PROJECT JOB NO. LOCATION SLAB TYPE PREPARED BY A.
LOADINGS Self-weight of slab total SDL Brickwall Dead Loads Live Loads Design Loads
: : : : :
NUS Business School S7131 LvL 03/04 One Way Slab WTJ
(Do u b le Slab )
= = =
2.88 3.00 0.00 5.88 5.00
KN/m2 KN/m2 KN/m2 KN/m2 KN/m2
1 denotes discontinuous # denotes continuous 1900
= 16.23
KN/m2
(Downward) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
B.
INPUT DATA fcu fy h lx c1 Ds ds = 40 N/mm2 = 460 N/mm2 = 120 mm = clearspan+ wall thkness = 1900 mm = 32 mm = 13 mm = h - c1 - Ds/2 81.5 mm
Thickness of slab Short span, Concrete cover, [Link] [Link] short span Effect. depth in short span
C.
REINFORCEMENT SHORT SPAN Hogging Moment Sagging Moment
M M k zx
= = = = = =
Design loads * (lx^2 / 8 or coeff. from Table 3.13) 16.232 * na = 0.00 KNm 16.232 * 0.451 = 7.32 KNm 0.028 0.95*ds or 0.97 * ds whichever is smaller 77 mm or 0.13% of bh (one face - tensile)
Required, Hogging Moment Sagging Moment Provide, Hogging rebar Sagging rebar LONG SPAN Min. rebar 0.13% of bh Provide,
Asx Asx
= Msx/0.95*fy*zs = 156 mm2/m = 216 mm2/m
Asx Asx
= =
201 393
mm2/m mm2/m
T T
8 10 -
250 c/c 200 c/c
Support Midspan
O.K O.K
Other types A10
Asy
= =
156 201
mm2/m Tensile face T mm2/m
8 -
250 c/c
Midspan Top & Bottom
O.K
D.
DEFLECTION Actual, Allowable,
lx/ds lx/ds
= = =
23.3 20 37.5
1.88 satisfactory
E.
SHEAR STRESS Shear stress in short span
= = 100Asx/b/ds = vcs =
vs
V / b * ds 0.19 N/mm2 0.25 vc*(fcu/30)^1/3 0.69 N/mm2
< 0.8*sqrt(fcu)
satisfactory
> vs
satisfactory
PROJECT JOB NO. LOCATION SLAB TYPE PREPARED BY A. LOADING Self-weight of slab total SDL Brickwall Dead Loads Live Loads Design Loads B. INPUT DATA
: : : : :
NUS Business School S7131 WEST CORE 140mm THICK DOUBLE SLAB AT +127.900 Two Way Slab (Double Slab) AHT 0.33 = = = 3.36 3.00 0.00 6.36 1.50 11.3 KN/m2 KN/m2 KN/m2 KN/m2 KN/m2 KN/m2 2250 fcu fy h cl lx ly Ds Dl ds dl = = = = = = = = = = 35 N/mm2 460 N/mm2 140 mm 20 mm 2250 mm 3250 mm 10 mm 10 mm h-c1-Ds/2 = 115 ds - Ds = 105 1 # denotes continuous 1 denotes discontinuous 0.43 0.43
= =
0.33 SLAB SHEAR FORCE COEFFICIENT
Thickness of slab Top & bottom cover Short span Long span Dia. of reinf. in short span Dia. of reinf. in long span [Link] in short span Effect. depth in long span C. REINFORCEMENT SHORT SPAN Hogging(-ve) Sagging(+ve)
1 msy
3250
mm mm
msx 1
Msx Msx k zx Asx Asx Asx Asx Msy Msy k zy Asy Asy Asy Asy
= = = = = = = = = = = = = = = = = =
0.000 * 0.089 * 0.011 0.95*ds OR
5.1 5.1
* *
11.3 11.3
= =
0.00 5.13
KNm KNm 109 mm
