0% found this document useful (0 votes)
490 views48 pages

Glass Partition Type

Uploaded by

masungcadmarvin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
490 views48 pages

Glass Partition Type

Uploaded by

masungcadmarvin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION XIII CARAGA
AGUSAN DEL SUR 2ND DISTRICT ENGINEER OFFICE
BRGY. KARAOS, SAN FRANCISCO, AGUSAN DEL SUR

C.Y. 2024 PROJECT PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR

CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING


(AGUSAN DEL SUR 2nd DEO BUILDING) BARANGAY KARAOS, SAN
FRANCISCO AGUSAN DEL SUR

LOCATION: BRGY KARAOS, SAN FRANCISCO, ADS

SUBMITTED : RECOMMENDED : APPROVED :

ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA


ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER

DATE: DATE: DATE:


REPUBLIC OF THE PHILIPPINES
TABLE OF CONTENTS
PROVINCE OF AGUSAN DEL SUR
ARCHITECTURAL OFFICE OF THE
BUILDING OFFICIALS
A1 - TABLE OF CONTENTS, PERSPECTIVE
A2 - SITE DEVELOPMENT PLAN, VICINITY MAP
A3- GROUND FLOOR PLAN, SECOND FLOOR PLAN APPROVED BY:
A4 - THIRD FLOOR PLAN, ROOF DECK
A5 - FRONT ELEVATION, LEFT-SIDE ELEVATION,
SCHEDULE OF WINDOWS BUILDING OFFICIALS DATE

A6 - RIGTH-SIDE ELEVATION, REAR ELEVATION,


SCHEDULE OF DOORS AND WINDOWS
A7 - SECTION THRU "A", SECTION THRU "B"
A8 - PERSPECTIVE OF CEILING DETAIL, ROOF PLAN
A9 - GROUND FLOOR CEILING PLAN, SECOND FLOOR
CEILING PLAN
A10 - THIRD FLOOR CEILING PLAN,
ROOF DECK CEILING PLAN
LAND USE & ZONING
STRUCTURAL
S1 - GENERAL NOTES
S2 - CONT. OF GENERAL NOTES
S3 - CONT. OF GENERAL NOTES
S4 - CONT. OF GENERAL NOTES
S5 - FOUNDATION PLAN, SECOND FLOOR
FRAMING LAYOUT PLAN
S6 - THIRD FLOOR FRAMING LAYOUT PLAN, LINE & GRADE
ROOF DECK FRAMING LAYOUT PLAN
S7 - MACHINE ROOM FRAMING [Link] FRAMING PLAN
S8- SCHEDULE OF FOOTING, SLAB SCHEDULE
S9 - SCHEDULE OF COLUMN, FOOTING DETAIL,
TIE BEAM DETAIL
S-10 - SCHEDULE OF BEAM AND GIRDER,
FOOTING WITH MICRO PILE DETAIL
S11 - SCHEDULE OF BEAM AND GIRDER,
TYPICAL DETAIL OF R.C COLUMN, TYPICAL BEAM ARCHITECTURAL
ELEVATION SECTION DETAIL
S12 - STAIR DETAILS
S13 - FIRE EXIT STAIR DETAIL
S14 - FIRE EXIT BLOW UP, ISOMETRIC DETAIL
S15 - ELEVATOR SECTION DETAIL

PLUMBING
P1 -SPECIFICATION, PLUMBING LEGENDS, STRUCTURAL
SEPTIC TANK PLAN
P2 - GROUND FLOOR SANITARY LAYOUT PLAN,
SECOND FLOOR SANITARY LAYOUT PLAN
P3 - THIRD FLOOR SANITARY LAYOUT PLAN,
GROUND FLOOR WATER LAYOUT PLAN
P4 - SECOND FLOOR WATER LAYOUT PLAN,
THIRD FLOOR WATER LAYOUT PLAN
P5 - GROUND FLOOR SANITARY ISOMETRIC PLAN
SECOND FLOOR SANITARY ISOMETRIC PLAN SANITARY
P6 - THIRD FLOOR SANITARY ISOMETRIC PLAN
GROUND FLOOR WATER LINE ISOMETRIC PLAN
P7 - SECOND FLOOR WATER LINE ISOMETRIC PLAN,
THIRD FLOOR WATER LINE ISOMETRIC PLAN

ELECTRICAL
E1 - SINGLE LINE DIAGRAM
E2 - DESIGN ANALYSIS ELECTRICAL
E3 - SCHEDULE AND COMPUTATION OF LOADS,
RISER DIAGRAM, SPECIFICATION,
ELECTRICAL SYMBOLS
E4 - SCHEDULE AND COMPUTATION OF LOADS FOR MDP AND
DISTRIBUTION PANEL NO. 1, NO. 2 AND NO. 3
A5 - GROUND FLOOR LIGHTING LAYOUT PLAN,
SECOND FLOOR LIGHTING LAYOUT PLAN
A6 -THIRD FLOOR LIGHTING LAYOUT PLAN,
MECHANICAL
ROOF DECK LIGHTING LAYOUT PLAN
A7 - GROUND FLOOR CONVENIENCE OUTLET PLAN,
SECOND FLOOR CONVENIENCE OUTLET PLAN
A8 - THIRD FLOOR CONVENIENCE OUTLET PLAN,
ROOF DECK CONVENIENCE OUTLET PLAN
A9 - STAIRWAY LIGHTING LAYOUT PLAN
A10 - GROUND FLOOR AIR CONDITIONING LAYOUT PLAN,
SECOND FLOOR AIR CONDITIONING LAYOUT PLAN
A11 - THIRD FLOOR AIR CONDITIONING LAYOUT PLAN FIRE SAFETY
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
FRONT ELEVATION CHARMINE B. OCITE
LEFT SIDE ELEVATION ENGINEERING ASSISTANT
CARAGA REGION CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE SCHEDULE OF WINDOWS
PREPARED:
BUILDING (DEO BUILDING) PHASE 2
LEONE FE A. LUCENIO A 1
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
ELMO M. ALONDE
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ENGINEER II/ACTING CHIEF,
PLANNING AND DESIGN SECTION
OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 13 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ARCHITECT II DATE: DATE: DATE:
N

N
48.02

30
.3
DPWH 2
WAREHOUSE BUILDING
PROPERTY LINE

THIS SITE
VERDU FILI
New Tiniwisan
TAGLATAWAN
MAYGATASAN
HAMOGAWAY
TAG-ANAHAO
POBLACION
STA. TERESITA OSMEÑA
CAGBAS

SAN ISIDRO BOCAC


LANGAG SAGUMA
CUBO LA PURISIMA
MAASIN NEW GINGOOG SALVACION

Bantayan

KINAMAYBAY BAKINGKING
ESPERANZA BENTAHON
MAHAGKOT

GAMAO PANAYTAY
BALOBO REMEDIOS BATOHON SAN JOSE SAN LORENZO
AGSABU CHARITO SAN ISIDRO
CROSSING LUNA
HAWILIAN MABUHAY
STA IRINE
Little Bohol
Agsabo TAGABASE
PIGLAWIGAN STA MARIA
Malinawon DACUTAN New Davao SAN MARTIN
LIBERTAD
LA PERIAN
MARCELINA SAN SALVADOR SALIMBUGAON
NATO CATMONON
Kisay
Demar
MAUG AZPETIA
MILAGROS KATIPUNAN
SAN TORIBIO AWA
LOS ARCOS
CONCORDIA
Bulo
CIBULAN
STA. FE SAN JOAQUIN
AGUINALDO MAGSAYSAY
BUNAGUET Maligaya LABAO

CALABOAN
SALUG
TAHINA
OROMICA
DUANGAN
ODIONG
ANOLINGAN
PROSPERIDAD
POBLACION

Pusilao
ANISLAGAN
SAN JOSE MAPAGA

GUIBUNON MAC ARTHUR AURORA


Halosan Omot

EXTENSION OF OFFICE BUILDING


WIGGUAM
LA SUERTE
GUADALUPE SALVACION
VALENTINA
Mahayonyon
LA UNION
LAS NAVAS
SINACUNGAN
Durian
SEGUNDA MAHAPAG
LUCENA Hubanganan
DAS - AGAN
LUCAC
TANDANG SORA SANTIAGO SAN ROQUE Batinga
DON PEDRO SAN PEDRO

CECELIA
NAPO PATIN-AY BITAN - AGAN
TAGBALILI MALIWANAG
DIMASALANG SAN VICENTE
SAN VICENTE
PISAAN
LA CARIDAD Supon
SAN ISIDRO
MARITULA Estrella
Locahon HUBANG Mabuhay
STA. INES
Sta. Cruz Moreca
Cocton
Tuburan SAN RAFAEL TAGAPUA BARANGAY I

EXTENSION OF NUEVO TRABAJO

DOÑA MAXIMA
Burgos

Cebuena
BARANGAY III

STA. ANA
BARANGAY II
BARANGAY IV

BARANGAY V
ALEGRIA

CULI
STA. RITA
SAN FRANCISCO
MATL'S. LAB. BLDG. MAHAGSAY
BALIT
DOÑA FLAVIA

CULIRAM
San Miguel DEL MONTE

Mabini RIZAL
Baliwag
BORBON
Podlosan
Mahawan
LADGADAN
KARAOS

SAN ISIDRO
POBLACION
POLICARPO Taglikid

SAN LUIS ZAMORA

Consuelo
BATUCAN
Villa Hermosa Buhion Upper Baliwag

SAN NICOLAS NEW VISAYAS


SAN ISIDRO ORMACA
SAN AGUSTIN
SAN PEDRO BAYUGAN II
BAYLO CAUSWAGAN
EBRO
LABNIG
DON ALEJANDRO
LAPINIGAN

PROPOSED DE'S ZILLOVIA


TALACOGON
BUENA GRACIA
BUENA SUERTE
Alang-Alang

PASTA
MATI

MALIGAYA
Pamintigan
COALICION Patindog

QUARTER/
CAIMPUGAN Kinamasan
Kuliba-an
New Leyte Ignacio Kaagsaman
Batas
MABTAY

CONFERENCE RM.
MARBON LIBUAC
Cabugan

MATL'S. LAB. POBLACION Latay


LA FLORA CABANTAO

MAHAYAHAY
Buhisan ROSARIO Nyholm Guban

BUILDING
TAGBAYAGAN

DESAMPARADOS
Kisanga
MAHARLIKA Manlawigan
Tomowahong

STA. CRUZ
Valentina NOVELE CABAWAN
Catigbawan
Palibo
Padigusan

EXISTING OFFICE BINICALAN


SABANG GIBONG

Kiago
Lahi

WASIAN

THIS SITE
Binitayan SABANG ADGAWAN
Leo
Larona Mong Soan

MAIN BUILDING Manguicao


LYDIA
Balitoc Katipayan Masabong
82.61

Asunsion
Libon

COMOTA
Gesok
OSMEÑA LA PAZ BAYUGAN III
Sinog-ang

Agpangon

Kagulo-an
Kiandag
Magbuya

ANGELES SAN PATRICIO Emelda Village


Nanaugan Curva Tagapo
VILLA PAZ

HALAPITAN
LANGASIAN SAGUNTO

Puntod Cabacungan COO

PANAGANGAN
Taytay Masapia

Panlabuhan

EXISTING BATAAN
Maitom
SAN MARCOS
Agnaya Singanan
Away

FOUNTAIN Motto

69.06
LABORATORY Valentina
VALENTINA

Guitas
Immaculada
MAGAUD
Batohon
Jandayugong
Tawilon KATIPUNAN Bong
MAMBALILI
Liboton

SAN ANDRES
Binahanan
VIOLANTA

BUILDING FOUNTAIN BUNAWAN


LORETO
Kasapa II
WALOE
SAN TEODORO
STO. TOMAS

TRANSFORMER
Maputi
New Visayas

San Lorenzo Manawe Iloan


BUNAWAN BROOK
Pamanggutan Mantood
Mahayahay
Mambaos
Malihug
Balaan Kagay-ao Guitas

Mabuhay Palaygon Simolao


Pilang KASAPA II HUBANG
Haon
Boboya-on

SAN VICENTE NUEVA ERA


Pan-ajatan Moh
NUEVA GRACIA Triumph
Luna
Babadan
Pundasion
Minambao Bayog
Acero IMELDA
Camp 8 LIBERTAD

NARRA TREE Pahion


Liberty
Linatawan
Elmugtan
Ramos Village
Balite Bagong Silang
Linatawan Tibanog Camp 3 Nueva Era
STA. TERESA New Visayas
SAN GABRIEL MANAT
Gawa gawa
JOHNSON DON MATEO
Mactan Sinapawan
Sanacoge Barobo
Maica
Logum Cabinuangan
Taglubog Kinayong
Cabusas BACAY II
Aurora

POWER Guinobatan KAPATUNGAN

MASAYAN TUDELA
Pudlasan BASA
Maasin
PAG - ASA
Mansungad Candavao Magading SAN ISIDRO
Pagatpatan CAIGANGAN

HOUSE Teon
Sta. Cruz SAN MARIANO SAN ISIDRO

Natividad
Lapu-Lapu

La Suerte
MAGSAYSAY
Dungga

Kawayan
San Roque
Gasa
Bian
Maymayan

Ilang - Ilang
Basag LA FORTUNA
Luzvimin
BINONGAN
Mahabu
Leo
Upper Lucad
TRENTO CEBOLEN
Tadasi
SAN ROQUE

