0% found this document useful (0 votes)
66 views1 page

Foundation and Reinforcement Details

Uploaded by

mosetilameck75
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views1 page

Foundation and Reinforcement Details

Uploaded by

mosetilameck75
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

NOTES.

29T10-10-150-c/c T1

31T10-32-150c/c T2

15T10-01-150c/c B2
28T10-12-150c/c T1

16T10-14-150c/c T1

31T10-22-150c/c T1

28T10-16-150c/c T1

31T10-24-200c/c T2

31T10-24-200c/c B1

4T10-26-200c/c T2

4T10-28-200c/c T2

79T10-18-150c/c T1

6T10-30-200c/c T2
30T10-08-200c/c B1

15T10-04-150c/c B2

65T10-20-150c/c T1
1200 2500 1200 2600 1200 1950 1200 1850 1200
400 400 3300 400 3400 400 2750 400 2650 400 400 [Link] depth to be determined on site.
[Link] dimensions are in millimeters unless stated otherwise.

200 500
200 200
[Link] figured dimension to be read as they appear NOT scaled off.

200
200 3600 3600 2750 400 2650 400

1200

1200
[Link] alteration should be made whatsoever without written
200

1 authority from the project consultant.


48T10-02-150c/c T1
[Link] structural timber to be well seasoned before use.

2000

2000
1000

1000
1200 400 1200 900 1200 900 1200 500 1200 900 1200 2900 1200 [Link] to foundation footings, columns, beams and suspended slab
2000

8T10-13-150c/c T2 0800 1200 400 1700 400 1700 400 1300 400 1700 400 3700 400 400
to be class 20 ([Link]).
48T10-02-150c/c B1
[Link] to strip foundation, ground floor slab and blinding to pad
400 1100 400 1700 400 1700 400 1300 400 1700 400 3700 400

200

200
1200

1200
footing to be class 15 ([Link]).

200
200

2 8. This drawing to be read hand in hand with relevant architectral


68T10-25-150c/c T1
drawings.
9. Reinforcement overlaps shall be 50 times the sizes of reinforcemrnts
5T10-09-150c/c T2
10. Reinforcement covers to be 25mm to slab and columns, 40mm to
6T10-11-150c/c T2
beams and column bases.

3000

4000

4000

3000
9T10-15-150c/c T2
4000

4000
9T10-17-150c/c T2 LEGEND
200
TT -Top Top reinforcement bars
1200 400 1200 1600 1200 1200 2600 1200 2900 1200
6T10-21-150c/c T2 400 400 1200 400 2400 400 1000 400 3400 400 3700 400 400 TB - Top B ottom reinforcement bars
89T10-03-150c/c B1
BB - Bottom Bottom reinforcement bars.
400 1100 400 2400 400 1000 400 3400 400 3700 400 BT - Bottom Top reinforcement bars

200

200
1200

1200
68T10-23-150c/c T1

200
DPM - Dump Proof Membrane.
200

200
1200
1200

1100
200
200
46T10-23-150c/c T1
4
REVISIONS

100
900
900

200

1100
200

4000

5000
5
5000

ADDITIONS;

3600

2600
26T10-07-200c/c B2

3600
6T10-21-150c/c T2

200
1200
200

26T10-05-200c/c B2 6

200

1200
200

2200
7

100
1100
26T10-05-200c/c T1
1100

200
200

1200
3700
4400

200

OMMISSIONS;

2000
2000

2400

1900
200

200

200
200
600

400 1300 400 2400 400 4600 400 3800 800

A B C D E F G H I
1200 500 1200 1600 1200 3800 1200 3000 1200

Reinforcement Details for Slab.


PROJECT:
Foundation Layout Plan PROPOSED DEVELOPMENT AT EAST KITUTU/MWAMANG'ERA/4333
KEROKA TOWNSHIP LOCATION, BOCHARIA SUB-LOCATION IN
200
200
750
3700
2500 1220
3800
2560 1240
3150
1910 1120
3050
2550 200 100 4200
100
50
NYAMIRA COUNTY.
600 2500 600 620 2560 620 620 2530 3050 50 750 2800 750
3T16 2T16 3T16 2T16 3T16 2T16 3T16 2T16 2T16 3T16

T8 @200 c/c T8 @200 c/c T8 @200 c/c T8 @200 c/c T8 @200 c/c
CLIENT:
3T16 2T16 3T16 2T16 3T16 2T16 3T16 3T16 3T16
BEAM A1 ~ I1 BEAM C1 ~ C2