0.99 *ds whichever is smaller = or 0.13% of bh (one face)
Required Hogging(-ve) Sagging(+ve) Provide LONG SPAN Hogging(-ve) Sagging(+ve)
Msx/0.87*fy*zs 182 mm2/m 182 mm2/m 524 mm2/m 524 mm2/m 0.000 0.056 0.007 0.95*dl * * or 5.1 5.1
T T * * 11.3 11.3
10 10 = =
150 150 0.00 3.23
Support Midspan KNm KNm 100 mm
O.K O.K
0.99 *dl or
whichever is smaller = 0.13% of bh (one face)
Required Hogging(-ve) Sagging(+ve) Provide D. DEFLECTION Actual Allowable E. SHEAR STRESS SHORT SPAN 100Asx/b/ds = 0.46 LONG SPAN 100Asy/b/dl = 0.50
My/0.95*fy*zy 182 mm2/m 182 mm2/m 314 mm2/m 314 mm2/m 19.6 20
T T
10 10
250 250
Support Midspan
O.K O.K
lx/ds = lx/ds =
2.00
40.0
satisfactory
Vs vs vcs Vl vl vcl
= = = = = = = =
0.43 * 11.3 0.10 N/mm2 vc * (fcu/25)^1/3 0.76 N/mm2 0.33 * 11.3 0.08 N/mm2 vc * (fcu/30)^1/3 0.77 N/mm2
* 2.25 = < 0.8 * (fcu)^0.5 > vs * 2.25 = < 0.8 * (fcu)^0.5 > vl
11.04
KN/m
No shear reinft. required 8.47 KN/m
No shear reinft. required
PROJECT JOB NO. LOCATION SLAB TYPE PREPARED BY A.
: : : : :
NUS Busimess Sch S7131 LvL 1 Cantilevered slab AHT
LOADINGS Self-weight of slab total SDL Dead Loads Live Loads Design Loads
= = = =
3.36 3.00 6.36 1.50 11.30
KN/m2 KN/m2 KN/m2 KN/m2
1 denotes discontinuous # denotes continuous 1450
KN/m2
B.
INPUT DATA fcu fy h lx = = = = = = = = 35 N/mm2 460 N/mm2 140 mm length mm 0.5 d + 1450 mm 20 mm 10 mm h - c1 - Ds/2 115.0 mm
Thickness of slab Short span,
Concrete cover, c1 [Link] [Link] short span Ds Effect. depth in short span ds C. REINFORCEMENT SHORT SPAN Hogging Moment
M k zx
= Design loads * (lx^2 / 2 ) = 11.304 * 1.051 = 11.88 KNm (ULS) = 7.86 * 1.051 = 8.26 KNm (SLS) = 0.026 = 0.95*ds or 0.97 * ds whichever is smaller = 109 mm = Msx/0.87*fy*zs = 272 mm2/m = = = = = = = = = = = 524 524 182 524 12.6 7.0 14.0 mm2/m mm2/m or 0.13% of bh (one face - tensile)
Required, Hogging Moment Provide, Hogging rebar Bottom rebar LONG SPAN Min. rebar 0.13% of bh Provide, D. DEFLECTION Actual, Allowable,
Asx
Asx Asx
T T
10 10 -
150 c/c 150 c/c
Support Midspan
O.K O.K
Asy lx/ds lx/ds
mm2/m Tensile face T 10 mm2/m
150 c/c
Midspan
O.K
2.00 satisfactory
E.
SHEAR STRESS Shear stress in short span vs 100Asx/b/ds vcs
V / b * ds 0.14 N/mm2 0.46 vc*(fcu/30)^1/3 0.74 N/mm2 kN/mm2 kN/mm2 mm mm mm N/mm 2 mm mm mm mm
< 0.8*sqrt(fcu) > vs Modulus ratio, m =
satisfactory satisfactory
F.
CRACK WIDTH CHECK Concrete, Ec = 14 Steel, Es = 200 cmin = 25 Effective depth, d = 115 Neutral axis, x = 34.67 steel stress = 152.6 a' = 160 acr = 148 y = 80.33 e1 = 8E-04 em = 2E-04 crack width = 0.032
14.3