PARKING
Limbasan Antonio TAPAZ Calman Bato Isdaon
D. O. CUEVAS
San Miguel SAWAGAN
La Tondena STA. MARIA
SAMPAGUITA
STO. NIÑO
Mampao Miguel

BASKET BALL COURT


Mandanaw Sua Kauswagan SALVACION
BINUCAYAN AURORA
Daga-an Baubo
Panghan Tinangasan STA. ISABEL PULANGLUPA
Boom
Badas Maitom SAN IGNACIO

VERUELA
El Papa SAN JOSE
SABOD

PROPOSED Maguimon
Cab - Cab

Alpha Base
Yamaticon
KAUSWAGAN
Sto. Niño

Bagong Silang
El Mondo

Tambo Lower
Tagbuyawan Lower

Tagbuyawan
Tagbulete
Sta. Teresa

Onoman
Kandingan

NEW VISAYAS
PANGYAN
Rajah Kabungsuan

Tugpan

BUILDING
STA. CRUZ DEL MONTE SAYON
POBLACION
KATIPUNAN Cabunog

GAD
CONCEPCION

EXISTING Mabuhay

Nasangaban
Babuyan
SINOBONG Manipis
AWAO
ANGAS

Durian
PATROCENIO

Baclisi Divisoria

MOTOR POOL BUILDING Ferdinand


Bugdangan

Mabaha
Condoyon ANITAP

Catalan
Guivara Mambuco
LIMOT
Kiduay

STA. EMELIA
Agsaway
Dao
Mabuhay
LANGKILAAN

Naga Maba (Upper) Cebole Maitom


Hinagtungan

SISIMON CANDIIS Vergara


STA. JOSEFA Mabuhay

MANGO TREE
GUARD'S
HOUSE
PWD
PARKING PARKING
PARKING
MOTOR PARKNG

PARKING
ENTRANCE

VICINITY MAP
PANAFLEX SIGNAGES

NOT DRAWN TO SCALE


DPWH SIGNAGE

80.79

H I G H W A Y
N A T I O N A L

1 SITE DEVELOPMENT PLAN


A-2 SCALE 1:400 METERS

DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
SITE DEVELOPMENT PLAN CHARMINE B. OCITE
VICINITY MAP ENGINEERING ASSISTANT
CARAGA REGION
BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING)
PREPARED:
BARANGAY KARAOS, SAN FRANCISCO, LEONE FE A. LUCENIO A 2
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE AGUSAN DEL SUR ENGINEER II/ASST. CHIEF, ENGINEER II/ACTING CHIEF, OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
2 13 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS
ELMO M. ALONDE PLANNING AND DESIGN SECTION PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE:
A B C D E F
21.40

4.00 3.50 3.50 3.50 3.50 3.40

EXISTING MOTOR POOL


BLDG.
A B C D E F
18.00
up
2.10

2.10
4.00 3.50 3.50 3.50 3.50

W-1 B W-1 W-1


1 B
1

CONFERENCE ARCHIVE ROOM

5.40
ROOM

6.50

6.50
6.70

E X I S T I N G P P C P (0.23M THK.) KITCHEN FOLDING/MOVEABLE WALL PARTITIONS

6.90
PW PW
3 4

2.00 D-2 D-2


GRANITE FLOOR TILES
1.50
(600MM X 600MM) PW FIRE EXIT PW D-2

1.50
D-4 PW
12.90

W-7 D-5

12.90
5 5 6

2 1
2

1.20
1.00

JANITOR'S 2
D-4

1.20
RM. 3
1.20

PW

2.05
PWD 7
D-3 TOILET
2.20

2.20
ELEV. D-1 ELEV.

4.50
SURVEY
D-2 OFFICE SURVEY

6.40
2' EQUIPMENT
2'

6.00
ROOM D-1 OFFICE SPACE
101112131415161718 LOBBY PW PW 10 1112131415161718
1 2
W-3
PW
A W-1

3.00
3.20

8 WAITING
9
AREA
1.28

W-9 1.20

1.70
UP H A L L W A Y W-9 UP 1.20

8 7 6 5 4 3 2 1 3 2 1
9 8 7 6 5 4 3 2 1
0.30

0.30
3
0.15

W-8 B
W-8 W-1 W-1

1.20
W-9 B SURVEY W-1
RACEWAY W-9 RACEWAY
OFFICE
PROVIDE: 14MM MARINE PLYWOOD BOX TYPE SIDEWALL
STAIR SIDEWALL BLOCK (UP TO WINDOW BOTTOM LEVEL) 4.00 3.50 3.50 3.50 3.50
4.00 3.50 3.50 3.50 3.50
75MM X 44MM X 1.5MM STAINLESS PEBBLES #5 TOP FLOOR FINISHED 18.00
STEEL TUBULAR HANDRAIL
W/ 38MM X 25MM X 1.5MM STAINLESS PROVIDE: 14MM MARINE PLYWOOD BOX TYPE SIDEWALL
STEEL TUBULAR RAILINGS STAIR SIDEWALL BLOCK (UP TO WINDOW BOTTOM LEVEL)

2 SECOND FLOOR PLAN


1 GROUND FLOOR PLAN A-3 SCALE 1:100 METERS
A-3 SCALE 1:100 METERS

SCHEDULE OF COLOR FINISHES SCHEDULE OF WALL FINISHES


MARK DESCRIPTION MARK DESCRIPTION
EAVES OF CEILING BEIGE WALL ACCENT WALL
INTERIOR WALL BEIGE ACCENT WALL DECO STONE
INSIDE CEILING WHITE SCHEDULE OF FLOOR FINISHES
EXTERIOR WALL WHITE & GREY MARK DESCRIPTION
DECORATIVE WALL BROWN CR WALL GLAZED TILE
JAMB WHITE CR FLOOR UNGLAZED TILE
SHADE OF YELLOW
CANOPY (AMBER)
FLOOR GRANITE TILES
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
GROUND FLOOR PLAN CHARMINE B. OCITE
SECOND FLOOR PLAN ENGINEERING ASSISTANT
CARAGA REGION
BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING)
PREPARED:
BARANGAY KARAOS, SAN FRANCISCO, LEONE FE A. LUCENIO A 3
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE AGUSAN DEL SUR ENGINEER II/ASST. CHIEF, ENGINEER II/ACTING CHIEF, OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
3 13 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS
ELMO M. ALONDE PLANNING AND DESIGN SECTION PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE:
CONTINUOUS COLUMN: 0.20M X
0.40M USING MAIN BARS W/
10MMØ TIES SPCD @ 0.15MOC

A B C D E F A B C D E F
18.00 18.00

4.00 3.50 3.50 3.50 3.50


4.00 3.50 3.50 3.50 3.50
RAILINGS RAILINGS RAILINGS
W-4 W-1 W-1 W-1 W-1 W-4 B
1
PW
9

3.56
STIFFENER COLUMN: 0.15M X 0.30M
W/ 6-12MMØ MAIN BARS W/ 10MMØ
O F F I C E S P A C E TIES SPCD @ 0.15MOC
5.50

6.15
CHIEF OFFICE

6.90
water tank
(2000L)
10MM SQUARE BARS PRE-FAB.
D-2 TEMPORARY BLOCK GRILLS
2.00 (DESIGNED AS SHOWN) water tank
W-4A
(2000 L)
1.00

D-2 EXTEND RC COLUMN TO


D-4 D-4 PW
1.20MTS. FROM FIN. FLR. LINE
12.90

12.90
10

12.90

12.90
D-1
D-2
2

1.55
1.20

3.11
R O O F D E C K
2.20

2.20
ELEV. ELEV.
OFFICE SPACE D-2
PW
11

6.00
PRINTING ROOM
2'

6.00
101112131415161718 101112131415161718
D-2
W-1 DOWN
3.00

3.00
9 9
W-9 UP 1.20 1.20
8 7 6 5 4 3 2 1
0.30

0.30
8 7 6 5 4 3 2 1

2.70 W-9 W-8 B


W-1 W-1 W-1
3 B
4.00 3.50
RACEWAY 3.50 3.50 3.50 RACEWAY
RAILINGS RAILINGS
7.50 10.50
4.00 3.50 3.50 3.50 3.50

18.00

PROVIDE: 14MM MARINE PLYWOOD BOX TYPE SIDEWALL


STAIR BLOCK (UP TO WINDOW BOTTOM LEVEL)

1 THIRD FLOOR PLAN 2 ROOF DECK PLAN


A-4 SCALE 1:100 METERS A-4 SCALE 1:100 METERS

SCHEDULE OF COLOR FINISHES SCHEDULE OF WALL FINISHES


MARK DESCRIPTION MARK DESCRIPTION
EAVES OF CEILING BEIGE WALL ACCENT WALL
INTERIOR WALL BEIGE ACCENT WALL ACCENT TILE
INSIDE CEILING WHITE SCHEDULE OF FLOOR FINISHES
EXTERIOR WALL WHITE & GREY MARK DESCRIPTION
DECORATIVE WALL BROWN CR WALL GLAZED TILE
JAMB WHITE CR FLOOR UNGLAZED TILE
SHADE OF YELLOW
CANOPY (AMBER)
FLOOR GLAZED TILE
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
THIRD FLOOR PLAN CHARMINE B. OCITE
ROOF DECK PLAN ENGINEERING ASSISTANT
CARAGA REGION
BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING)
PREPARED:
BARANGAY KARAOS, SAN FRANCISCO, LEONE FE A. LUCENIO A 4
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE AGUSAN DEL SUR ENGINEER II/ASST. CHIEF, ENGINEER II/ACTING CHIEF, OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
4 13 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS
ELMO M. ALONDE PLANNING AND DESIGN SECTION PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE:
100MM X 200MM RC CANOPY W/ 10MM
CHB WALL ON SMOOTH CONCRETE 25MM THK RC PROTRUDING WALL ACCENT Ø TEMPERATURE BARS SPACED @
PLASTERED PAINTED FINISH ACP GUTTER/FLASHING 0.20 MOC BOTHWAYS (WINDOW
PLASTER PAINTED FINISH AS SHOWN
CANOPY)
STAINLESS STEEL SIDE RAILINGS CHB WALL ON SMOOTH CONCRETE
25MM THK RC PROTRUDING WALL ACCENT 25MM X 100MM RC PROTRUDING PLASTERED PAINTED FINISH
SMOOTH PLASTER PAINTED FINISH AS SHOWN 25MM THK RC PROTRUDING WALL ACCENT PLASTER PAINTED
FINISH AS SHOWN OUTDOOR WALL DECO STONE FINISH
WALL ACCENT SMOOTH
LEDGE STONE (TEXTURED SURFACE)
PLASTER PAINTED FINISH
CHB WALL ON SMOOTH

A B C D E F PAINTED PLASTERED FINISH


2 2' 3
OUTDOOR WALL DECO STONE FINISH
LEDGE STONE (TEXTURED SURFACE)
1.95 1.30 AWNING TYPE WINDOW GLASS
ROOFING SLOPE
1 0.15 0.15
FIX WINDOW GLASS
(REFLECTIVE GLASS)
3.27
0.85
50MM X 25MM X 1.5MM STAINLESS
APEX LINE APEX LINE

0.10
STEEL TUBULAR RAILING

0.82 0.43
1.10

0.30
1.52 1.52

0.10 0.10

0.80 0.60 0.80


CEILING LINE

0.60
0.40
RC MOULD BLOCK AT
0.10 TOP WALL RAILING W-4A

2.90
2.80

2.80
0.10
0.57

1.30

1.13
1.18

0.50

0.45 0.70
ROOF DECK LINE
0.10
ROOF DECK LN.

