STEP 5: Testing

Once the SFTP access is completed, testing can start.

A test account (Sandbox environment) will be provided by your dedicated Customer Success Manager, so that the import of data can start. The Sandbox tests are important as validation before the data import can be copied to Production.

  • If the mapping is done and all formats were taken into account, the integration of the files can start and all files can be dropped in the IN directory on the SFTP server.

  • It's important the files are uploaded in the correct order. Set a delay of 5 to 10 minutes between each file so the files are sequentially processed.

  • The user file should always be uploaded first (during the testing phase it is important to upload users as inactive, to ensure no automatic activation mail will be sent).

  • The file will be normally processed within 1 hour but on peak-times this can take up to a few hours. We advise to only send files with changes or delta-data and not send bulk update files with only 1 change as this will take a while to get processed..

  • If successfully processed, the file will disappear from the IN folder. If some of the elements or the full upload file could not be processed accordingly, a LOG file will be made available in the LOG directory.
    When a file has the wrong naming OR the content (eg headers) was changed, there will be NO log folder since Rydoo server does not recognize the file.

  • The administrators of your account will have access to the settings within the Sandbox environment. This allows them to validate the data import and data changes during testing

📘

Note

The server credentials for the production account will differ from the server credentials of the test account (sandbox).