Project - controller(s) relation

The controlling flow within Rydoo serves as a second line of approval. This file is used when the controlling on projects is activated by the administrator in the advanced settings within Rydoo. This role is mostly assigned to finance departments, accounting teams, or financial controllers.

Just like with project approvers, the active status "2" can be used to overwrite any previously existing controller-project relationships with the new relationship defined in the CSV file.

Use the following structure to upload group controllers data:

Download example
(max. file size 20.000 lines)

controller;project;active
[email protected];X01;1
[email protected];Z01;0
[email protected];Z01;1
HeaderExampleTypeRequiredLength (characters)Description
controller[email protected]stringYes100Email address of the controller
projectX01stringYes100The 'project' column can be used for the project name or project id. Xpenditure will perform a double check on the name or id if existing.
active1integerYesbooleanStatus: if the controller connection between both users needs to be active or inactive