0.10
0.42
F F F F F F F F F F F F
W-6
3.45

3.45
W-5 W-5
3.00

3.00
W-1 W-1 W-1
15.60

15.60
3RD F.F.L 3RD F.F.L
0.50

0.50
CEILING LINE CEILING LINE
W-9

7.80
W-9
F F F F F F F F F F F F
W-6
3.50

3.50
W-5 W-5
3.00

3.00
W-8 W-1 W-1 W-1

2ND F.F.L 2ND F.F.L


0.50

0.50
CEILING LINE CEILING LINE

0.25 0.10
0.50
2.52 0.38
0.10

0.50
4.10

4.10
F FW-2 F F F FW-2 F F W-3

2.60
0.25
0.50

2.50
FINISH FLOOR LINE FINISH FLOOR LINE

0.60

0.60
NATURAL GRADE LINE NATURAL GRADE LINE
25MM X 100MM RC PROTRUDING 25MM X 50MM STAINLESS
0.70 5.45
0.07 2.70 WALL ACCENT SMOOTH PLASTER 1.00 STEEL TUBULAR RAILINGS
PAINTED FINISH AS SHOWN 6.73 6.25

1 FRONT ELEVATION 2 LEFT-SIDE ELEVATION


A-5 SCALE 1:100 METERS
A-5 SCALE 1:100 METERS

DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
FRONT ELEVATION CHARMINE B. OCITE
LEFT SIDE ELEVATION ENGINEERING ASSISTANT
CARAGA REGION
BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING)
PREPARED:
BARANGAY KARAOS, SAN FRANCISCO, LEONE FE A. LUCENIO A 5
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE AGUSAN DEL SUR ENGINEER II/ASST. CHIEF, ENGINEER II/ACTING CHIEF, OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
5 13 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS
ELMO M. ALONDE PLANNING AND DESIGN SECTION PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE:
PRE-PAINTED LONG SPAN ROOFING
PROVIDE: 3 - HOLE (50MMX100MM) ON SHEET TRIWAVE TYPE (0.427MM)
RC WALL FOR WATER DRAINAGE, 25MM DEPTH X 100MM WIDTH
USE 50MM X 100MM X 1.5MM
STAINLESS STEEL TUBULAR BOX,
FAB. AND USE AS DOWNSPOUT
F E D C B A PROTRUDING WALL ACCENT
HORIZONTAL SMOOTH PLASTERED
FINISH
AS SHOWN 100MM X 100MM RC BLOCK
W/ 1-10MMØ BARS 150MM X 200MM RC CANOPY W/ 10MM
ANCHORED TO RC POST Ø TEMPERATURE BARS SPACED @
0.20 MOC BOTHWAYS CHB WALL ON SMOOTH CONCRETE
APEX LINE PLASTERED PAINTED FINISH

3 2' 2 1
1.75

AWNING TYPE WINDOW GLASS


CHB WALL ON SMOOTH CONCRETE PRE-PAINTED GI SHEET
PLASTERED PAINTED FINISH SIDE FLASHING (GA. 24)
CEILING LINE 25MM DEPTH X 100MM WIDTH
APEX LINE PROTRUDING WALL ACCENT

0.82 0.42
HORIZONTAL SMOOTH PLASTERED
FINISH
2.80

1.75
W-4
1.30

ROOF DECK
FLR. LINE
0.10

CEILING LINE
W-4A
CEILING LINE
D-2 D-2

2.90
2.80

2.71
W-4 W-4

2.50
3.45

1.30
0.86
3.00

W-1 W-1 W-1 W-4


ROOF DECK LINE
6.01

CEILING LINE
15.60

3RD F.F.L
7.41
0.50

3.45
CEILING LINE

3.00
W-1

71
0.
D-2
3.50

0.25

0.65
1.05

1.25
3.00

W-1 W-1 W-1

15.60
3RD F.F.L

0.50
1.
98

98
1.

CEILING LINE 10MM SQUARE BARS PRE-FAB.


2ND F.F.L
TEMPORARY BLOCK GRILLS
0.50

(DESIGNED AS SHOWN)

3.50
CEILING LINE

3.00
W-1
W-6 W-6 D-2
W-4
4.10

W-2 W-2
3.74

3.74

2ND F.F.L
D-1

0.50
FINISH FLOOR LINE CEILING LINE

NATURAL GRADE LINE W-3

4.10
FINISH FLOOR LINE

NATURAL GRADE LINE

1 REAR ELEVATION
A-6 SCALE 1:100 METERS 2 RIGHT-SIDE ELEVATION
A-6 SCALE 1:100 METERS

DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
REAR ELEVATION CHARMINE B. OCITE
RIGHT SIDE ELEVATION ENGINEERING ASSISTANT
CARAGA REGION
BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING)
PREPARED:
BARANGAY KARAOS, SAN FRANCISCO, LEONE FE A. LUCENIO A 6
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE AGUSAN DEL SUR ENGINEER II/ASST. CHIEF, ENGINEER II/ACTING CHIEF, OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
6 13 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS
ELMO M. ALONDE PLANNING AND DESIGN SECTION PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE:
A B C D E F

APEX LINE

4.55

1.00
ROOF DECK LINE 54
53
52
51
50
49
48
47
46

3.45
45

3.00
44
43
42
41
40
39
38
15.60

0.45
37
3RD F.F.L 36

0.50
35
34
33
CEILING LINE 31
32

30
29
28
3.50

27
3.00
26
25
24
23
22
21
20

2ND F.F.L 19
18
0.50

17
16
15
14
CEILING LINE 13
12
11
10
9
8
25MM X 75MM X 1.5MM STAINLESS STEEL
4.10

7 RECTANGULAR TUBULAR HANDRAIL


6
5
4
3
2
1
FINISH FLOOR LINE

NATURAL GRADE LINE

63MM X 63MM X 1.5MM STAINLESS STEEL SQUARE 3-25MM X 50MM X 1.5MM STAINLESS STEEL
TUBULAR POST W/ RAILING BASE; ACCY. RECTANGULAR TUBULAR HORIZONTAL RAILINGS

1 SECTION THRU "A"


A-7 SCALE 1:100 METERS

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
SECTION THRU "A" CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION
BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING)
PREPARED:
BARANGAY KARAOS, SAN FRANCISCO, LEONE FE A. LUCENIO A 7
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE AGUSAN DEL SUR ENGINEER II/ASST. CHIEF, ENGINEER II/ACTING CHIEF, OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
7 13 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS
ELMO M. ALONDE PLANNING AND DESIGN SECTION PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE:
1.95
PROTRUDING
ALUMINUM FRAME 0.65 0.65 0.65
(50MMX100MM)

1.34

1.00
1.00

4.40
3RD FLOOR LINE

1.00
1.00
100MM X 200MM RC CANOPY W/ 10MM

8.80
Ø TEMPERATURE BARS SPACED @

1.02
0.20 MOC BOTHWAYS (WINDOW
CANOPY)
3.00 0.30 0.30 0.30 0.30 2ND FLOOR LINE

1.00
0.75 0.75 0.75 0.75 0.60

4.40
0.50 0.50 0.50 0.50

1.00
0.60 0.60 0.60
0.90

2.10
1.80

1.80

1.00
1.34
2.40

2.40
0.90

0.70
0.41 0.41 0.41
0.60

0.60

0.60
FINISH FLOOR LINE

0.93
DESIGNATION W-1 (SEAMLESS TYPE) DESIGNATION W-4 (SEAMLESS TYPE) DESIGNATION W-8 (SEAMLESS TYPE)
DESCRIPTION AWNING/FIXED WINDOW DESCRIPTION AWNING WINDOW DESCRIPTION FIXED/AWNING WINDOW
MATERIAL FINISH 6MM THK. GLASS MATERIAL FINISH 6MM THK. DESIGNATION W-4A (SEAMLESS TYPE) MATERIAL FINISH 6MM [Link]
NO. OF SETS: 15 SETS REFLECTIVE GLASS DESCRIPTION AWNING WINDOW NO. OF SETS: 1 SET
LOCATION: OFFICE SPACE, ARCHIVE ROOM, NO. OF SETS: 1 SET MATERIAL FINISH 6MM THK. LOCATION: STAIR
CONFERENCE ROOM LOCATION: CHIEF OFFICE REFLECTIVE GLASS MAIN ALUMINUM FRAME SIZE:
NO. OF SETS: 1 SET 50MM X 100MM
NOTE: ALL WINDOW USE REFLECTIVE GLASS LOCATION: ROOF DECK

1 SCHEDULE OF WINDOWS
A-8 SCALE 1:100 METERS

0.12 2.70
0.90
HIDDEN FRAME
0.10 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.10
0.05
0.63 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.63

100MM X 120MM RC CANOPY W/ 10MM Ø


TEMPERATURE BARS SPACED @ 0.20 MOC
BOTHWAYS (WINDOW CANOPY)

3.10

3RD FLOOR LINE


0.70 0.85 0.85 0.70
1.00

0.40
9.70

2.50

2.10
2.10
2ND FLOOR LINE

DESIGNATION D-1 DESIGNATION D-2


DESCRIPTION DOUBLE SWING DOOR DESCRIPTION GLASS DOOR
0.05

MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link]


NO. OF SETS: 3 SETS NO. OF SETS: 6 SETS
PROTRUDING LOCATION: ENTRANCE, OFFICE AREA
1.90

ALUMINUM FRAME LOCATION: EXIT, OFFICE AREA,


(50MMX100MM)
FINISH FLOOR LINE

DESIGNATION W-9 (SEAMLESS TYPE)


DESCRIPTION FIXED WINDOW
MATERIAL FINISH 6MM [Link] 2 SCHEDULE OF DOORS
NO. OF SETS: 2 SETS
LOCATION: STAIRCASE
A-8 SCALE 1:100 METERS
MAIN ALUMINUM FRAME SIZE: 50MM X 100MM

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
SECTION THRU "A" CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION
BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING)
PREPARED:
BARANGAY KARAOS, SAN FRANCISCO, LEONE FE A. LUCENIO 8 8
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE AGUSAN DEL SUR ENGINEER II/ASST. CHIEF, ENGINEER II/ACTING CHIEF, OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
8 13 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS
ELMO M. ALONDE PLANNING AND DESIGN SECTION PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE:
2.77
1.06
0.05 0.96 0.05 9.20
7.00 1.34 1.34
0.05 0.05 2.90
1.40 1.40
0.05 1.71 1.71 0.05 1.71 1.71 0.05 0.05 1.14 1.14 1.11 1.11 1.11 1.11 1.14 1.14 0.05
2.27

2.27

2.37

2.37

2.37
2.70

2.70

2.80

2.80

2.80
0.43

0.43

0.43

0.43

0.43
FINISH FLOOR LINE
SECOND FLOOR
FINISH FLOOR LINE

DESIGNATION PW-1 DESIGNATION PW-2 DESIGNATION PW-3 DESIGNATION PW-4 DESIGNATION PW-5
DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL
MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link]
NO. OF SETS: 1 SET NO. OF SETS: 1 SET NO. OF SETS: 1 SET NO. OF SETS: 1 SET NO. OF SETS: 1 SET
LOCATION: SURVEY OFFICE LOCATION: SURVEY OFFICE LOCATION: CONFERENCE ROOM LOCATION: ARCHIVE ROOM LOCATION: OFFICE SPACE
MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM

3.95 5.60
3.20
2.80 2.80
1.98 1.98
3.02
1.26 1.23 0.95 0.95 0.95 0.95 1.00 1.10 1.10
1.46 1.36 1.36 1.36 1.36
0.05 1.46 0.05

0.70

2.35
2.35

2.35
2.37

2.37

2.37

2.80
2.80

2.80

2.80

2.80

2.80

2.80

2.80
D2

2.10

0.45
0.45

0.45
0.43

0.43

0.43
SECOND FLOOR THIRD FLOOR
FINISH FLOOR LINE FINISH FLOOR LINE

DESIGNATION PW-6 DESIGNATION PW-7 DESIGNATION PW-8 DESIGNATION PW-9 DESIGNATION PW-10 DESIGNATION PW-11
DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL
MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link]
NO. OF SETS: 2 SETS NO. OF SETS: 1 SET NO. OF SETS: 1 SET NO. OF SETS: 1 SET NO. OF SETS: 1 SET NO. OF SETS: 2 SETS
LOCATION: OFFICE SPACE LOCATION: OFFICE SPACE LOCATION: OFFICE SPACE LOCATION: CHIEFT OFFICE LOCATION: PRINTING ROOM LOCATION: PRINTING ROOM
MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM

1 SCHEDULE OF GLASS PARTITION WALLS


A-8 SCALE 1:100 METERS

DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
FRONT ELEVATION CHARMINE B. OCITE
LEFT SIDE ELEVATION ENGINEERING ASSISTANT
CARAGA REGION SCHEDULE OF WINDOWS
BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING)
PREPARED:
BARANGAY KARAOS, SAN FRANCISCO, LEONE FE A. LUCENIO A 9
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE AGUSAN DEL SUR ENGINEER II/ASST. CHIEF, ENGINEER II/ACTING CHIEF, OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
9 13 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS
ELMO M. ALONDE PLANNING AND DESIGN SECTION PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE:
A B C D E F A B C D E F
3.85 3.50 3.50 3.50 3.50

50MM X 75MM X 1.5MM GI


0.15M X 0.30M RC BEAM W/ 4-16MMØ MAIN C-PURLINS SPCD @ 0.60MOC
BARS W/ 10MMØ STIRRUPS SPCD @ 0.125MOC 0.55
10MMØ SAG ROD W/ N & W

4.00 3.50 3.50 3.50 3.50

0.77

0.97
1 SSG 1
100MM X 100MM X 3.18MM(81")
SQUARE STAINLESS STEEL POST
CHB PLANT BOX @
WATER DRAIN SLOPE DIRECTION 0.20MTS HIGH
(2% FLOOR SLAB SLOPE)
6.15

6.15
6.90

6.90
6.70
SSG

2-50MM X 100MM X 3.18MM(81")


RECTANGULAR TUBULAR STAINLESS
STEEL GIRT (TOP & BOTTOM)-SSG

1.00
SSG

SSG

SSG

SSG
12.90

12.90

12.90

12.90
RF

RF

RF

RF
2 2
1.55

1.55
SSG

0.75
1.30
2.85
2.20

2.20

2.55
ELEV. ELEV.

RF-3

1.05
2' 2'

