up to finsihed floor level keep for 24hrs

9 Check again for leakages

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Grouting work

Project : Doc. No. : QA/CL-CON/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

1 Check surface Preparation

2 Check material type and specifications

3 Check for Grouting

a Check Mix Ratio of water proofing chemical

b Check surface wetting

c Check mixing of grout mortar

d Check placement timing

e check application

f Check for Voids filling

g Check for Rapid loss of moisture

h Check for curing

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Tiling (Wall dadoing)

Project : Doc. No. : QA/CL-CON/


Client : Project Location :

SITE LOCATION DATE

YES NO NA
1 Border tiles level, Motif tile location

2 Tiles near water taps are properly cut and fix

3 Check the water line points & pipe nipple projection before tiling

4 Pattern of tiles to be marked before tiling

5 Above lintel level wall plastering to be done before tiling

6 Check for any spacer between the tile joints

7 Check the wash basin counter granite laying between tiling(height)

8 Check gaps between wall tile and flooring

DURING TILING

1 Drg. No./ Date as per which pattern given / starting point

2 Line/ Level fixed, checked & Slopes are as per requirement

3 Check difference in colour shade of tiles and replace with same batch/ lot

4 Proportion of bedding mortar Mixing in A/2 tray

5 Clearing waste tiles/ mortar

6 Clearing for joints/ workmanship


7 Check the skirting for projection, right angle etc.,

AFTER TILING

1 No material stacked after fixing? (Crack or any damage)

2 Tile surface cleaned properly before starting first coat?

3 Check for any hollow sound

4 Are there any Cracked tiles, should be replaced

5 Check the pointing and grouting materials

6 Curing for four days after grouting I.e. first coat?

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Tiling (Wall dadoing/flooring)

Project : Doc. No. : QA/CL-CON/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

BEFORE TILING

1 Check for any additions & alterations


2 Cleaning slab off loose mortar/ material

3 Check for levels, Button marking, Mortar thickness

4 Availability of Material - Sand, Tiles

5 Proper Stacking of Tiles

6 Quality of Tiles/ Sand

7 Check for any platform, B/w for wardrobe area

DURING TILING
1 Drg. No./ Date as per which pattern given / starting point

2 Line/ Level fixed, checked & Slopes are as per requirement

3 Check difference in colour shade of tiles and replace with same batch/ lot

4 Proportion of bedding mortar Mixing in A/2 tray

5 Clearing waste tiles/ mortar

6 Clearing for joints/ workmanship

7 Check the skirting for projection, Right angle etc.,

AFTER TILING
1 No material stacked after fixing? (Crack or any damage)

2 Tile surface cleaned properly before starting first coat?

3 Check for any hollow sound

4 Are there any Cracked tiles, should be replaced

5 Check the pointing and grouting materials

6 Curing for four days after grouting I.e. first coat?

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:

Checklist-Tiling Feedback Strategic Consultancy (Pvt.) Ltd. Sheet 21 of 28


Checklist for Granite/Marble works

Project : Doc. No. : QA/CL-CON/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

BEFORE LAYING

1 Cleaning slab off loose mortar/ material, Button marking

2 Availability of Material - Sand, Tiles

3 Proper Stacking of Granite/Marble

4 Quality of Granite/Marble/ Sand

DURING LAYING

1 Drg. No./ Date as per which pattern given /Start point

2 Line/ Level fixed, checked & Slopes are as per requirement

3 Proportion of bedding mortar Mixing in A/2 tray

4 Check for grinding & polishing process

Clearing for joints/ workmanship / Any nosing particularly for washbasin &
5 Kitchen counter

AFTER LAYING

1 No material stacked after fixing?

2 Finished surface cleaned properly before polishing

3 Check for any hollow sound

4 Are there any Cracked, should be replaced

5 Curing for four days after Laying

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Painting works

Project : Doc. No. : QA/CL-CON/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

Painting for Walls

1 Check for any wall cracks, Curing period completed or not

1 Check the material/paints as approved make

2 Check color shade approved

3 Cleaning of walls to be checked (Scrapping), Surface finishing

4 Cracks, Dampness, any leakages to be identified and repaired.

5 Apply primary coat

6 Application of coat as per specs to be checked

7 Check others materials covered neatly with masking tape (protection of other
materials from damage like Electrical switches plate, door/window joints, glass
partitions, wardrobes)

8 Check for no of coat applied & final touch up work are completed

9 Check for overall coverage andy brush marks

10 Check for cleaning in flooring, window/door glasses & joinery


fitting after painting

11 Check for any incomplete and addition and alteration

12 Check for floor polishing before final coat ( in case of Marble flooring)
Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Doors and Windows Painting

Project : Doc. No. : QA/CL-CON/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

Painting for Doors

1 Check the Doors and window shutters are functioning properly

2 Check doors and window frame are in Plumb and fine finish

3 Cracks to be identified and to be repaired

4 Apply Primary coat

5 After primer cracks or depressions to be filled with primary putty

5 Check the paints are approved make

6 After one coat of paint check any cracks, dents

7 Check the paints are approved make

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Colour Identification

Project : Doc. No. : QA/CL-CON/


Client : Project Location :

SITE LOCATION DATE

YES NO NA
Steel Rods to be differentiatied with various Colours:

Check the steel reinforcement available in the site should be marked with the
1 following colour codes as per the diameter
a. 08mm- RED
b. 10mm - YELLOW
c 12mm - BLUE
d 16mm - WHITE
e 20mm - GREEN
f 25mm - ORANGE
g 28mm - PINK
h 32mm - GREY

Survey Drawings: A copy of the general survey drawing conducted for the
2 respectibe project should be available at the project

Approval for Construction: All drawings issued to site for construction should
be duly signed by the respective Architects/Consultants and the same to be
3 attested by the technical department "FIT FOR CONSTRUCTION".

Structural Drawings should come along with a note that the structure is
4 designed as classification for seismic Zone

Consultants Drawings to ensure that the consultant drawings are obtained


5 along with the project name, Project address and the consultants signature

6 Programme chart to be available in the respective project.

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Fabrication works

Project : Doc. No. : QA/CL-CON/


Client : Project Location :

SITE LOCATION DATE

YES NO NA
GRILLS

1 Check approved sample to be retained at site till completion of project

2 Check whether all joints are full welded and grinded to smooth finish

3 Zinc chromate primer to be used as primer instead of normal red oxide primer

4 Check before installation of overall size and weighment

5 Check vertical plumb and alignment as per drawing

Check grills to be grouted into walls for a minimum depth of 3" and should be
6 packed only with concrete [Link]

Door Clamps

1 Check standard size of door clamps is made of 1 1/4" x6mm flat (Ref dwg)

2 Only black oxidized screws to be used to fix the clamp onto frame

3 No of clamps to be fixed to frames as per drawing

Hand Rails

1 Check approved sample to be retained at site till completion of project

2 Check grouting plates to be fixed on to steps prior to commencement of staircase

3 Check for site dimension to cross verify

4 Check base plate to be grouted to a depth of minimum 3"

Check turning detail at landing should not be sharp & bends shall be bent
5 smoothly at 90 degress

6 Check for Plumb & alignment

7 Check for stability of handrail

8 Check whether all joints are full welded and grinded to smooth finish

9 Zinc chromate primer to be used as primer instead of normal red oxide primer

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Plumbing Pipe line

Project : Doc. No. : QA/CL-CON/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

Internal Concealed lines

1 Check for dia of pipe with ref drawing and specs given

3 Check provided chicken mesh

4 Check for

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By: