CON-2300MP Control System Manual

The CON-2300MP switching control system is designed for automatic control of power electrical switching between network supplies and a generator. It features multiple operational modes including automatic and manual operation, and includes safety regulations and installation guidelines. The system consists of three modules, each with control elements and a signaling and measurement system to ensure reliable operation and maintenance.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views29 pages

CON-2300MP Control System Manual

The CON-2300MP switching control system is designed for automatic control of power electrical switching between network supplies and a generator. It features multiple operational modes including automatic and manual operation, and includes safety regulations and installation guidelines. The system consists of three modules, each with control elements and a signaling and measurement system to ensure reliable operation and maintenance.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Electra Molins S.

A Sheet: 1 of 29

USER TECHNICAL MANUAL OF THE EQUIPMENT


SWITCHING CONTROL CON-2300MP

INDEX Page.

1. INTRODUCTION ......................................................................................................2
2. INSTALLATION AND SAFETY REGULATIONS.........................................................3
3. DESCRIPTION OF THE AUTOMATIC SYSTEM.......................................................4
3.1 Description of the control elements of the group module...........5
3.2 Description of the signaling and measurement system of the group module… 7
3.3 Description of the control elements of the network module...............9
3.4 Description of the signaling and measurement system of the network module….. 11
3.5 Description of the system alarms.....................................................13
3.6 Description of the auxiliary elements of the equipment ..................................23
3.7 Description of the special equipment elements ................................24
4. MODES OF OPERATION...........................................................................25
4.1 Out of service system..............................................................25
4.2 Switching between networks ……………………………………………………..26
4.3 Manual operation with group............................................................27
4.4 Automatic operation due to network failure with group.............................30
4.5 Automatic operation by remote signal or time control................33
5. MAINTENANCE AND FAULT LOCATION ...........................................34
5.1 Maintenance ...........................................................................................34
5.2 Fault localization .............................................................................34
6. PLANS AND SCHEMES
Situation plan of elements in the CON-2300MP equipment.
Electrical diagram of the switching panel.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Sheet: 2 of 29

1. INTRODUCTION
The CON-2300MP switching control system is comprised of three modules.
of control, is designed to automatically control a switching system
power electrical between two network supplies and a generator supply
automatic startup. It performs load transfers between networks or between the network and
group through a interlocked switching system to avoid the maneuver
simultaneous between the group and either of the two networks.

The CON-2300MP system detects the failure of the power supply from any of the
Networks or receive a commissioning order of the group (from the programmer of
operation of the optional equipment, or of a remote control system); then it gives
a start signal to the automatic switchboard of the group and controls the load transfer
group networks through signals given to the power circuit breakers of the panel
switching.

Modes of operation:

In automatic system operation, when a network fails, the service is activated.


second network and if this second network fails the group will be put into service,
restoration of either of the two networks, carry out the transfer back of the
group load to network. If the networks can be connected in parallel, the transfer between
networks can be carried out without interruption.

In manual operation, preventive maintenance can be performed by connecting.


the actual load to the installation by manually starting the group and forcing the
group network switching, this will improve the quality of preventive maintenance.
A switch can be performed without interruption between networks if the two networks are the same.
they can be connected in parallel. The connection in parallel between the networks only depends on the
characteristic of the transformers that supply them, not depending on the
characteristics of the automatic system

In automatic operation by remote control, when a signal is given by closing a


contact, start the generator and transfer the load from the grid to the group. When removing the
remote signal (contact opening) transfers the group load to redy for the group
generator.

It can be used for automatic preventive maintenance with real load.


example 30 minutes a week), with a weekly programmer not included in the team,
what generates the signal, or to make the generator set work during peak hours, etc.
This mode of operation does not disconnect the automatic mode due to a network failure. It is
say, the generator works upon receiving either of the two signals.

The CON-2300MP team is usually supplied mounted on a switch.


power manufactured by ELECTRA MOLINS, S.A. (switching panels type QC23 with
contactors, QI23 with motorized automatic circuit breakers or QS23 with circuit breakers
motorized)

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Sheet: 3 of 29

2. INSTALLATION AND SAFETY REGULATIONS


The installation of the power switching panels manufactured by ELECTRA
MOLINS S.A. will be carried out as indicated in section 7 of the installation manual.
generator set.

In cases where CON-2300MP switching control equipment is provided


to mount on power switches not manufactured by ELECTRA MOLINS, the
the customer must indicate to ELECTRA MOLINS the brand and model of the circuit breaker they want
assemble. ELECTRA MOLINS provides the appropriate electrical schematics so that the
the client can carry out the power switching assembly with the circuit breakers
chosen and the CON-2300MP team.

Before the equipment assembly, the following checks must be carried out:

• Check the nominal supply voltage of the equipment. See indication on the equipment itself.
Equipment. Standard power supply: Three-phase 400 V AC with neutral (other upon request)
Tensions). Frequency: 50/60 Hz.

• Check that the rated current of the circuit breakers is suitable for the installation.

Before energizing the equipment, perform the following checks:

• Check that the connections have been made according to the 'Electrical Diagram of
switchboard

• Check that the panel has its ground terminal connected to a grounding point.
effective.

• Check that the insulation of the electrical installation is correct according to the
Low Voltage Regulation.