6.00

6.00
25MM X 25MM X 2.0MM ALUMINUM BOX
FOR ALUMINUM CLADDING PANEL
3.00

3.00
FRAME-JOISTS SPCD @ 0.40 MOC BW

3.45
1.00

RF-1

RF-1
RF-4

RF-2
3 3

0.25
SHRUBS/PLANTS
GREEN GRASS 2.43 2.43 2.43 3.50 3.50 3.50

50MM X 75MM X 1.5MM GI 0.41


4.00 3.50 3.50 3.50 3.50 C-PURLINS SPCD @ 0.60MOC
7.90
CONTINUOUS RC COLUMN W/ 0.15M X 0.30M
LINTEL BEAM W/ 4-16MMØ MAIN BARS W/
10MMØ STIRRUPS SPCD @ 0.20MOC

2 GIRT PLAN (ROOF DECK) 2 TRUSSES PLAN (ROOF DECK)


A-3 SCALE 1:100 METERS A-3 SCALE 1:100 METERS

DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
GIRT PLAN (ROOF DECK) CHARMINE B. OCITE
TRUSS PLAN (ROOF DECK) ENGINEERING ASSISTANT
CARAGA REGION
BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING)
PREPARED:
BARANGAY KARAOS, SAN FRANCISCO, LEONE FE A. LUCENIO A 10
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE AGUSAN DEL SUR ENGINEER II/ASST. CHIEF, ENGINEER II/ACTING CHIEF, OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1013 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS
ELMO M. ALONDE PLANNING AND DESIGN SECTION PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE:
PROVIDE METAL FURRING FOR
uPVC PANEL BOARD ATTACHMENT

A B C D E F A B C D E F
uPVC CEILING PANEL (180MM X 8MM X 3MTS.)
W/ END CAP MOULDING PRE-PAINTED LONGSPAN ROOFING
SHEET (0.427MM)-TRIWAVE TYPE

11.41
11.41

3.50

1 1
2.33

2.57
1.31

8.42

8.42
6.90

6.90
7.70
SLOPE
12.90

12.90

12.90

12.90
3.50 2.30 3.50 2.30

2 2
1.30

1.30
NON-SLIP uNGLAZED FLOOR TILES
2.20

2.20
ELEV. ELEV. (600MM X 600MM)

2' 2'

6.00

6.00
SHRUB
SLOPE PLANTS
4.50

4.50
3.00
3 3

0.25
GREEN GRASS
(LANDSCAPE)
7.90 3.50 3.50 7.90 3.50 3.50

ALUMINUM CLADDING PANEL (ACP) ROOFING AND ALUMINUM CLADDING PANEL (ACP) ROOFING AND
CEILING AREA COVERING AS SHOWN W/ ALUMINUM CEILING AREA COVERING AS SHOWN W/ ALUMINUM
BOX FRAME-JOISTS FOR FASTENING/ANCHORAGE BOX FRAME-JOISTS FOR FASTENING/ANCHORAGE

2 REFLECTED CEILING PLAN (ROOF DECK) 2 ROOF PLAN (ROOF DECK)


A-3 SCALE 1:100 METERS A-3 SCALE 1:100 METERS

DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION
BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING)
PREPARED:
BARANGAY KARAOS, SAN FRANCISCO, LEONE FE A. LUCENIO A 11
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE AGUSAN DEL SUR ENGINEER II/ASST. CHIEF, ENGINEER II/ACTING CHIEF, OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
11 13 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS
ELMO M. ALONDE PLANNING AND DESIGN SECTION PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE:
50MM X 50MM X 3MM STAINLESS STEEL
ANGLE BARS LADDER STAIR FRAME W/
50MM X 3MM STAINLESS STEEL FLAT BAR
STEPS FLOORING (5 PCS PER STEP)

25MM X 25MM X 1.5MM STAINLESS


STEEL SQUARE TUBULAR RAILINGS

25MM X 75MM X 1.5MM STAINLESS


STEEL RECTANGULAR TUBULAR 50MM X 50MM X 2.0MM STAINLESS
HANDRAIL STEEL SQUARE TUBULAR INCLINED
SUPPORT FRAME AS SHOWN

0.975
0.785
0.220
0.10 0.315

0.225
0.075
0.40 0.135

0.1
0.4

0
0.435 0.435

0.1
0.87

0.78
5
0.4

0.1
1.4

0.25
0
2
1.61
SIX(6) SPACES EQUAL BAY

0.78
5 RC BEAM
0.4
0.29 0.22

3.50
0.435
0.51

1.4
0.25

2
250MM X 435MM X 12MM THK
0.78
0.10

STAINLESS STEEL PLATE W/


0.435
4-12MMØ X STAINLESS STEEL
0.435 1.4
0.25

BOLTS ANCHORED/EMBED TO 2
RC WALL W/ N&W
1.61

0.435 1.4
2

50MM X 50MM X 2.0MM STAINLESS


RC COLUMN
STEEL SQUARE TUBULAR INCLINED
0.135 0.40

SUPPORT FRAME AS SHOWN

0.135
0.35 0.16 0.71 0.71 0.71

0.20

TYPICAL ELEVATION
25MM X 50MM X 2MM STAINLESS STEEL
50MM X 50MM X 3MM STAINLESS STEEL
ANGLE BARS LADDER STAIR FRAME W/
TYPICAL SIDE SECTION
RECTANGULAR TUBULAR GRAB/STEP AND 50MM X 3MM STAINLESS STEEL FLAT BAR
SIDE LADDER SUPPORT/BRACE STEPS FLOORING (5 PCS PER STEP)
0.130

0.60

1 FIRE ESCAPE LADDER


1.20

0.35
0.60

A-13 NOT TO SCALE

0.31 0.31 0.31 0.31 0.31 0.31 0.31 1.46

50MM X 50MM X 1.5MM SQUARE STAINLESS


3.65 STEEL TUBULAR POST/RAILINGS

FLOOR PLAN
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION
BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING)
PREPARED:
BARANGAY KARAOS, SAN FRANCISCO, LEONE FE A. LUCENIO A 12
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE AGUSAN DEL SUR ENGINEER II/ASST. CHIEF, ENGINEER II/ACTING CHIEF, OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
12 13 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS
ELMO M. ALONDE PLANNING AND DESIGN SECTION PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE:
50MM X 100MM X 3.18MM(81")
RECTANGULAR STAINLESS
STEEL ANGLE BAR FASCIA FRAME INSTALL STEEL RAFTER POST
ROOF PERIMETER (SEE DETAIL)

PRE-PAINTED LONGSPAN ROOFING


SHEET (0.427MM)-TRIWAVE TYPE

8.44
PRE-PAINTED GI SHEET
SIDE FLASHING (GA. 24)
50MM X 75MM X 1.5MM GI
C-PURLINS SPCD @ 0.60MOC

FULL WELD
0.50

0.30

0.10
0.30

SSG

SSG 100MM X 100MM X 3.18MM(81")


SQUARE STAINLESS STEEL
uPVC CEILING PANEL (180MM X 8MM X 3MTS.) POST
W/ END CAP MOULDING
1.70

2-50MM X 100MM X 3.18MM(81")


RECTANGULAR TUBULAR STAINLESS
STEEL GIRT (TOP & BOTTOM)-SSG
50MM X 100MM X 3.18MM(81") RECTANGULAR STAINLESS STEEL RAFTER TRUSS W/
50MM X 100MM X 3.18MM(81") RECTANGULAR STAINLESS STEEL RAFTER POST
4-12MMØ X 100MM ANCHOR BOLTS

2.80
100MM X 100MM X 3.18MM(81") SQUARE STAINLESS STEEL POST W/ N&W ON 0.20M X 0.20M X 10MM
THK STAINLESS STEEL PLATE
FULL WELD

FIN FLR LN

RC SLAB

ELEVATION/SECTION

RC POST @ ROOF DECK

0.05 0.10 0.05

50MM X 100MM X 3.18MM(81")


0.95 3.45 3.45 0.73
RECTANGULAR STAINLESS
STEEL RAFTER POST

0.05

0.05 0.05
0.10
C
2 ROOF DECK TRUSS SECTION 100MM X 100MM X 3.18MM(81")
L

A-4 NOT

0.05
TO SCALE SQUARE STAINLESS STEEL
POST
FULL WELD

SECTION PLAN (POST TO RAFTER POST)


VARIES

0.05 0.10 0.05

FULL WELD
PRE-PAINTED GI SHEET 4-12MMØ X 100MM
25MM X 25MM X 1.2MM STEEL
SIDE FLASHING (GA. 24) ANCHOR BOLTS W/ N&W

0.05
ANGULAR BAR FASCIA FRAME
ON 0.20M X 0.20M X 10MM
THK STEEL PLATE
0.25

0.10
100MM X 100MM X 3.18MM(81")

0.05
SQUARE STAINLESS STEEL
0.60 0.60 0.60 0.60 0.60 POST

SECTION PLAN (POST/PEDESTAL)

2 STEEL FASCIA FRAME DETAIL 2 SS PEDESTAL POST DETAILS


A-4 NOT TO SCALE
A-4 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION
BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING)
PREPARED:
BARANGAY KARAOS, SAN FRANCISCO, LEONE FE A. LUCENIO A 13
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE AGUSAN DEL SUR ENGINEER II/ASST. CHIEF, ENGINEER II/ACTING CHIEF, OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
13 13 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS
NILO B. NABAUNAG PLANNING AND DESIGN SECTION PLANNING AND DESIGN SECTION
ENGINEER II DATE: DATE: DATE:
100MM X 100MM RC BLOCK
75MM X 44MM X 1.5MM STAINLESS STEEL
W/ 1-10MMØ BARS
25MM X 25MM X 2.0MM ALUMINUM BOX TUBULAR TOP HANDRAIL AND POSTS
ANCHORED TO RC POST
FOR ALUMINUM CLADDING PANEL W/ 5-38MM X 25MM X 1.5MM STAINLESS
FRAME-JOISTS SPCD @ 0.40 MOC BW STEEL TUBULAR RAILINGS SPCD EQUALLY
50MM X 75MM X 1.5MM GI 0.10 2.90
0.10
C-PURLINS SPCD @ 0.60MOC
1.45 1.45
0.10 0.10 RC POST
ALUMINUM CLADDING PANEL (ACP) ROOFING AND

0.10
CEILING AREA COVERING AS SHOWN W/ ALUMINUM

0.475
BOX FRAME-JOISTS FOR FASTENING/ANCHORAGE

EQUAL BAY
6.09

SPACE
SIX(6)
0.95
0.95
1.30

1.20

1.10
A

0.475
25
1. 6
1.1
C

0.15
0.94

0.15
9
1.0

0.10
0.78
FIN FLR LN FIN FLR LN
C

0.10

0.10
0.10
0.64

0.49

0.34
0.05
1.04 75MM X 44MM X 1.5MM STAINLESS STEEL

0.07
B TUBULAR BRACES/SUPPORT EMBED AND
WELD TO BARS FOR ANCHORAGE
1.00 1.00 1.00 1.00

TYPICAL SS RAILINGS @ ROOF DECK


5.50 0.40

RF-1 DETAIL NOTES:


A - 50MM X 50MM X 6MM

0.14
3.44
STEEL ANGLE BAR
B - 50MM X 50MM X 6MM
STEEL ANGLE BAR A

0.57
C - 50MM X 50MM X 6MM C

0.41
STEEL ANGLE BAR

0.27
150MM X 400MM STIFFENER COLUMN/POST

0.07
(SCP) W/ 4-25MMØ REINF. BARS W/ 10MMØ
TIE BARS SPCD @ 150MM OC B
1.00 1.00
A B C D E F 3.00 0.40
18.00

4.00 3.50 3.50 3.50 3.50 RF-4 DETAIL


W-4 B
1 SCP SCP
RAILINGS RAILINGS RAILINGS

4.65

0.27
A

0.27
C

0.27
6.15

6.90

0.27
SCP B

0.07
water tank 0.40
3.46
(2000L)
EXTEND RC COLUMN TO 1.40
1.20MTS. FROM FIN. FLR. LINE
12.90

12.90
(THIS POST ONLY)
water tank
2 RF-2 DETAIL
1.55

(2000 L)
2.20

ELEV.

