5000
Return Wall of A1 Abutment (300mm)
500
Inside
Outside
Slope 30mm pe
10600
8600
3
e 1:
Slop
tre r me
3500
4200
2200
Sectional Elevation (Left Bank - Downstream Side)
2200
3500
500
SLOPE
(1:36)
NOTES:
5000
1. Backfill: The backfill layer immediately behind the wall should
consist of hand packed stone or some granular material as shown
in the drawing. Remainder of the backfill should be rammed in
150 mm thick layers sloping towards the back of the wall. As per
IRC 48.
2. The concrete of the retaining wall shall be M15.
3. The retaining wall shall be in accordance to IRC-78 as per the
specifications of the contract.
4. The retaining wall shall be done Parallelly alongwith the backfill of
Abutment A1.
D
t a
A
r a
O
S t
R
Rock y
Design, Engineering. Supply. Fabrication. Transportation. Erection,
PROJECT load testing and painting etc. complete in all respect of Double Lane
Steel Truss Bridge Class 70R/Class AA/Class A/Class Special Vehicle
(SV) including abutments with deck level at EL +680m and span of
113 m across river Satluj D/s of proposed Dam Site Khaira for Sunni
Dam HEP (382 MW) Distt. Shimla/Mandi (HP).
CLIENT SJVN- SUNNI HEP
CONTR. P&R P & R INFRAPROJECTS LIMITED,
GROUP CHANDIGARH.
PROPOSAL FOR RETAINING WALL FOR
TITLE
ABUTMENT A1
DRAWN HARMAN DATE 04.11.2024 SCALE : NTS
CHKD. APPD.
[Link]. PRIL/SJVN/A1/001 REV-0