• Check that the alternator neutral complies with the 'grounding' regulation.
in one of the following three systems: TT (neutral to earth and masses to earth with grounds
independents); TN (neutral to ground and masses to neutral); IT (isolated neutral and masses to
Earth). The system commonly used in Spain is the TT.

Safety precautions:

• Do not touch the electrically live parts of the panel or the cables or conductors of
interconnection with no part of the body or with any conductive object of the
electricity that is not properly insulated.

• In fires caused by the electrical system, only fire extinguishers may be used.
of class BC or ABC. Never use water or foam extinguishers if the group or
The team is under pressure.

• In case of an electrocution accident, do not touch the victim with your hands.
naked until the power supply has been disconnected. If
this last one is not possible, the separation of the injured person will have to be carried out at
through intermediate elements that are electrical insulators, or by being situated
about an electrical insulator and dragging the injured person away from the electrical contact.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Sheet: 4 of 29

3. DESCRIPTION OF THE AUTOMATIC SYSTEM


The automatic control team CON-2300MP corresponds to the latest generation of
automation. It uses microprocessor technology complemented by circuits and
SMD components, achieving maximum reliability and ease in the
operation of the equipment.

The entire automatic system consists of three modules, each of which controls the three
switching circuit breakers, the position of the elements that make up each one
the three CON-2300MP can be seen in the plan 'Dimensions and situation of elements in'
the CON-5300MP team

3.1 Description of the control elements of the group module.


The automatic control team of the group module includes the elements
of command that are detailed below. The orders transmitted to the system will be
operational if the group control module is in automatic programming and that the
group control team also in programming 'Automatic service' (see
user and maintenance technical manual of the group

S30 'Out of service' button. When this button is pressed, it locks the
operation of the entire automatic system of the CON-2300MP and it locks
all the functions performed by this module. This state is indicated with a
LED type indicator light.

S11 Automatic Service / Manual Service button. By activating this


the button the system is programmed for the manual start of the group by
middle of the corresponding button located on the same panel. When you return to
press the button the equipment changes programming and goes into service
manual to automatic, if in this position the network fails, an order will be given to
start of the generator Each of these programs remains
optically signaled with luminous LEDs. In programming
automatically, the group can start by remote signal.

S5 Manual 'Start and Stop' Button. When this button is pressed, while the
system programmed in 'Manual service', the group will be ordered to start.
Pressing the button again will result in an immediate stop. The maneuver of
The start is indicated with a light pilot.

S18 Priority Service Group Button. When this button is pressed, a


priority to group service even if a startup order is not generated.
programming of 'Priority Service Group' is indicated with a pilot light
bright. Pressing the button again cancels the priority for the service
Group and return the priority to the network service.

S51 Button for 'Lock measurements display'. The digital screen (display) can
present various pieces of information that follow one after another in a manner
cyclical. By pressing the 'Fix measurement display' button, the screen is fixed
Measurements present at that moment on the display. The measurements that it performs
the team consists of: tensions, intensities, frequencies, powers and values of
timers in seconds with a countdown to zero. Once
fixed on the electric measurements screen, these update every second.
Upon pressing the button again, the following screens will be displayed.
measurements or messages from the display or if the button is not activated, after
Intellectual property document of Electra Molins S.A. manual CON2300MP edition 1
Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Sheet: 5 of 29

In a few seconds, the measurements screen will change automatically.


The maneuver to fix measurements is indicated with a light indicator.

S6 "Reset alarms" button. Pressing this button will clear the


memorization of all alarms that are activated on the equipment. When
in the system there is one or more alarms activated, the alarm reset pilot
it causes interruptions.

SELECTORS ON THE BACK PART OF THE MODULE CON-5300MP:

S1 'Group service selector by external signal.' The selector is of two


positions 0 and 1. In position 0, the group will start when it receives a signal
exterior but it will not be put into service, and in position 1 it will be put into service.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Leaf: 6 out of 29

3.2 Description of the signaling and measurement system of the module


of the group.

The automatic control team of the group module includes the following
signaling and measurement elements:

H6 'Network available'. Indicator light that the network is available for service.
When the network is in the stabilization period, the pilot makes intermittent signals.

H7 "Available group". Pilot indicator that the group is available to


service, when the group is in the stabilization period the pilot performs
intermittencies.

H8 "Network in service". Indicator pilot that the network circuit breaker is connected.

H9 "Group in service". Indicator pilot that the group circuit breaker is


connected.

P26 Digital screen (display). The module incorporates a 32-digit display.


spread over two lines, in which the electrical measurements are displayed, the
system operating states, the countdown of the timing and
the team alarms. All the legends that appear on the screen disappear
presenting as the program develops, appearing from one
cyclic manner.

When the team is out of service, it appears on the screen:

SYSTEM OFF
FOR SERVICE

Below is the battery voltage.

BATTERY
25.4V

If the group were to start giving voltage, it would appear

TENSION GROUP
402V 403V 401V

The measurement of group tension is carried out with three digits and the measurement of
the intensities with four digits, in both cases in whole numbers. The
the maximum error of the readings in sinusoidal waves is± 1%± a digit.

The frequency measurement is carried out with four digits and a precision of 0.01.
Hz with a maximum reading error of± 1%± a digit.