2.70

2'
6.00

11121314151617
A
3.00

25
1. 6
1.1

0.94
10 9 8 7 6 5
1.20
C C

73
0.78

0.
0.64
0.30

3 RAILINGS RAILINGS

0.56
B
RACEWAY 3.50
4.00 3.50 3.50 3.50 B
1.00 1.00 0.55

2.55
2 CANOPY ROOF POST LOCATION (ROOF DECK)
A-3 SCALE 1:100 METERS RF-3 DETAIL
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION
BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING)
PREPARED:
BARANGAY KARAOS, SAN FRANCISCO, LEONE FE A. LUCENIO S 14
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE AGUSAN DEL SUR ENGINEER II/ASST. CHIEF, ENGINEER II/ACTING CHIEF, OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 2 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS
ELMO M. ALONDE PLANNING AND DESIGN SECTION PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE:
HOISTWAY INSIDE 1700
220 PLATFORM 1160 320
640 786 114
128

PLATFORM 1255 130


HOISTWAY INSIDE 1500

130 CAR INSIDE 110025

BG 900(8K) 56

WALL +FINISHED
795
665

( MIN. 200mm )
180 240
CAR INSIDE 1100

120
56 BG 1200(8K) 56

590

705
56
25
115

()
CLEAR OPENING
150 700 150

CONCRETE OPENING
300 1000 400
800 900

GROUND FLOOR ELEVATOR PLAN

+
EL:
2.25

FIXING OF JAMB BRACKET


SPECIFICATION

Ø9X6EA (BY OTHERS)


CONCRETE OPENING 2500
ELEV. NO & Q'TY NO.1 (1 SET)
150
USE PASSENGER

700
CAPACITY 450 KG (6 PERSONS)

300
SPEED 60 / 90 / 105 M/MIN
TYPE VVVF (WBSS)
OPERATION 1 CAR - 2 BC

700
SERVICE FLOORS ( ) FL / ( ) ST
( ) MM

1350
CAR INTERNAL SIZE 1100(W) X 1100(D)
DOOR OPENING SIZE 700(W) X 2100(H)
DOOR OPENING TYPE 2 PANEL CENTER OPENING 700
MAIN ROPE Ø6 X ( ) WIRES (2 : 1)
MOTOR CAPACITY
AC ( ) KW
(KW)
MAIN 3PH ( ) V ( ) HZ
POWER SUPPLY FINISHED FLOOR CONCRETE OPENING
LIGHT 1PH ( ) V ( ) HZ
BY OTHERS 1000

1 ELEVATOR DETAIL
S-5 SCALE 1:100 METERS

DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
FRONT ELEVATION CHARMINE B. OCITE
LEFT SIDE ELEVATION ENGINEERING ASSISTANT
CARAGA REGION SCHEDULE OF WINDOWS
BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING)
PREPARED:
BARANGAY KARAOS, SAN FRANCISCO, LEONE FE A. LUCENIO S 15
ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE AGUSAN DEL SUR ENGINEER II/ASST. CHIEF, ENGINEER II/ACTING CHIEF, OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
2 2 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS
ELMO M. ALONDE PLANNING AND DESIGN SECTION PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE:
SINGLE LINE DIAGRAM

75 KVA TRANSFORMER :
120/240 V, 3 PHASE, 1.6 % Z

2
77.408 FEET- 150 MM COPPER
NON- MAGNETIC CONDUIT
3 SINGLE CONDUCTORS
1 PER PHASE

300 A MCCB

30 AT ECB

2
43 FEET- 5.5 MM COPPER
NON- MAGNETIC CONDUIT
3 SINGLE CONDUCTORS
MOTOR CONTRIBUTION

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
SHORT-CIRCUIT CURRENT CALCULATION
CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 16
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE: DATE:
2

BUILDING LINE
MAIN FEEDER LENGTH = 80 ft

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
VOLTAGE DROP CALCULATION
CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 17
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
2 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE: DATE:
ELECTRICAL LEGENDS / SYMBOLS: SINGLE POLE WALL SWITCH ON ONE

SPECIFICATION :
SWITCH PLATE (1 GANG)
TWO SINGLE POLE WALL SWITCH ON ONE
SERVICE ENTRANCE
SWITCH PLATE (2 GANG)
THREE SINGLE POLE WALL SWITCH ON
EARTH GROUNDING
ONE SWITCH PLATE (3 GANG)
KILOWATT - HOUR METER THREE- WAY SWITCH

1. ALL ELECTRICAL INSTALLATION INDICATED HEREIN SHALL BE DONE IN PB


PANEL BOARD 9W
9 WATTS SQUARE DOWNLIGHT, LED BUILT-IN ,RECESSED
MOUNTED, 85 V-265 V, 90-95 LUMENS PER WATT
6 WATTS SQUARE DOWNLIGHT, LED BUILT-IN
CIRCUIT BREAKER 6W
ACCORDANCE WITH THE LATEST APPROVED EDITION OF THE PHILIPPINE 2
DUPLEX CONV. OUTLET, UNIVERSAL
,SURFACE MOUNTED
PULL BOX

ACCU AIR-COOLED CONDENSING UNIT POWER CIRCUIT LINE


ELECTRICAL CODE (PEC), THE REQUIREMENTS OF THE NATIONAL AND LOCAL MDP MAIN DISTRIBUTION PANEL SWITCH LINE

ATS AUTOMATIC TRANSFER SWITCH CIRCUIT HOME RUN


GOVERNMENT ENFORCING ELECTRICAL LAWS, AND THE REQUIREMENTS MCCB MOLDED CASE CIRCUIT BREAKER ACB AIR CIRCUIT BREAKER

DP DISTRIBUTION PANEL ECB ENCLOSED CIRCUIT BREAKER


OF THE ELECTRIC UTILITY SERVING THE AREA. GFCI
`
GROUND FAULT CIRCUIT INTERRUPTER

USE 4- 1.25 " Ø RSC OR RIGID PVC


2 2
2. POWER SUPPLY TO THE BUILDING SHALL BE THREE PHASE,230V NOMINAL "DP-5" CONDUCTORS: 1 SET OF 3- 14 mm THHN COPPER + 1-5.5 mm TW COPPER (G)

PULL BOX (12" X 12" X 6") PB ELEVATOR


60 Hz, 4- WIRE NEUTRAL GROUNDING. CONTROL PANEL

USE 4- 1.25" Ø RSC OR RIGID PVC


2
3. THE CIRCUIT/ CONDUIT RUN SHOWN IN THE PLAN ARE ONLY SCHEMATICS AND PULL BOX (6" X 6" X 4")
CONDUCTORS: 3- 14 mm THHN COPPER + 1-5.5 mm TW COPPER (G)

USE 1- 2" Ø RSC OR RIGID PVC


INTENDED TO SERVE AS INSTALLATION GUIDE ONLY, ACTUAL RUN SHALL BE PB 2
CONDUCTORS: 3 SETS OF 2- 2.0 mm THHN COPPER + 1-2.0 mm TW COPPER (G)

DETERMINED IN THE FIELD. MACHINE ROOM FLOOR LINE


USE 4- 1.25 " Ø RSC OR RIGID PVC
"DP-4" CONDUCTORS: 3- 14 mm THHN COPPER + 1-5.5 mm TW COPPER (G)
2

PULL BOX (18" X 12" X 6") PB


4. UNLESS OTHERWISE INDICATED IN THE PLAN, THE MINIMUM SIZE OF CONDUCTOR
AND CONDUIT SHALL BE 2.0mm TW AND 15 mm Ø PVC RESPECTIVELY. USE 4- 2" Ø RSC OR RIGID PVC
2 2
CONDUCTORS: 2 sets of 3- 14 mm THHN COPPER + 1-5.5 mm TW COPPER (G)

5. ALL ELECTRICAL MATERIALS AND EQUIPMENT SHALL BE NEW AND OF THE PULL BOX (6" X 6" X 4")
USE 1- 2" Ø RSC OR RIGID PVC
APPROVED TYPE BY THE PHILIPPINE STANDARD AGENCY FOR THE SPECIFIC PB 2
CONDUCTORS: 5 SETS OF 2- 2.0 mm THHN COPPER + 1-2.0 mm TW COPPER (G)

LOCATION AND PURPOSES. USE 4- 1.25" Ø RSC OR RIGID PVC


"DP-3" 2 2

BUILDING LINE
CONDUCTORS: 1 SET OF 3- 38 mm THHN COPPER + 1-14 mm TW COPPER (G)
PULL BOX (18" X 12" X 6") PB

6. CIRCUIT BREAKERS SHALL BE COMMERCIAL TYPE WITH PROPER KAIC RATING


AS SPECIFIED IN THE PLAN, PLUG-IN AND ONLY ONE BRAND THRU OUT. USE 4- 2" Ø RSC OR RIGID PVC
2 2 2
CONDUCTORS: 2 sets of - 14 mm THHN COPPER + 1-5.5 mm TW COPPER (G)
2 2
1 set of - 38 mm THHN COPPER + 1-14 mm TW COPPER (G)
7. MOUNTING HEIGHT SHALL BE AS FOLLOWS: PULL BOX (6" X 6" X 4")
USE 1- 2" Ø RSC OR RIGID PVC
PB 2
10.1 LIGHTING CONTROL SWITCH - 1.40 M. ABOVE FLOOR AT CENTER THIRD FLOOR LINE CONDUCTORS: 7 SETS OF 2- 2.0 mm THHN COPPER + 1-2.0 mm TW COPPER (G)

10.2 CONVENIENCE OUTLET - 0.30M. ABOVE FLOOR AT CENTER "DP-2"


USE 4- 1.25" Ø RSC OR RIGID PVC
2 2
CONDUCTORS: 1 SET OF 3- 38 mm THHN COPPER + 1-14 mm TW COPPER (G)
10.3 PANEL BOARD - 1.40M. ABOVE FLOOR AT CENTER PULL BOX (18" X 12" X 6") PB

ALL PANEL BOARD SHALL BE PROVIDED W/ NEUTRAL GROUNDING BUS.


USE 4- 2" Ø RSC OR RIGID PVC
ALL SPARE CIRCUITS SHOULD BE PROVIDED W/ EMPTY CONDUIT TERMINATED AT 2
CONDUCTORS: 2 SETS OF 3- 14 mm THHN COPPER + 1-5.5 mm TW COPPER (G)
2
CEILING INTOA 100 mm OCTAGONAL BOX. 2 SETS OF 3- 38 mm THHN COPPER + 1-14 mm TW COPPER (G)

PULL BOX (6" X 6" X 4")


USE 1- 2" Ø RSC OR RIGID PVC
SECOND FLOOR LINE PB 2
8. ALL ELECTRICAL INSTALLATION SHALL BE DONE IN ACCORDANCE WITH THE CONDUCTORS: 4 SETS OF 2- 2.0 mm THHN COPPER + 1-2.0 mm TW COPPER (G)

USE 4- 1.25" Ø RSC OR RIGID PVC


APPROVED PLANS AND SPECIFICATION, ANY PROPOSED MODIFICATION, "DP-1" 2
CONDUCTORS: 3- 14 mm THHN COPPER + 1-5.5 mm TW COPPER (G)
2

CHANGES, AND/ OR ALTERATIONS IN THE FIELD SHALL BE AFFIRMED BY THE PULL BOX (18" X 12" X 6") PB MDP

1800mm
SIGNING PROFESSIONAL ELECTRICAL ENGINEER.
GROUND FLOOR LEVEL

9. ALL ELECTRICAL WORKS SHALL BE DONE IN A WORKMANLIKE MANNER AND FINISHED GRADE LEVEL
USE 1- 22 mm2 TW COPPER GROUND WIRE IN 1" Ø RIGID PVC
SHALL BE UNDER SUPERVISION OF A DULY LICENSED ELECTRICAL ENGINEER.
USE 1- 3" Ø RSC OR RIGID PVC
CONDUCTORS: 3- 150 mm THHN COPPER + 1-22 mm TW COPPER (G)
5/8" X 10 ' COPPER CLAD GROUNDING ELECTRODE

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
GENERAL NOTES AND SPECIFICATIONS
RISER DIAGRAM
CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING LEGEND/SYMBOLS
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 18
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
3 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE: DATE:
ASELCO
(PUBLIC ELECTRIC
UTILITY PROVIDER)

NOTE:
FC PEC [Link](MOUNTING SUPPORT)
SERVICE CABLES SHALL BE SUPPORTED
BY STRAPS OR OTHER APPROVED MEANS WITHIN
300 MM OF EVERY SERVICE HEAD, GOOSENECK OR
CONNECTION TO A RACEWAY OR ENCLOSURE AND
AT INTERVALS OF NOT EXCEEDING 750 MM

3" DIA. SERVICE ENTRANCE CAP, RAINTIGHT 3" DIA. SERVICE ENTRANCE CAP, RAINTIGHT 3" DIA. SERVICE ENTRANCE CAP, RAINTIGHT 3" DIA. SERVICE ENTRANCE CAP, RAINTIGHT

1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER
CONDUCTOR CONDUCTOR CONDUCTOR CONDUCTOR
CT/PT
1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER
CONDUCTOR CONDUCTOR
300 mm
CONDUCTOR CONDUCTOR

1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER
CONDUCTOR CONDUCTOR CONDUCTOR CONDUCTOR

KWHR 3" GALVANIZED RSC CLAMP


REQUIRED WITHIN 300 mm OF
SERVICE HEAD/GOOSENECK

1 1 1 1
2" X 4" 2" X 4" 2" X 4" 2" X 4"
1 EXPANSION EXPANSION
2" X 4" EXPANSION BOLT EXPANSION EXPANSION
BOLT BOLT BOLT BOLT

SURGE 3" RIGID STEEL CONDUIT 3" RIGID STEEL CONDUIT 3" RIGID STEEL CONDUIT 750 mm

ARRESTER

4"X 4" X 6MM GALVANIZED Z BAR

FC
1 1 1 1
2" X 4" 2" X 4" 2" X 4" 2" X 4"
1 EXPANSION EXPANSION
2" X 4" EXPANSION BOLT EXPANSION EXPANSION
BOLT BOLT BOLT BOLT
4" RIGID STEEL CONDUIT 4" RIGID STEEL CONDUIT 3" RIGID STEEL CONDUIT 750 mm