200
200 1600 2100 2100 1700 2100 4100 100
50
450
450
3T16
1000
1000
2T16
700
300 400
3T16 2T16
1300
1300
800
400 400
3T16 2T16
1300
1300
700
400 300
3T16 2T16
1100
1100
700
300 400
3T16 2T16
1300
1300 400
1100
700
3T16 2T16
2700
2700
2T16
850
850
3T16
50
100
50 750
3T16 2T16
4200
2800
2T16
750
3T16
50
Drawn by;
T8 @200 c/c T8 @200 c/c T8 @200 c/c

3T16 2T16
BEAM A2 ~ I2
3T16 2T16 3T16 2T16 3T16 2T16 3T16 2T16 3T16 2T16 2T16 3T16 3T16 BEAM F1 ~ F2 3T16 3T16
FREDRICK KAMAU
CSE/011/21
200
200 1600 2800 1400 3800 4100 2200 4200
50 450 1000 800 1800 800 800 920 2560 1320 2700 850 50 50 450 1400 1100 2800 750 50
450 1000 300 500 1800 500 300 800 300 620 2560 620 700 2700 850 450 1400 400 700 2800 750
3T16 2T16 3T16 2T16 3T16 2T16 3T16 2T16 3T16 2T16 2T16 3T16 3T16 2T16 3T16 2T16 2T16 3T16

T8 @200 c/c T8 @200 c/c T8 @200 c/c T8 @200 c/c T8 @200 c/c T8 @200 c/c T8 @200 c/c

2T16
BEAM A3 ~ I3
3T16 3T16 3T16 2T16
BEAM A1 ~ A3 3T16 3T16
Designed by;
Kenneth A. Swara (B. Eng. Hons. (civil and structural engineering)- Moi University
Dip. Building - Mombasa Polytechnic, Reg. Graduate Engineer
1050
5200
3400 1600
4000
2600 850 50 750
4200
2800 1000
1400
800 600
1100
500 920
3800
2560 920
1300
700 350 50
Graduate Member IEK)
50 1050 3400 900 700 2600 850 50700 2800 700 300 800 300 300 2T16
500 300 620 2560 620 300 700 300

T8 @200 c/c
3T16 2T16 3T16 3T16 2T16 3T16 2T16 3T16 3T16 2T16 3T16 2T16 3T16
University of Eldoret,
T8 @200 c/c T8 @200 c/c T8 @200 c/c
3T20 3T16 3T16
Department of Civil & Structural Engineering,
3T16 3T16 3T16 3T16 2T16 3T16 3T16 3T16 2T16 3T16 2T16 3T16
BEAM B4 ~ I4 BEAM I2 ~ I7
[Link] 1125 -30100,
Eldoret.
200 200 1400 3800 2400
100 Email: swaraken@[Link]
200 4000 200 4000 50
100 300 800 920 2560 1020 1600 450
850
3T16 2T16
2600
2T16
850
3T16
50 850
3T16 2T16
2600
2T16
850
3T16
50 350
3T16 2T16
800 300
3T16
620 2T16
2560 6203T16 400 1600
2T16
450
3T16 Tel. +254733844399/ +254725962709
T8 @200 c/c T8 @200 c/c T8 @200 c/c

3T16 3T20 2T16


3T16 3T16 3T16 2T16 3T16 2T16
BEAM D3 ~ D8 3T16 2T16 3T16
2T16 BEAM H5 ~ I5

DRAWING TITLE:
REINFORCEMENT DETAILS FOR SLAB, BEAMS AND FOUNDATION LAYOUT.

4200 1400 1100 3800 1300 5200 4000


750
50700
3T16 2T16
2800
2800 3T16
1000
700 300 2T16
800
800
600
300
3T16
300
500
500 300
2T16
920
620
3T16 2T16
2560
2560
920
620
3T16
300
700
700
2T16
35050
300
3T16
1050
50 1050
3T16 2T16
3400
3400 900
1600
700
3T16 2T16
2600
2600
850
850
3T16
50
SCALE: DATE: Owner's signature:
T8 @200 c/c T8 @200 c/c T8 @200 c/c T8 @200 c/c

3T16
BEAM H2~H8
2T16 3T16 3T16 3T16 2T16 3T16 2T16 3T16 3T16 3T20
BEAM D8 ~ 18
3T16 3T16 3T16 3T16
1:25 JUNE 2023

You might also like