The measurement of powers it is achieved in kW for three-phase systems


balanced presenting with four digits in whole numbers, with an error
maximum reading of the± 2%± a digit

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Reproduction or copying without authorization is prohibited. D0057
Electra Molins S.A Sheet: 7 of 29

The battery voltage measurement is performed with three digits and appreciation.
from 0.1 V with a maximum reading error of the± 1%± a digit. If the group is in
marching, or stopped with the electronic maintenance charger functioning, the
the voltage marked by the voltmeter will be higher than the nominal voltage of the battery. In the
Groups with 12V batteries will be between 12 and 14V. In the groups with
24V batteries will be positioned between 24 and 28V.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproducing without authorization is prohibited. D0057
Electra Molins S.A Sheet: 8 of 29

3.3 Description of the control elements of the modules


red.
In the automatic control team of the network modules, they include the
command elements that are detailed below. The orders transmitted to the system
they will be operational if the network control module is in programming 'Service
automatic" and so is the control team of the generator group (see manual
user technician and group maintenance

S30.1 'Out of service' button. When this button is pressed, it locks the
operation of the entire automatic system of the CON-2300MP and it gets blocked
all the functions performed by this module while disconnected
network circuit breaker. This state is indicated by a luminous indicator of the 'LED' type.

S11.1 "Automatic service / Manual service" button. When activating this


the button programs the system for the opening or closing of the circuit breaker
red through the corresponding button located on the same panel. Upon returning
pressing the button the equipment changes programming and goes into service
from manual to automatic, if the network fails in this position, an order will be given to the
commissioning of the second network or the start-up of the generator set if
the system was programmed for this function Each of these
programming is indicated optically with luminous indicators of the type
led

S5.1 Button for 'Manual closing and opening of the circuit breaker'. When activating this
button, with the system programmed in 'Manual service', an order will be given
for the closure or opening of the network circuit breaker. The closing maneuver is left
indicated with a light indicator.

S18.1 Button 'Network 1 in priority service over network 2'. When this is activated
the button gives priority to network service 1 over 2. When both networks
They cannot work in parallel; this programming can only be activated in one.
only of the modules, putting into service the network that has this programming.
If the networks can be connected in parallel, the priority switch can be placed on both.
network control modules will cause it to operate in parallel.
Reactivating the button cancels the priority for the service of this network
disconnecting it from the parallel operation. If the two networks do not
Can the suppression of the service priority of a network not work in parallel?
it will not cause any changes in the switching between networks. The programming of
priority is indicated with a light pilot

S51.1 Button to 'Lock measurement display'. The digital screen (display) can
present various pieces of information that follow one after another in a way
cyclical. When pressing the button "Fix measurement display", the screen of
measurements present at that moment on the display. The measurements that it performs
the team consists of: tensions, intensities, frequencies, powers, and values of
timers in seconds with a decreasing counter to zero. Once
the electrical measurements screen is fixed, and these are updated every second.
When the button is pressed again, it will proceed to the following screens of
measurements or messages from the display or if the button is not activated, after a period of time
In a few seconds, the measurement screen will change automatically.
The measurement fixing maneuver is indicated by a light indicator.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Reproduction or copying without authorization is prohibited. D0057
Electra Molins S.A Sheet: 9 of 29

S6.1 "Reset alarms" button. Pressing this button will clear the
memorization of all alarms that are activated on the equipment. When
in the system there is one or more alarms activated, the alarm reset pilot
it causes intermissions.

The network control module 2 has the same control elements as the other one.
the network 1 changing exclusively the subscripts.

SELECTORS ON THE BACK PART OF THE MODULE CON-5300MP:

S1 'Group service selector by external signal'. The selector is of two


positions 0 and 1. In position 0, the group will start when it receives a signal
exterior but it will not be put into service, and in position 1 it will be put into service.

S2 "Switching selector with cut off." The selector has two positions 0 and 1.
At position 0, all the switching will be done without interruption between networks and
Position 1 will be carried out with a cut.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Leaf: 10 out of 29

3.4 Description of the signaling and measurement system of the module


of red
The automatic control team of the group module incorporates the following
signaling and measuring elements:

H6.1 "Network available". Indicator pilot that the network is available for service,
When the network is in the stabilization period, the pilot makes intermittent signals.
If the available network is the one that controls the other module, it will carry out
constantly interruptions.

H7.1 "Available group". Indicator pilot that the group is available for
service, when the group is in the stabilization period the pilot performs
intermittencies.

H8.1 "Network in service." Indicator pilot that the network circuit breaker is connected.
If the network that is in service is the one that controls the other module, it will carry out
constant intermissions.

H9.1 "Group in service". Pilot indicator that the group circuit breaker is
connected.

P26.1 Digital screen (display). The module includes a 32-digit display.


spread over two lines, where the electrical measurements are displayed, the
system operating states, the countdown of the timings and
the team's alarms. All the legends that appear on the screen disappear.
presenting as the program develops, appearing from one
cyclic manner.

When the equipment is out of service, the screen displays:

SYSTEM OUT
OF SERVICE

Below is the battery voltage.

BATTERY
25.4V

If the network were providing voltage, it would appear

TENSION RED 1
402V 403V 401V

The measurement of group tension is carried out with three digits and the measurement of
the intensities with four digits, in both cases in whole numbers. The
the maximum error of the readings in sinusoidal waves is± 1%± a digit.