3 x 167 KVA
PRIMARY VOLTAGE:13.2/7.620 X'MER
4"X 4" X 6MM GALVANIZED Z BAR 3100 mm
SECONDARY VOLTAGE:240/120
BANK

1 1 1 1
USE 4 SETS OF 3-150 mm2 THHN COPPER WIRE IN A 3" X 3 M RSC (SEE SERVICE ENTRANCE DETAIL) 2" X 4" 2" X 4" 2" X 4" 2" X 4"
1 EXPANSION EXPANSION
2" X 4" EXPANSION BOLT EXPANSION EXPANSION
BOLT BOLT BOLT BOLT

800 AT 3P
3" RIGID STEEL CONDUIT 750 mm
MDP FOR SUBSTATION (EXISTING)

USE 4 SETS OF 3-150 mm2 THHN COPPER WIRE IN A 3" X 3 M RSC (SEE SERVICE ENTRANCE DETAIL)

500 KVA STANDBY EMERGENCY DIESEL GENERATOR (EXISTING) 4"X 4" X 6MM GALVANIZED Z BAR

USE 3 SETS OF 2- 250 mm2 THHN COPPER WIRE+ 1-100 mm2 TW COPPER GROUND WIRE
1250 AT ATS mm2 COPPER
3P 100 MM2 COPPER EQUIP. EQUIP. 1 1 1 1
GROUNDING 2" X 4" 2" X 4" 2" X 4" 2" X 4"
GROUNDING CONDUCTOR 1
2" X 4" EXPANSION BOLT EXPANSION EXPANSION EXPANSION EXPANSION
CONDUCTOR BOLT BOLT BOLT BOLT
MDP 3" RIGID STEEL CONDUIT
550 mm

3" DIA. CONDUIT BODY, 3" DIA. CONDUIT BODY, 3" DIA. CONDUIT BODY, 3" DIA. CONDUIT BODY,
TYPE LB, THREADED TYPE LB, THREADED TYPE LB, THREADED TYPE LB, THREADED

22 MM2 COPPER EQUIP.


GROUNDING CONDUCTOR 300 MM
300 MM
300 MM
USE 3 - 14mm2 THHN COPPER IN USE 3 - 14mm2 THHN COPPER IN
2" Ø RIGID PVC 2" Ø RIGID PVC
TO MAIN DISCONNECT TO MAIN DISCONNECT TO MAIN DISCONNECT
USE 3 - 38mm2 THHN COPPER WIRE IN USE 3 - 14mm2 THHN COPPER IN USE 3 - 38mm2 THHN COPPER IN
2" Ø RIGID PVC 2" Ø RIGID PVC 2" Ø RIGID PVC

FIRST FLOOR THIRD FLOOR MACHINE ROOM FOURTH FLOOR SECOND FLOOR

60 AT 3 POLE 150 AT 3 POLE


SERVICE ENTRANCE DETAIL
C1
L.O
C2
L.O.
C1
L.O
C2
L.O.
C1
L.O
C2
L.O.
C1
L.O
C2
L.O.
C1
L.O
C2
L.O. NOT TO SCALE
C3 C4 C3 C4 C3 C4 C3 C4 C3 C4
L.O C.O. L.O L.O. L.O C.O. C.O C.O. L.O L.O.
C5 C6 C5 C6 C5 C6 C5 C6 C5 C6
C.O C.O L.O C.O ACU ELEVATOR MOTOR SPARE SPARE L.O L.O
C7 C8 C7 C8 C8 C7 C8
C.O ACU C.O F.O. SPARE SPARE L.O C.O.
C9 C10 C9 C10 5.5 MM2 COPPER EQUIP. C9 C10
ACU SPARE C.O FO GROUNDING CONDUCTOR SPO C.O
C11 C12 5.5 MM2 COPPER EQUIP. C11 C12
5.5 MM2 COPPER EQUIP.
FO
C13
F.O
C14
GROUNDING CONDUCTOR C.O
C13
C.O
C14
GROUNDING CONDUCTOR C.O ACU C.O F.O.
C15 C16 C15 C16
ACU ACU F.O C.O
C17 C18 C17 C18
A.C.U A.C.U A.C.U A.C.U
C19 C20 C19 C20
A.C.U SPARE A.C.U A.C.U
C21 C22
A.C.U A.C.U
14 MM2 COPPER EQUIP. C23 C24
GROUNDING CONDUCTOR SPARE SPARE

14 MM2 COPPER EQUIP.


SINGLE LINE DIAGRAM GROUNDING CONDUCTOR

NOT TO SCALE
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
SINGLE LINE DIAGRAM
CHARMINE B. OCITE
SERIVCE ENTRANCE DETAIL ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
WILFRED R. VISAYA E 19
LEONE FE A. LUCENIO ELMELYN C. POLANCOS BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
4 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE: DATE:
EXOTHERMIC WELDING

22 mm2 BCW

5/8" DIA. x 10' GROUND ROD

DETAIL A

DYNASPHERE

2.0 m (81 in.) Fiberglass Reinforced Plastic (FRP)

INLINE COUPLING

ALUMINUM MAST

CLAMP

LIGHTNING PROTECTION SYSTEM GROUND


DETAIL B TERMINALS SHALL BE BONDED TO THE
BUILDING OR STRUCTURE GROUNDING
ELECTRODE SYSTEM

22 MM2 BARE COPPER WIRE IN 1" DIA. IMC

GROUNDING ROD

EXOTHERMIC WELDING (SEE DETAIL A)

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
ROOF DECK LIGHTING LAYOUT PLAN CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 20
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
5 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
SCHEDULE AND COMPUTATION OF LOADS FOR
MAIN DISTRIBUTION PANEL (MDP) AND
CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING DISTRIBUTION PANEL NO. 1 (DP-1)
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 21
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
6 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SCHEDULE AND COMPUTATION OF LOADS FOR
OFFICE OF THE DISTRICT ENGINEER DISTRIBUTION PANEL NO. 2 (DP-2) AND CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION DISTRIBUTION PANEL NO. 3 (DP-3)
IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 22
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
7 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
SCHEDULE AND COMPUTATION OF LOADS FOR
DISTRIBUTION PANEL NO. 4 (DP-4) AND
CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING DISTRIBUTION PANEL NO. 5 (DP-5)
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 23
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
8 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE:
30.85

5.77 5.05 5.05 5.05 5.05 4.90

3.03

3.03
1.32
6W 6W 6W 6W 6W
a b c d e
5.24
3.03

2.29
6W 6W 6W 6W 6W
9.66 a b c d

D R I V E W A Y

9.95
6W 6W 6W 6W 6W
a b c d e

6W 6W 6W 6W 6W
a b c d e
18.60

18.60
9W
1.44

9W 6W 6W
d e e 9W
a
9W
b
9W
c
9W 9W
e
C4
Sabc Sde DP-1 9W 9W 9W 9W
9W 9W a b c e
3.17

9W
a a
d C2

6.49
DP-1 9W 9W 9W 9W 9W
a b c d e
3S3way Sabc 9W 9W 9W 9W 9W
9W 9W
Sde a b c d e
S1 b b
9W
4.32

9W 9W 9W 9W 9W 9W 9W
c c a b a b a
"DP-1" C3
MDP PB DP-1

5.77 5.05 5.05 5.05 5.05 4.90

30.85

1 GROUND FLOOR LIGHTING LAY OUT PLAN


E-5 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
GROUND FLOOR LIGHTING LAYOUT PLAN
CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 24
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
9 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE:
31.98

7.11 6.22 6.22 6.22 6.22

9W 9W 9W 9W 9W 9W 9W
9W 9W
d d d d d d d
d d
9W 9W 9W 9W 9W 9W

9W 9W
c c c c c c c

9.59
c c 9W 9W 9W 9W 9W 9W 9W
11.55

11.55
b b b b b b b
9W 9W
9W 9W 9W 9W 9W 9W 9W
b b
a a C2 C3 a a a a a
Sab DP-2 DP-2
9W 9W Scd
Sab Scd Sab Scd
a a S3way S3way
9W 9W 9W 9W 9W 9W

2.67
C5

22.92
9W 9W
S PB-2
9W S
2.13

9W d d

C6 9W 9W 9W 9W 9W
DP-2 9W 9W
C4 a a a a a
c c DP-2
3.91

ELEV. 9W
9W 9W 9W 9W 9W

9W 9W b b b b b
11.37

10.66
b b 9W 9W 9W 9W 9W

c c c c c
9W 9W 9W
C7
9W 9W 9W 9W 9W
5.33

DP-2
a a
3 way switches are located on d d d d
1st & 4th floor (see stairway "DP-2"
lighting lay out plan)
SabScd Sab Scd

7.11 6.22 6.22 6.22 6.22

31.98

2 SECOND FLOOR LIGHTING LAY OUT PLAN


E-5 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SECOND FLOOR LIGHTING LAYOUT PLAN
OFFICE OF THE DISTRICT ENGINEER CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 25
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
10 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE:
28.38

6.31 5.52 5.52 5.52 5.52

9W 9W 9W 9W 9W 9W
a a b b c c
9W 9W 9W
c c c
9W 9W 9W 9W 9W 9W
a a b b c c

8.67
9W 9W 9W 9W 9W 9W 9W 9W 9W

10.88
b b b a a b b c c

Sabc
9W 9W 9W 9W 9W 9W
9W 9W 9W a a b b c c
a a a
C1
DP-3 9W 9W 9W 9W 9W 9W
a a b b c c
1.58
20.34

20.34
Sdef 9W 9W 9W
9W 9W
a b c
1.89

9W 9W Sab 9W 9W 9W 9W 9W
S Scd
a a a a a b c
9W C5 C4
DP-3 DP-3
3.47

9W 9W 9W 9W 9W 9W 9W
b b b b a b c

9.46
9W 9W 9W 9W 9W 9W 9W
c c c c a b c

9W C7
9W 9W 9W 9W 9W 9W 9W
4.73

DP-2
d d d d a b c
3 way switches are located on C3
1st & 4th floor (see stairway "DP-3" DP-3
lighting lay out plan) PB
SabScd

6.31 5.52 5.52 5.52 5.52

11.82 16.55

28.38

1 THIRD FLOOR LIGHTING LAY OUT PLAN


E-6 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
THIRD FLOOR LIGHTING LAYOUT PLAN CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 26
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
11 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE:
31.93

7.10 6.21 6.21 6.21 6.21

9W 9W 9W 9W 9W
b b b c c

HVAC

10.91
9W 9W 9W 9W 9W
b b b c c

12.24
9W 9W 9W 9W 9W
b b b c c
water tank
(2000L)

9W 9W 9W 9W 9W
22.88

22.88
b b b c c
water tank
2.75

(2000 L)

9W 9W
a a
3.90

ELEV.
9W
a

10.64
9W 9W
9W
C2 3S3way Sabc
a
5.32

DP-4 9W 9W C1
DP-4
up
"DP-4"
PB

7.10 6.21 6.21 6.21 6.21

2 ROOF DECK LIGHTING LAY OUT PLAN


E-6 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
ROOF DECK LIGHTING LAYOUT PLAN CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 27
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 12 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE:
32.66

6.10 5.34 5.34 5.34 5.34 5.19

3.20

3.20
10.23

10.53
19.69

19.69
WP
WP
1.53

2 2
5.34
2
2
C7
DP-1
3.36

6.87
2 C5
DP-1
LOBBY 3.99

C6 2 3.99
DP-1
4.58

2 2 2

"DP-1""MDP" 2.67 5.34 4.33


PB
2 2 2 2

6.10 5.34 5.34 5.34 5.34 5.19

32.66

1 GROUND FLOOR CONVENIENCE OUTLET LAY-OUT PLAN


E-7 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
GROUND FLOOR CONVENIENCE OUTLET LAYOUT PLAN CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 28
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 13 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE:
32.67

7.26 6.35 6.35 6.35 6.35

2 2 2 2
C9 SPO

DP-2

2 2 2 2 2
C11
DP-2

9.80
11.80

11.80

2 4.29
2 2 2 2 2
C8 C10 4.30 C12
DP-2 DP-2 DP-2

2 2 2 2

2.72
6.35

23.41
2.99
2

2 2 2 2
2.18

2 2 2
3.27

2.67
2
C13
2 2 2 2 2
DP-2 C14 FO FO FO FO FO
3.99

DP-2
1.70
11.62

10.89
3.27 2.47

2 2 2 2
C15 FO FO FO
5.44

DP-2

2.36
2
C16
DP-2 "DP-2" FO
2 FO
2 FO
2 FO
2

1.28
PB
2 2 2

7.26 6.35 6.35 6.35 6.35

32.67

1 SECOND FLOOR CONVENIENCE OUTLET LAY OUT


E-7 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
SECOND FLOOR CONVENIENCE OUTLET LAYOUT PLAN CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 29
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
14 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE:
31.86

7.08 6.19 6.19 6.19 6.19

2 2 2 2 2
C7 2.30 4.41
DP-3

2.53
FO 2 C8 FO
2 FO
2 C10 FO
2 FO
2 FO
2
2
DP-3 DP-3 3.45
2

3.19
2
C6

9.73
DP-3

12.21
FO
2 FO
2 FO
2 FO
2 FO
2
4.42

2
2 2 2 2 2
C9
FO FO FO FO FO
DP-3
1.77

2.81
22.83

22.83
2
2.12

1.96

2.07 2 2 2
C11 FO FO FO
DP-3
3.89

2 2 2 2 O F F I C E 2

S P A C E
CONFERENCE

10.62
3.54
2 ROOM 2 2 2
C13 FO FO FO
DP-3 1.97

2 2 2 2 2
C12
5.31

DP-3

3.45
FO
2 FO
2 FO
2

1.92
"DP-3"
PB
2 2 2

7.08 6.19 6.19 6.19 6.19

13.27 18.58

31.86

1 THIRD FLOOR CONVENIENCE OUTLET LAY OUT


E-8 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
THIRD FLOOR CONVENIENCE OUTLET LAY-OUT PLAN CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 30
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
15 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE:
32.16

