Lodha External Plastering-Checklist

Uploaded by

Jai Thakkar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
389 views3 pages

Lodha External Plastering-Checklist

Uploaded by

Jai Thakkar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

QC CHECK LIST FOR EXTERNAL PLASTERING

INSPECTION Request No-


Building Name : Structure:
Level: Date:
Location :

Sr.N Contractor CM QC
Perticulars Tolerances Remarks
o Observation Observation Observation
A Pre-requisite points (to be ensured by site QA / QC team)
1 Joints in brickwork and block work are raked
properly.
2 Formwork tie rod holes plugging shall be done as
per approved methodology
3 RCC / PCC coping for all sills and parapet tops
should be completed before commencement of
external plaster.

4 Honeycombing, Bug holes (if any) etc. … shall be


rectified

A Pre Plaster Checks:


1 Surface dressing, if required, done with respect to Nil
line & plumb.
2 Holes of plumbing / soil line in duct checked with Nil
line from outside.
3 Hacking of concrete surface / application of
bonding agent e.g. hack-aid plast done. Nil 4
Wetting of surfaces to be plastered 48 hours Nil
before plaster.

4 Nails, binding wire & tie rods etc. removed from


concrete surface and treated as specified. Nil

5 Water proofing work to all the offset, cornices,


chajjas completed before external plastering. Nil

6 All joints between masonry & RCC should be filled Nil


with rich mortar & treated with non shrink mortar
e.g. CNS- 50

7 Application of fibre mesh on RCC-Masonry joints


(horizantal as well as vertical) done. Nil

8 Level pad (Thiyas) taken @ 6' c/c on surface one Nil


day prior to plastering. (less than length of
aluminum patti)

9 Block masonry should be saturated thoroughly on Nil


the day prior to the application of external
plaster.
10 Double scaffolding should be used for external Nil
plastering. (Holes in masonry will not be
permitted in any case)

11 Dead walls should be treated with water proofing


Nil
chemical coat if specified.
12 Hassian cloth /plastic sheet curtain over plaster Nil
for protection against sunlight /
wind.

13 Surface efflorescence / foreign material / oil Nil


patches / green algae removed with
wire brush

14 RCC / PCC coping for all sills and paraphet top Nil
completed.
B During Plaster Checks
1 Mechanical Mixer used for mixing of mortar Nil

2 Proper consistency maintained as required with Nil


optimum use of water.
3 Use of tray for mixing of mortar and pharma for Nil
batching of sand done
4 Thickness of plaster maintained as per 10-12mm/
specification in two coats. 10-8mm

5 Third coat done, if thickness exceeds allowable Nil


limits and roughened & cured properly for 3 days.

6 3 days curing done before application of 2nd coat Nil


over 1st coat
7 Mortar utilised within intial setting time of Nil
preparation
8 Use of dry cement restricted to finishing of edges. Nil

9 Line, Level and offset distance of windows, 5mm


isolated beams and other
architectural features checked.

10 Joints of plaster kept on centre of RCC member. Nil

11 Horizantal joints of plaster treated with cement Nil


slurry /
12 Paraphet inside plaster kept continuous over Nil
paraphet top to merge with
external plaster without any joint.

13 Drip mould (panipatti) provided at required Nil


location
14 Depth and width of ornamental grooves 2mm
maintained if specified.
15 7 days curing done after 2nd coat. Nil
16 Roughening of plastered surface done where tiles Nil
are to be fixed later.
C Post Plaster Checks:
1 Curing of plastered surface done for 7 days. Nil

2 Cleaning of all surface after the day work done Nil


including removal of nails & line
dori.

3 Display of date for monitoring curing. Nil


QC BY (Contractor) QC BY (Project Execution)
QE BY (Quality Dept.)
Name : Name :
Name :
Signature: Signature:
Signature:

You might also like