The frequency measurement is done with four digits and an appreciation of 0.01.
Hz with a maximum reading error of± 1%± a digit.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Sheet: 11 of 29

The measurement of powers It is done in kW for three-phase systems


balanced presenting with four digits in integers, with an error
maximum reading of the± 2%± a digit

The battery voltage measurement is carried out with three digits and appreciation.
from 0.1 V with a maximum reading error of the± 1%± a digit. If the group is in
running, or stopped with the maintenance electronic charger functioning, the
the voltage indicated by the voltmeter will be higher than the nominal voltage of the battery. In the
groups with 12V batteries will be between 12 and 14V. In the groups with
24V batteries will be between 24 and 28V.

The network control module 2 has the same signaling elements as


the one from network 1 changing exclusively the subscripts.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Sheet: 12 of 29

3.5 Description of the system alarms.

The CON-5300MP team includes the necessary alarms to achieve the maximum
safety and reliability of operation.

The alarms of the CON-5300MP equipment are divided into four groups according to their action:

a) Preventive alarms
b) Switch system alarms
c) Parallel operation alarms
d) Communication alarms

When any alarm appears, the display will show the alarm that has occurred and the
The LED of the S6 button for 'Reset alarms' will flash until the issue is resolved.
the problem and reset the alarm with the 'Reset alarms' button.

When a stop alarm is triggered while the equipment is in 'Automatic Service', it changes
the programming to 'Manual Service'. Once the anomaly is resolved, it must be reassembled.
the alarm and, if applicable, return to 'Automatic Service' with the S11 button of 'Service'
automatic / Manual service.

The complete list of alarms can be displayed on the screen while the equipment is on.
programmed in automatic or manual service, activating for 3 seconds the
S6 button for 'Reset alarms'.

a) PREVENTIVE ALARMS. They are the alarms that are only indicated:

Low and high battery voltage. This alarm is activated when voltage is detected.
the battery that powers the equipment is below or above normal values
predefined. It will appear on the screen:

ALARM
BATTERY VOLTAGE

Blocked group. If the programming of the service is changed in the generator set
automatic by maneuver or by alarm, the display screen will show:

GROUP SERVICE
NO AUTOMATIC

These alarms are repeated in the three control modules.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without permission is prohibited. D0057
Electra Molins S.A Sheet: 13 of 29

b) SWITCHING SYSTEM ALARMS.

The CON-5300MP team controls the maneuvering of the power circuit breakers located in
the switching panel allowing load transfer maneuvers to be carried out without
cut it with a cut.

In order to ensure the proper functioning of this system, 4 are incorporated.


possible alarms related to each of the network circuit breakers and 4 possible
alarms related to the group circuit breaker.

The 4 alarms that each of the two modules controls related to the
the network circuit breakers are as follows:

Failure of the connection of network circuit breaker 1.


Failure in the disconnection of network circuit breaker 1.
Network circuit breaker intensity relays 1.
Unexpected disconnection of network circuit breaker 1.

These same alarms are repeated for network 2.

The 4 alarms that the module controls related to the group circuit breaker are
next:

Group circuit breaker connection failure.


Failure in the disconnection of the group circuit breaker.
Current relays of the group circuit breaker.
Unscheduled disconnection of the circuit breaker.

The following alarms are described in detail:

Alarms in the network circuit breaker module 1/2:

Network circuit breaker connection failure. When the closing order is given
network circuit breaker, if it is not connected, the following message will appear on the display:

ALARM CONNECTION
RED DISCONNECTOR

If the network circuit breaker does not connect during the switching operation, it will be blocked.
maneuver and the group circuit breaker will be reconnected.

Press the S6 button 'Reset alarms'. The system will attempt to switch.
from group to network. If the switching is not performed, the "Failure of" alarm will reappear.
the network circuit breaker connection" and the group will remain in service.

Failure in the network circuit breaker disconnection. When the opening command is given
network circuit breaker, if this opening is not carried out within the preset time, on the display
the following alarm will appear:

DISCONNECT ALARM.
RED DISCONNECTOR

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Sheet: 14 out of 29

When this alarm occurs, the system will not allow the group circuit breaker to connect.
the system will be blocked.

To reassemble the alarm, proceed as follows:

Press the S6 button 'Reset alarms'. The system will attempt to disconnect again.
the network circuit breaker. If it does not disconnect, this alarm will appear again.

Network circuit breaker current relays. When the network circuit breaker carries
incorporated intensity relays with signaling contact, if a
overcurrent, which causes its disconnection, will appear on the display the
alarm
ALARM INTENSITY.
RED BREAKER

Since this alarm is triggered upon detecting an overcurrent, the equipment does not provide
starting order for the generator group to prevent overcurrent from occurring
also about the group itself. The switching is therefore blocked and the system
out of service with the group stopped. The S30 LED of 'Out of service' will perform
intermittencies.

The rearming of this alarm and the commissioning of the network will be carried out as follows.
manner

Activate the "Reset alarms" button S6, which will also turn on the "Out of service" LED.
S30 will stop blinking and will stay on.
To reconnect the network circuit breaker, activate the S11 "Automatic service" button.
/ Manual service" changing to "Automatic service".