7.15 6.25 6.25 6.25 6.25

2 2 2 2
C4
DP-4

10.99

12.33
2
23.05

23.05
R O O F D E C K
2.77
3.93

10.72
2
C5
DP-4
5.36

"DP-4"
PB
2 2 2

7.15 6.25 6.25 6.25 6.25

2 ROOF DECK CONVENIENCE OUTLET LAY OUT


E-8 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
ROOF DECKCONVENIENCE OUTLET LAYOUT PLAN CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 31
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
16 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE:
6 W SQUARE
DOWNLIGHT, 85 V
-265 V AC, 90-95
4.82

LUMENS PER WATT, 9W 9W 9W


SURFACE MOUNTED

9W 9W 9W

6 W SQUARE
DOWNLIGHT, 85 V
5.62

-265 V AC, 90-95 9W 9W 9W


LUMENS PER WATT,
SURFACE MOUNTED
Elevator
2ND FLOOR
CEILING LINE
Hoistway 9W 9W 9W

STIFFENER C1
COLUMN DP-5
5.62

ELEVATOR
CONTROL PANEL
"DP-5"
PB

FINISH FLOOR LINE


0.96

1 ELEVATOR MACHINE ROOM LIGHTING LAYOUT


E-8 NOT TO SCALE

1 STAIRWAY LIGHTING LAY OUT PLAN


E-8 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ELEVATOR MACHINE ROOM LIGHTING LAYOUT
OFFICE OF THE DISTRICT ENGINEER STAIRWAY LIGHTING LAY OUT PLAN CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 32
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 17 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE:
21.40

4.00 3.50 3.50 3.50 3.50 3.40

18.00
2.10

2.10
4.00 3.50 3.50 3.50 3.50

C17
PB-2 ACCU OUTLET
IN NEMA 3R ENCLOSURE

C18

5.40
PB-2 ACCU OUTLET
IN NEMA 3R ENCLOSURE

6.50

6.50
6.70

6.90
C19
PB-2 ACCU OUTLET
IN NEMA 3R ENCLOSURE

1.50
12.90

12.90

12.90
1.20
1.00

C20
PB-2
2.20

2.20
ACCU OUTLET
IN NEMA 3R ENCLOSURE

4.50
1.12

6.40
C21

6.00
PB-2 ACCU OUTLET
IN NEMA 3R ENCLOSURE

1.11
C22
3.00

3.00
PB-2 ACCU OUTLET
IN NEMA 3R ENCLOSURE

4.00 3.50 3.50 3.50 3.50 3.40 4.00 3.50 3.50 3.50 3.50

21.40 18.00

1 GROUND FLOOR AIRCONDITIONING UNIT LAY OUT 2 SECOND FLOOR AIRCONDITIONING UNIT LAY OUT
E-9 NOT TO SCALE E-9 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
GROUND FLOOR AIR CONDITIONING UNIT CHARMINE B. OCITE
SECOND FLOOR AIR CONDITIONING UNIT ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 33
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
18 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE:
27.64

6.14 5.37 5.37 5.37 5.37

C14
PB-3

8.45

10.60
C15
PB-3

C16
PB-3
1.54
19.81

19.81
1.84

C17
PB-3
3.38

C18
PB-3

9.21
C19
PB-3
4.61

"DP-3"
PB

6.14 5.37 5.37 5.37 5.37

11.52 16.12

27.64

1 THIRD FLOOR AIRCONDITIONING UNIT LAY OUT


E-9 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
THIRD FLOOR AIR CIONDITIONING UNIT CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 34
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 19 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE:
CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING), BARANGAY KARAOS,
SAN FRANCISCO, AGUSAN DEL SUR
SAN FRANCISCO, AGUSAN DEL SUR

FORM POW-2015-01D-00

DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./ Description B.7 (1) Occupational Safety and Health

Unit of Measurement: : l.s


Output per Hour - As Submitted: : 1.00 l.s
Output per Hour - As Evaluated:

No. of
Designation Persons No. of Hrs Hourly Rate Amount
A.1 Labor

Safety Officer (Part Time) 1 80.00 103.63 8,290.40


First Aider (Full Time) 1 242.99 74.86 18,190.15

Sub - Total for A.1 - As Submitted 26,480.55


A.2 Labor

Sub - Total for A.2 - As Evaluated

Name and Capacity No. of Units No. of Hrs Hourly Rate Amount
B.1 Equipment

Sub - Total for B.1 - As Submitted -


B.2 Equipment

Sub - Total for B.2 - As Evaluated


C.1 Total for (A.1 + B.1) - As Submitted 26,480.55
C.2 Total for (A.2 + B.2) - As Evaluated
D.1 Output per hour - As Submitted 1.00 l.s
D.2 Output per hour - As Evaluated
E.1 Direct Unit Cost (C.1÷D.1) - As Submitted 26,480.55
E.2 Direct Unit Cost (C.2÷D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount
F.1 Materials

PPE
Helmet (Hard Hats) man-day 666.67 0.68 453.33
Safety Gloves man-day 1,333.33 3.67 4,893.33

Sub - Total for F.1 - As Submitted 5,346.67


F.2 Materials

Sub - Total for F.2 - As Evaluated


G.1 Direct Unit Cost (E.1+F.1) - As Submitted 31,827.21
G.2 Direct Unit Cost (E.2+F.2) - As Evaluated
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% of G.1
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% of G.2
I.1 Contractor's Profit (CP) - As Submitted 8% of G.1 2,546.18
I.2 Contractor's Profit (CP) - As Evaluated 8% of G.2
J.1 Value Added Tax (VAT) - As Submitted 5% of (G.1+H.1+I.1) 1,718.67
J.2 Value Added Tax (VAT) - As Evaluated 5% of (G.2+H.2+I.2)
K.1 Total Unit Cost - As Submitted (G.1+H.1+I.1+J.1) 36,092.06
K.2 Total Unit Cost - As Evaluated (G.2+H.2+I.2+J.2)
CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING), BARANGAY
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR
SAN FRANCISCO, AGUSAN DEL SUR

FORM POW-2015-01D-00

DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./ Description B.9(1) Mobilization/Demobilization

Unit of Measurement: : ls.


Output per Hour - As Submitted:
: 1.00 ls./hr
Output per Hour - As Evaluated:

No. of
Designation Persons No. of Hrs Hourly Rate Amount
A.1 Labor

Skilled Laborer 3 7.50 74.86 1,684.35


Unskilled Laborer 8 7.50 57.65 3,459.00

Sub - Total for A.1 - As Submitted 5,143.35


A.2 Labor

Sub - Total for A.2 - As Evaluated


No. of
Name and Capacity Units No. of Hrs Hourly Rate Amount
B.1 Equipment

Sub - Total for B.1 - As Submitted -


B.2 Equipment

Sub - Total for B.2 - As Evaluated


C.1 Total for (A.1 + B.1) - As Submitted 5,143.35
C.2 Total for (A.2 + B.2) - As Evaluated
D.1 Output per hour - As Submitted 1 ls./hr
D.2 Output per hour - As Evaluated
E.1 Direct Unit Cost (C.1÷D.1) - As Submitted 5,143.35
E.2 Direct Unit Cost (C.2÷D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount
F.1 Materials

Sub - Total for F.1 - As Submitted -


F.2 Materials

Sub - Total for F.2 - As Evaluated


G.1 Direct Unit Cost (E.1+F.1) - As Submitted 5,143.35
G.2 Direct Unit Cost (E.2+F.2) - As Evaluated
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% of G.1
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% of G.2
I.1 Contractor's Profit (CP) - As Submitted 8% of G.1
I.2 Contractor's Profit (CP) - As Evaluated 8% of G.2
J.1 Value Added Tax (VAT) - As Submitted 5% of (G.1+H.1+I.1) 257.17
J.2 Value Added Tax (VAT) - As Evaluated 5% of (G.2+H.2+I.2)
K.1 Total Unit Cost - As Submitted (G.1+H.1+I.1+J.1) 5,400.52
K.2 Total Unit Cost - As Evaluated (G.2+H.2+I.2+J.2)
CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (DEO BUILDING) PHASE 3, BARANGAY KARAOS, SAN FRANCISCO,
AGUSAN DEL SUR
SAN FRANCISCO, AGUSAN DEL SUR
FORM POW-2015-01D-00

DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./ Description 1003(23) Modular Partition

Unit of Measurement: l.s


Output per Hour - As Submitted: 1 l.s/hour
Output per Hour - As Evaluated:

No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor

Sub - Total for A.1 - As Submitted -


A.2 Labor

Sub - Total for A.2 - As Evaluated

Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment

Minor Tools 10% of Labor -

Sub - Total for B.1 - As Submitted -


B.2 Equipment

Sub - Total for B.2 - As Evaluated


C.1 Total for (A.1 + B.1) - As Submitted -
C.2 Total for (A.2 + B.2) - As Evaluated
D.1 Output per hour - As Submitted 1.00 l.s/hour
D.2 Output per hour - As Evaluated
E.1 Direct Unit Cost (C.1÷D.1) - As Submitted -
E.2 Direct Unit Cost (C.2÷D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount
F.1 Materials

Supply, Delivery & Installation:


Modular Partition System
Ground Floor lot 1.000 82,000.00 82,000.00
2nd Floor lot 1.000 985,145.00 985,145.00
3rd Floor lot 1.000 1,848,806.25 1,848,806.25

Mobile Foldable partition wall (Full Panel, 1mx 1.8m height) length 5.200 9,500.00 49,400.00
Including Accessories
(Pulley assembly/Self Mounted)
Consumables 3% of Materials 1,482.00

*see attached Modular Partition Components & Accessories

Sub - Total for F.1 - As Submitted 2,966,833.25


F.2 Materials

Sub - Total for F.2 - As Evaluated


G.1 Direct Unit Cost (E.1+F.1) - As Submitted 2,966,833.25
G.2 Direct Unit Cost (E.2+F.2) - As Evaluated
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% of G.1 356,019.99
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% of G.2
I.1 Contractor's Profit (CP) - As Submitted 8% of G.1 237,346.66
I.2 Contractor's Profit (CP) - As Evaluated 8% of G.2
J.1 Value Added Tax (VAT) - As Submitted 5% of (G.1+H.1+I.1) 178,010.00
J.2 Value Added Tax (VAT) - As Evaluated 5% of (G.2+H.2+I.2)
K.1 Total Unit Cost - As Submitted (G.1+H.1+I.1+J.1) 3,738,209.90
K.2 Total Unit Cost - As Evaluated (G.2+H.2+I.2+J.2)

Prepared by: Checked by:

IRISH B. AMADEO ELMELYN C. POLANCOS


Engineer II Acting Chief, Planning and Design Section
Planning and Design Section
CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (DEO BUILDING) PHASE 3, BARANGAY KARAOS, SAN FRANCISCO,
AGUSAN DEL SUR
SAN FRANCISCO, AGUSAN DEL SUR

Modular Office Partition with Table, Components & Accessories

Name and Specification Unit Quantity Unit Cost Amount


Materials & Installation

Ground Floor
Survey Room:
Sofa (3 Seaters) pc 2.000 28,500.00 57,000.00
Clerical Chair pc 1.00 5,500.00 5,500.00
Multi-Purpose Table (L= 1.50m) pc 3.00 6,500.00 19,500.00
Sub-Total 82,000.00

Total (Ground Floor) 82,000.00

2nd Floor
Kitchen:
Dining Table (12 Seaters with Chairs) set 1.00 45,000.00 45,000.00

Conference Room:
Conference Table (W:300x D120 x H: 75cm) pc 1.00 51,350.00 51,350.00
Conference Chair (Sled Type) pc 12.00 5,500.00 66,000.00
Sub-Total 117,350.00
Workstation 1:
P120120LG (Half glass/ half laminated) pc 1.00 12,035.00 12,035.00
P12090LG (Half glass/ half laminated) pc 1.00 10,005.00 10,005.00
P12060LG (Half glass/ half laminated) pc 2.00 7,938.75 15,877.50
P12030LG (Half glass/ half laminated) pc 1.00 7,938.75 7,938.75
PC-126A (Table top) pc 1.00 4,205.00 4,205.00
PC3-90A (Table top) pc 1.00 2,755.00 2,755.00
Clerical Chair pc 1.00 5,500.00 5,500.00
Mobile Pedestal pc 1.00 5,500.00 5,500.00
Total per WS1 x
12.00 personnel 765,795.00
Lounge Area:
Sofa (3 Seaters) pc 2.00 28,500.00 57,000.00