Unexpected disconnection of the network circuit breaker. This alarm is activated if it is


the network circuit breaker is connected, it disconnects for an unknown reason. The action of
this alarm is triggered by the signaling contacts of the status (closed/open)
Circuit breaker is different depending on whether the network breaker includes or does not include a contact.
additional external signaling for firing due to the action of intensity relays
network circuit breaker characteristics:

If the network circuit breaker has a contact for trip signaling by relays
of intensity (in addition to the signaling contacts of the closed/open state); it
it will be considered that the unexpected disconnection of the circuit breaker was due to a cause
different from an overintensity. In this case, when this alarm is detected, the equipment will give
Start order for the generator set to put it into service and maintain it.
the power supply. It will appear on the screen:

ALARM SHOT
RED DISCONNECTOR

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Leaf 15 of 29

In this case, the rearming of the alarm and the commissioning of the network will be carried out from
the following way:

Press the S6 button 'Reset alarms'. The equipment will give the orders to
disconnect the group circuit breaker and to connect the network circuit breaker. If the
the network circuit breaker does not connect, the group breaker will reconnect, and
this alarm will appear again.

If the network circuit breaker does not have a relay tripping signal contact
of intensity and only has contacts for the signaling of the status
(closed/open), the disconnection of the circuit breaker will be considered to have been due to the
triggering of said relays for which the same treatment is applied as for the alarm
from 'Network circuit breaker current relays'. The equipment does not give a start command to the
generator set to prevent overcurrent from occurring also on the
group. The switching is therefore blocked and the system is out of service with the
group stopped. The S30 LED of "Out of service" will flash. It will appear in
the screen

ALARM INTENSITY.
RED DISCONNECTOR

In this case, the rearming of the alarm and the commissioning of the network will be carried out from
the following way:

Activate the "Reset alarms" button S6, which will also activate the "Out of" LED.
The 'S30 service' will stop flashing and will remain on.
To reconnect the network circuit breaker, press the S11 'Service' button
automatic / Manual service" switching the programming to "Service
automatic.

Alarms in the group circuit breaker module:

Failure of the group circuit breaker connection. When the closing order is given for the
group circuit breaker, if it is not connected, the following message will appear on the display:

ALARM CONNECTION
GROUP BREAKER

If the group circuit breaker does not connect during the switching maneuver with the network, it
it will block the group circuit breaker maneuver and will automatically reconnect the
network circuit breaker, keeping the network in service, the programming of 'Group in service'
"priority" will be blocked.

To reset the alarm, the following steps will be taken:

Press the S6 button 'Reset alarms'. The equipment will attempt to carry out the
network switching to group. If the switching still does not occur, it will return to
the alarm 'Group circuit breaker connection failure' and the network appear
will remain in service.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A. Sheet: 16 out of 29

Failure in the group circuit breaker disconnection. When the opening command is given.
of the circuit breaker, if this opening is not performed within the established time,
the following alarm will appear:

DISCONNECTED ALARM.
GROUP DISCONNECTOR

When this alarm is detected, the system will not allow the network circuit breaker to connect.
blocking the switching, leaving the group in service.

To reassemble the alarm, the following procedure will be followed:

Press the S6 button 'Reset alarms'. The equipment will try again.
disconnect the group circuit breaker. If it does not disconnect, it will return to
this alarm appears.

Intensity relays of the group circuit breaker. When the group circuit breaker has
incorporated intensity relays with signaling contact, if a occurs
overcurrent, which causes its disconnection, will appear on the display the
alarm:

ALARM INTENSITY.
GROUP BREAKER

Since this alarm is triggered by detecting an overcurrent, the equipment does not
It will give the order to put the network into service to prevent overcurrent from occurring.
also about the network. The switching is therefore blocked and the system out of
service with the group stopped, until the problem is resolved and the alarm is rearmed. The
The S30 LED of 'Out of service' will flash intermittently.

The rearming of this alarm and the commissioning of the group will be carried out as follows
way

Activate the 'Reset alarms' button S6, which will also turn on the 'Out of'
service" S30 will stop blinking and will remain on.
-To restart the group and connect the group circuit breaker, activate the
button S11 "Automatic service / Manual service" entering programming
Automatic service.

Unexpected disconnection of the group circuit breaker. This alarm is triggered if while
the group circuit breaker is connected, it disconnects for an unknown reason. The action of
this alarm is triggered by the signaling contacts of the state (closed/open)
circuit breaker and it is different depending on whether the group circuit breaker includes or does not include a contact
additional exterior signaling for firing by the operation of the intensity relays
characteristics of the group circuit breaker:

If the group circuit breaker has a contact for signaling tripping for
intensity relays (in addition to the signaling contacts of the state
closed/open); it will be considered that the unforeseen disconnection of the circuit breaker has been
for a reason other than an overintensity. It will appear on the screen:
Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1
Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Sheet: 17 out of 29

ALARM SHOT
GROUP BREAKER

The system will act differently depending on the state of the network at the time of
to produce the anomaly:

If the anomaly has occurred while there is network voltage, it will be given
immediate order to connect to the network circuit breaker.
If the anomaly has occurred without network voltage, upon returning to the
the same, it will be put into service with a minimum stabilization time.

In this case, the rearming of the alarm and the commissioning of the group will be carried out.
in the following way:

Press the S6 button 'Reset alarms'. If at that moment the network is not
In service, the team will give the connection order to the group circuit breaker. If the network
it is in service, the button S18 "Group in service" must be activated
"priority" to bring the group back into service. If the group circuit breaker
If it disconnects again, this alarm will reappear.

If the group circuit breaker does not have an independent signaling contact
circuit breaker trip by current relays and only has contacts for the
status signaling (closed/open), the disconnection of the circuit breaker will be considered
which has been due to the triggering of said relays for which the same is carried out
treatment for the alarm of 'Group circuit breaker intensity relays'. The
the team will not issue the order to put the network into service to prevent that
overvoltage also occurs on the network. The switching remains therefore
blocked and the system out of service with the group stopped, until it is resolved
problem and the alarm will reset. The S30 LED of "Out of service" will perform
intermittencies. It will appear on the screen:

ALARM INTENSITY.
GROUP DISCONNECTOR

The rearming of this alarm and the commissioning of the group will be carried out from the
next way:

Activate the "Reset alarms" button S6, which also turns on the "Out of
service" S30 will stop flashing and will remain on.
To restart the group and connect the group circuit breaker, activate the
Button S11 "Automatic Service / Manual Service" switching to programming
"Automatic service".

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without permission is prohibited. D0057
Electra Molins S.A Sheet: 18 out of 29

c) PARALLEL OPERATION ALARMS BETWEEN NETWORKS:

The alarm related to the parallel operation between the networks can work.
in parallel:

Timing failure.
When synchronization occurs between the networks, if it is not carried out on time
5 minutes, the display screen will show:

RED ALARM
SYNCHRONISM

The indication of this anomaly only appears in the module corresponding to the circuit breaker.
that has to be synchronized with use.

By resetting this alarm using the S6 button 'Reset alarms', it will be repeated again.
the 'automatic synchronization cycle'. In case the alarm repeats, it must be sought
cause of the anomaly. Provisionally, and until the cause of the 'failure' is found
"synchronization", the S2 switch located at the back of the CON modules will be passed.
2300MP that control the breakers of the networks, to the position "1".
In this way, the team is programmed to perform the switchovers with cut.

c) COMMUNICATION ALARMS:

The three modules that control the circuit breakers are interconnected with an RS bus.
485, if this interconnection is interrupted, the alarm will appear on the display screen:

ALARM
COMMUNICATION

This alarm only blocks the module that doesn't respond to its communication but I don't know.
they interrupt the other modules.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Sheet: 19 of 29

3.6 Description of the auxiliary elements of the equipment.


Communications with the outside.

The CON-2300MP device has two contacts with a common terminal without voltage that
they allow to signal at a distance the firing of the alarms of the equipment. One of the contacts
signals the preventive alarms, the other the alarms in the switching system.

Through an external contact connected to the equipment, the group can be started or
put it into service according to the programming carried out on the device itself.

Optionally, a module can be installed for the communication of the equipment with a
PC computer, through an RS 485 serial communication. Allows for control
remote completion of the switching team. To know the details of
operation and programming, see the manual 'Protocol Description of
communication from the team CON-2300MP

Operating programmer.

Optionally, the CON-2300MP equipment can include a timer.


to signal the start of the generator on the scheduled days and hours. To
Carry out the programming, see the programmer's own functional manual.
the operating programmer is connected to the contact for starting and stopping
distance described in 'communications with the outside', this programmer will be located in the
switch cabinet.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Sheet: 20 out of 29

3.7 Description of the special elements of the equipment.

Section normally without content except for equipment built under project
special.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Leaf: 21 of 29

4. MODES OF OPERATION.

4.1 System out of service.


When putting the CON-2300MP equipment into service (upon receiving power supply, the three
modules), these are connected in the initial programming which is in 'Out of service'. It
all the lights turn on and after a few moments they turn off again
only the H1.0 pilot light is on 'Out of service'. The following appear on the screen
rotating messages indicating the system status and battery voltage readings:

SYSTEM OFF
OF SERVICE

BATTERY
25.4V

The CON-2300MP equipment allows two operating modes, in 'Manual' and in


Automatic

Although the switching control team is in the 'System out of' position.
service, it is possible that the group is underway, either because it has been set in motion
manual from the group itself, or because it has received a start order from another
switching (in case there is more than one switching).

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Sheet: 22 of 29

4.2 Switching between networks.


In the CON-2300MP equipment, the networks can operate under two different systems, which are
they can be put in parallel or cannot be put in parallel, this particularity will come
determined by the technical characteristics of these networks that will determine them
company supplying the electricity supply.

In the event that the two networks cannot be connected in parallel, the selection of the network
service priority can be selected to be automatic or manual, in the
automatic selection, the network that is in service is always the priority and in the system
manual, it is the user who selects it.

In the event that the two networks can be connected in parallel, two can be presented.
work systems, which have redundant networks for the service (a single network
can provide service for the use), or that have been essential for the service, (the two
networks must work in parallel inevitably due to the power of
utilization
In the first case, the group will start when both networks fail and in the
second, when a single network fails.

Manual programming

When the system is in manual programming, and the networks are available the LEDs
H6 will be lit, activating the buttons for 'Manual close and open of'
circuit breaker" closing the respective circuit breaker If you want to switch to the other circuit breaker of the
Another network with a cut, the buttons S18.1 of 'Network 1' will be activated respectively.
priority service over network 2" or the equivalent of network 2 and then the button
S5.1 or S5.2 of "Manual closing and opening of circuit breaker" which will open the
circuit breaker that was connected and the new circuit breaker will close.
When the two networks cannot work in parallel, by program they will not be able to.
connect the buttons of 'Network 1 in priority service over network 2' at the same time or the
equivalent of the network 2.

If the two networks can work in parallel, to carry out the maneuver of having both
if the circuit breakers are connected, the previous process will be repeated but with the difference of
Both buttons S18.1 of 'Network 1 in priority service' must be activated.
about network 2" and the equivalent of network 2.
If the maneuver to be performed was a hot-switching operation, once the two circuit breakers are
The parallel service priority button that is to be disconnected will be deactivated.

Automatic Programming

In the automatic programming of the CON-2300MP modules, the commissioning of the


the networks will be carried out automatically based on the voltage of these and in case of
the availability of both is the same, the one that will be put into service will depend on the
that has been scheduled as a priority.

If the two networks have to work in parallel in automatic mode, in both networks
The network button will be programmed in priority service.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Sheet: 23 out of 29

4.3 Manual operation with group.


This mode of operation allows the operator to perform it whenever they wish,
the commissioning of the group by transferring the load from the grid to the group and
vice versa.

Acting on the button S11 of each module "Automatic service / Manual service"
the programming will be changed from "Out of service" to "Manual service", appearing
the pilot light of 'Manual Service' is illuminated. If the network voltage is correct, it
It will intermittently illuminate the H6 pilot light available on all modules.
After the first stabilization time has elapsed, the H6 pilot light will remain on.
Then acting on the button 'Manual closing and opening of the circuit breaker' of
module that controls the network circuit breaker, the equipment will give the order to close the circuit breaker
red for its commissioning, the H8 indicator lights up. At the moment of connecting the
red, a screen will appear with the network voltage readings in each phase.

TENSION RED
402V 403V 401V

This screen alternates with the battery voltage readings screen.

If the maneuver described above is repeated in the other circuit breaker control module
of the network, this second network will not connect unless it has previously not been
the button that gives priority of service to this second network has been activated, upon being activated the
the closing button of this second network would disconnect the first to connect the second
second

If these networks can work in parallel, for their commissioning


the priority buttons of each network must be activated, and when activated the
Closing button of this second network, the synchronization of the same will be detected and if
this is correct an order to close it will be given. If the verification parameters
The synchronization settings are not correct, they cannot be modified automatically.
when it syncs between networks.
The parameters that are checked are the same as those used when synchronizing the
generator set with the networks, these parameters are described later.

In the group circuit breaker control module, when it is in 'Service'


manual" and pressing S5 of "Manual start and stop of the group" generates the order of
start of the group that is transmitted to the automatic control panel of the group. This
The group panel must be set to 'Automatic Service' and then it will start.
the group will signal available group for service to the CON-2300MP. Another possibility
to have started the group from its control panel manually and to activate the button
of 'Priority Service Group' in the group table so that it signals the group
available for service on the CON-2300MP. To carry out these maneuvers see the manual
generator group technician.

Once the group is started and available (the H7 status pilot of the group lights up in the
If the network is operational, the group will remain functioning and available.
If the network is down, the group will be put into service immediately
the H9 group pilot light is turning on in service.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Unauthorized copying or reproduction is prohibited. D0057
Electra Molins S.A Sheet: 24 out of 29

To put the generator in service even though the networks are in service, it
S18 will pulse 'Group in priority service'. The service priority of the generator group.
it will be signaled with a luminous indicator.

In this position, the load will be disconnected from the network and connected to the group.
a cut in the supply is occurring.

By pressing S18 "Group in priority service" again, the priority service will be canceled.
of the group and the group's load will be switched.

The manual shutdown of the generator set will be carried out by pressing S5 'Start and manual stop'.
removing the march signal that had been given to the control panel of the group, if this one
It was scheduled in 'Automatic Service' the group will start the shutdown cycle.

Note: All timing settings of the CON-2300MP equipment are adjustable by the service.
ELECTRA MOLINS, S.A. technician to the values desired by the customer within a range
valid through the programming console.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Leaf: 25 out of 29

4.4 Automatic operation due to network failure with group.


In this operating mode, the CON-2300MP device performs a three-phase detection.
from 'network failure' due to minimum voltage, maximum voltage, phase imbalance or
repetitive microcuts. A 'network failure' is considered to occur when a cut happens.
on the network; and also when the mains voltage goes out of the±15% of the tension
nominal, or when there is an imbalance between phases greater than±10%

To program the equipment for automatic operation in case of network failure, you must
press the button S11 "Automatic service/Manual service" switching to "Service
automatic" in the three modules, signaling the maneuver by the lighting of
the corresponding pilots.

When a 'network failure' occurs, the CON-2300MP equipment will perform a brief
timing, usually 1 second to give the order to be put into service
the other network, to avoid giving a "start order" in a first cut of shorter duration
to a second. With this type of operation, the group will not start until
that both networks crash.

If the normal operating system of the equipment requires both networks to work
permanently in parallel, the group's start will occur when a single one fails.
of the networks

After this confirmation timing of the 'network failure' has elapsed in any of the
Two systems, the CON-2300MP equipment sends the signal to the automatic panel of the group for the
start of this. Once the CON-2300MP group module receives the group signal
available, coming from the group's automatic panel, the H7 group indicator lights up
available for service, then the team will give the order for the closure and startup
group circuit breaker service appearing illuminated then the group H9 pilot light
service.

The generator set will remain in service for as long as the "network failure" lasts.
Upon returning, the network stabilization timing begins. This timing
its purpose is to avoid frequent switching in unstable networks. The
timing on the screen with indication of the countdown to zero:

AVAILABLE NETWORK
EN 300 SEG.

During this stabilization time, the H6 pilot will perform intermissions. Once finished
the network stabilization the H6 pilot light will remain on indicating that the network is
available for immediate service.

From this moment, the load will be switched to the network, and once
Once completed, the team CON-2300MP will suppress the start signal to the panel.
automatic of the group to produce its stoppage.

Control of voltage cuts shorter than 1 second. The equipment incorporates a control of
number of cuts in the supply during a period of time. The number of cuts and the
time is programmable. When exceeding the number of cuts to the programmed value, it
the start of the group will be carried out.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Sheet: 26 out of 29

When the group is available, the first cut that occurs will be carried out.
network switching to group. If the network stabilization time has passed and it has not
no new cuts have been made, the service will return to the network.

If after the group is available no new cut occurs, after


network stabilization time will stop the group.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Leaf: 27 out of 29

Automatic group service and manual stop.

This mode of operation is performed by placing the selector S11 in the position of
"Automatic service" and keeping the S5 button "Group in priority service" activated.
the group's module.

When the network fails, the group automatically enters service. But when it returns the
red, when the button S5 "Group in priority service" is activated, the action is not performed
automatic group to network switching. This switching will be done manually
when the button S5 is deactivated.

This mode of operation is useful when you want the group to network switching.
it should be done at an opportune moment.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition 1


Copying or reproduction without authorization is prohibited. D0057
Electra Molins S.A Sheet: 28 of 29

4.5 Automatic operation by remote signal or time control.


The CON-2300MP team allows for the startup of the generator upon receiving a
external signal (when closing a contact remotely) after a timing period has elapsed
default. The screen will appear:

REMOTE START
GROUP

Once the group has been started by the external signal, the team will put the group into service or
no, according to the position of the selector S1 located at the back of the CON module.
2300MP that controls the group circuit breaker.
With the S1 selector in position 0, the group will start but will not be put into service.

With selector S1 in position 1, the group will be put into service. Performing the
network switching to group.

The external start signal can be provided with an external timer to the equipment.
CON-2300MP and which can be optionally mounted on the switching frame.
It allows starting the group on the days and hours set in the programmer by carrying out
the transfer of load without network interruption to group and from group to network.

The generator will remain in operation for as long as it is maintained.


the external signal (can be the time set in the operating programmer).
At the end of this time, the load transfer will be carried out without a group cut to the network in
the form indicated in section 4.1 of "Manual operation" when deactivating the
Functioning of 'Group in priority service'. Once the load has been transferred to the network, it
it will automatically disconnect the group circuit breaker and then the equipment CON-
2300 removes the start signal from the automatic control panel of the group to produce the stop of the
same.

Automatic operation with time control can be used to carry out


periodically the preventive maintenance running with load of the generator set
or to schedule the group supply to the load during peak hours.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Unauthorized copying or reproduction is prohibited. D0057
Electra Molins S.A Leaf: 29 out of 29

5. MAINTENANCE AND FAULT LOCATING


5.1 Maintenance.

For the maintenance of the electrical equipment, it will only be necessary once or twice a...
year, a test of all the automations is carried out through its system
automatic, and a review is carried out and if necessary a retightening of all its
embeddings, both of maneuver and power, as well as a cleaning of the
same with dry compressed air or with a vacuum cleaner.

It is recommended to create an incident log for the annotation of the


interventions that are carried out on the equipment, indicating the date of them, the
reviews carried out or the work done, the anomalies found, the elements
replaced and the name of the technician who carried out the review.

5.2 Fault localization.

DEFECT SYMPTOM PERFORMANCE


When the network marches, the No appears the 1. Visually check if the group has started.
group does not put tension on the group. 2. Check if the equipment has given the order of
march. start.
3. Check the circuit breakers of the group that
they feed the team.
4. Check that the group has given the signal of
available group.
The signal appears. [Link] the operating circuit breaker of the circuit breaker.
of group of the group.
available and the 2. Check that the circuit breaker receives the
failure alarm of the closing order of the equipment.
group circuit breaker 3. Check the operation of the circuit breaker.
group.
Upon returning, the network does not appear. 1. Check the network detection circuit breaker.
self effectuates the net is
switching. available.
It appears the 1. Check that the button is not activated.
network indication group in priority service.
available and the 2. Check the maneuvering circuit breaker of the circuit breaker
failure alarm of the of network.
network circuit breaker [Link] that the network circuit breaker receives the
equipment shutdown order.
4. Check the operation of the circuit breaker
red.

Intellectual property document of Electra Molins S.A. manuals\ CON2300MP edition1


Copying or reproduction without authorization is prohibited. D0057

You might also like