Total (2nd Floor) 985,145.00

3rd Floor
Office of the Section Chief:
Executive Table (W:160cm x D:90cm x H:75cm) pc 1.00 35,400.00 35,400.00
Executive Chair (Cow Leather), Color: Black pc 1.00 18,500.00 18,500.00
Executive Guest Chair pc 2.00 7,500.00 15,000.00
Sofa (3 Seaters), Color: Black pc 3.00 28,500.00 85,500.00
Center Table pc 1.00 13,500.00 13,500.00
Sub-Total 167,900.00
Workstation 1:
P120120LG (Half glass/ half laminated) pc 1.00 12,035.00 12,035.00
P12090LG (Half glass/ half laminated) pc 1.00 10,005.00 10,005.00
P12060LG (Half glass/ half laminated) pc 2.00 7,938.75 15,877.50
P12030LG (Half glass/ half laminated) pc 1.00 7,938.75 7,938.75
PC-126A (Table top) pc 1.00 4,205.00 4,205.00
PC3-90A (Table top) pc 1.00 2,755.00 2,755.00
Clerical Chair pc 1.00 5,500.00 5,500.00
Mobile Pedestal pc 1.00 5,500.00 5,500.00
Total per WS1 x
24.00 personnel 1,531,590.00
Lounge Area:
Sofa (3 Seaters) pc 3.00 28,500.00 85,500.00

Printing Room:
P120120LG (Half glass/ half laminated) pc 1.00 12,035.00 12,035.00
P12090LG (Half glass/ half laminated) pc 1.00 10,005.00 10,005.00
P12060LG (Half glass/ half laminated) pc 2.00 7,938.75 15,877.50
P12030LG (Half glass/ half laminated) pc 1.00 7,938.75 7,938.75
PC-126A (Table top) pc 1.00 4,205.00 4,205.00
PC3-90A (Table top) pc 1.00 2,755.00 2,755.00
Clerical Chair pc 1.00 5,500.00 5,500.00
Mobile Pedestal pc 1.00 5,500.00 5,500.00
Total per WS1 x
1.00 personnel 63,816.25

Total (3rd Floor) 1,848,806.25

GRAND TOTAL 2,915,951.25


CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (DEO BUILDING) PHASE 3, BARANGAY KARAOS, SAN FRANCISCO,
AGUSAN DEL SUR
SAN FRANCISCO, AGUSAN DEL SUR
FORM POW-2015-01D-00

DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./ Description 1007(2) Aluminum Framed Glass Door

Unit of Measurement: l.s


Output per Hour - As Submitted: 1 l.s/hour
Output per Hour - As Evaluated:

No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor

Sub - Total for A.1 - As Submitted -


A.2 Labor

Sub - Total for A.2 - As Evaluated

Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment

Sub - Total for B.1 - As Submitted -


B.2 Equipment

Sub - Total for B.2 - As Evaluated


C.1 Total for (A.1 + B.1) - As Submitted -
C.2 Total for (A.2 + B.2) - As Evaluated
D.1 Output per hour - As Submitted 1.00 l.s/hour
D.2 Output per hour - As Evaluated
E.1 Direct Unit Cost (C.1÷D.1) - As Submitted -
E.2 Direct Unit Cost (C.2÷D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount
F.1 Materials

Materials & Installation:


Aluminum Framed Glass Door ,6mm thk.

D1 (3.1 x 2.50m) survey room set 2.00 50,000.00 100,000.00


D2 (1.0 x 2.10m) set 8.00 20,000.00 160,000.00

Sub - Total for F.1 - As Submitted 260,000.00


F.2 Materials

Sub - Total for F.2 - As Evaluated


G.1 Direct Unit Cost (E.1+F.1) - As Submitted 260,000.00
G.2 Direct Unit Cost (E.2+F.2) - As Evaluated
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% of G.1 31,200.00
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% of G.2
I.1 Contractor's Profit (CP) - As Submitted 8% of G.1 20,800.00
I.2 Contractor's Profit (CP) - As Evaluated 8% of G.2
J.1 Value Added Tax (VAT) - As Submitted 5% of (G.1+H.1+I.1) 15,600.00
J.2 Value Added Tax (VAT) - As Evaluated 5% of (G.2+H.2+I.2)
K.1 Total Unit Cost - As Submitted (G.1+H.1+I.1+J.1) 327,600.00
K.2 Total Unit Cost - As Evaluated (G.2+H.2+I.2+J.2)

Prepared by: Checked by:

IRISH B. AMADEO ELMELYN C. POLANCOS


Engineer II Acting Chief, Planning and Design Section
Planning and Design Section
CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (DEO BUILDING) PHASE 3, BARANGAY KARAOS, SAN FRANCISCO,
AGUSAN DEL SUR
SAN FRANCISCO, AGUSAN DEL SUR
FORM POW-2015-01D-00

DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./ Description 1008(2) Aluminum Glass Windows

Unit of Measurement: l.s


Output per Hour - As Submitted: 1 l.s/hour
Output per Hour - As Evaluated:

No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor

Sub - Total for A.1 - As Submitted -


A.2 Labor

Sub - Total for A.2 - As Evaluated

Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment

Sub - Total for B.1 - As Submitted -


B.2 Equipment

Sub - Total for B.2 - As Evaluated


C.1 Total for (A.1 + B.1) - As Submitted -
C.2 Total for (A.2 + B.2) - As Evaluated
D.1 Output per hour - As Submitted 1.00 l.s/hour
D.2 Output per hour - As Evaluated
E.1 Direct Unit Cost (C.1÷D.1) - As Submitted -
E.2 Direct Unit Cost (C.2÷D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount
F.1 Materials

Materials & Installation:


Aluminum Framed Glass Window, Awning w/ Fixed Glass

W1 (3.0x 1.80m) set 14.00 38,000.00 532,000.00


W4 (1.95x 8.80m) set 1.00 20,000.00 20,000.00
W8 set 1.00 130,000.00 130,000.00
W9 set 2.00 100,000.00 200,000.00

Glass Wall Partitions (Interior)


PW1 set 1.00 12,000.00 12,000.00
PW2 set 1.00 80,000.00 80,000.00
PW3 set 1.00 30,000.00 30,000.00
PW4 set 1.00 100,000.00 100,000.00
PW5 set 1.00 30,000.00 30,000.00
PW6 set 1.00 30,000.00 30,000.00
PW7 set 1.00 15,000.00 15,000.00
PW8 set 1.00 15,000.00 15,000.00
PW9 set 1.00 50,000.00 50,000.00
PW11 printing rm. set 2.00 30,000.00 60,000.00

Sub - Total for F.1 - As Submitted 1,304,000.00


F.2 Materials

Sub - Total for F.2 - As Evaluated


G.1 Direct Unit Cost (E.1+F.1) - As Submitted 1,304,000.00
G.2 Direct Unit Cost (E.2+F.2) - As Evaluated
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% of G.1 156,480.00
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% of G.2
I.1 Contractor's Profit (CP) - As Submitted 8% of G.1 104,320.00
I.2 Contractor's Profit (CP) - As Evaluated 8% of G.2
J.1 Value Added Tax (VAT) - As Submitted 5% of (G.1+H.1+I.1) 78,240.00
J.2 Value Added Tax (VAT) - As Evaluated 5% of (G.2+H.2+I.2)
K.1 Total Unit Cost - As Submitted (G.1+H.1+I.1+J.1) 1,643,040.00
K.2 Total Unit Cost - As Evaluated (G.2+H.2+I.2+J.2)

Prepared by: Checked by:

IRISH B. AMADEO ELMELYN C. POLANCOS


Engineer II Acting Chief, Planning and Design Section
Planning and Design Section
CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING), BARANGAY KARAOS,
SAN FRANCISCO, AGUSAN DEL SUR
SAN FRANCISCO, AGUSAN DEL SUR

FORM POW-2015-01D-00

DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./ Description 1051(1)a Railing

Unit of Measurement: l.s


Output per Hour - As Submitted: 1.00 l.s/hour
Output per Hour - As Evaluated:

No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor

Fabrication
Construction Foreman 1 19.50 103.63 2,021.24
Skilled Laborer 1 19.50 74.86 1,460.10
Unskilled Laborer 2 19.50 57.65 2,248.86

Sub - Total for A.1 - As Submitted 5,730.20


A.2 Labor

Sub - Total for A.2 - As Evaluated

Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment

Welding Machine 1 14.63 391.00 5,719.66


Cutting Outfit 1 14.63 45.45 664.86
Minor Tools 10% of Labor 573.02

Sub - Total for B.1 - As Submitted 6,957.54


B.2 Equipment

Sub - Total for B.2 - As Evaluated


C.1 Total for (A.1 + B.1) - As Submitted 12,687.74
C.2 Total for (A.2 + B.2) - As Evaluated
D.1 Output per hour - As Submitted 1.00 l.s/hour
D.2 Output per hour - As Evaluated
E.1 Direct Unit Cost (C.1÷D.1) - As Submitted 12,687.74
E.2 Direct Unit Cost (C.2÷D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount
F.1 Materials

75mm x 44mm x 1.5mm S/S tubular m 52.00 643.83 33,479.33


38mm x 25mm x 1.5mm S/S tubular m 70.00 392.67 27,486.67
S/S Welding Rod kg. 2.44 781.00 1,905.64

Consumables 5% of Materials 3,143.58

Sub - Total for F.1 - As Submitted 66,015.22


F.2 Materials

Sub - Total for F.2 - As Evaluated


G.1 Direct Unit Cost (E.1+F.1) - As Submitted 78,702.96
G.2 Direct Unit Cost (E.2+F.2) - As Evaluated
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% of G.1 9,444.36
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% of G.2
I.1 Contractor's Profit (CP) - As Submitted 8% of G.1 6,296.24
I.2 Contractor's Profit (CP) - As Evaluated 8% of G.2
J.1 Value Added Tax (VAT) - As Submitted 5% of (G.1+H.1+I.1) 4,722.18
J.2 Value Added Tax (VAT) - As Evaluated 5% of (G.2+H.2+I.2)
K.1 Total Unit Cost - As Submitted (G.1+H.1+I.1+J.1) 99,165.73
K.2 Total Unit Cost - As Evaluated (G.2+H.2+I.2+J.2)
CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING), BARANGAY KARAOS, SAN FRANCISCO,
AGUSAN DEL SUR
SAN FRANCISCO, AGUSAN DEL SUR
FORM POW-2015-01D-00

DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./ Description 1100(10) Conduits, Boxes & Fittings (Conduit Works/Conduit Rough-in)

Unit of Measurement: l.s


Output per Hour - As Submitted: 1.00 l.s/hour
Output per Hour - As Evaluated:

No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor

Skilled Laborer 5 190.00 74.86 71,117.00


Unskilled Laborer 5 190.00 57.65 54,767.50

Sub - Total for A.1 - As Submitted 125,884.50


A.2 Labor

Sub - Total for A.2 - As Evaluated

Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment

Minor tools 10% of labor 12,588.45

Sub - Total for B.1 - As Submitted 12,588.45


B.2 Equipment

Sub - Total for B.2 - As Evaluated


C.1 Total for (A.1 + B.1) - As Submitted 138,472.95
C.2 Total for (A.2 + B.2) - As Evaluated
D.1 Output per hour - As Submitted 1.00 l.s/hour
D.2 Output per hour - As Evaluated
E.1 Direct Unit Cost (C.1÷D.1) - As Submitted 138,472.95
E.2 Direct Unit Cost (C.2÷D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount
F.1 Materials

UTILITY BOX, METALLIC, 2" X 4" pcs 20.00 42.00 840.00


JUNCTION BOX, METALLIC pcs 323.00 37.00 11,951.00
SQUARE BOX, METALLIC, 4" X 4" pcs 45.00 162.00 7,290.00
PULL BOX, 6" X 6" X 4" pcs 7.00 685.00 4,795.00
PULL BOX, 12" X 12" X 4" pcs 4.00 1,068.00 4,272.00
1/2" DIA. PVC ADAPTOR WITH LOCK NUT pcs 1,060.00 12.00 12,720.00
3/4" DIA. PVC ADAPTOR WITH LOCK NUT pcs 26.00 15.00 390.00
3" DIA. RSC ADAPTOR/CONNECTOR WITH LOCK NUT pcs 3.00 100.00 300.00
2" DIA. PVC ADAPTOR/CONNECTOR WITH LOCK NUT pcs 28.00 62.00 1,736.00
1.25" DIA. PVC ADAPTOR/CONNECTOR WITH LOCK NUT pcs 16.00 28.00 448.00
TERMINAL LUG FOR 250 MM2 COPPER CONDUCTOR pcs 12.00 2,000.00 24,000.00
3" DIA. RSC COUPLING, THREADED pcs 6.00 180.00 1,080.00
1/2" DIA. LONG SWEEP PVC ELBOW pcs 136.00 15.00 2,040.00
3/4" DIA. LONG SWEEP PVC ELBOW pcs 44.00 21.00 924.00
2" DIA. LONG SWEEP RSC ELBOW pcs 6.00 320.00 1,920.00
3 " DIA. SERVICE ENTRANCE CAP, RIGID STEEL HOT DIPPED pcs 3.00 190.00 570.00
TERMINAL LUG FOR 150 MM2 COPPER CONDUCTOR pcs 39.00 1,500.00 58,500.00
U BOLT WITH NUT, GI, 3" pcs 16.00 100.00 1,600.00
3 " DIA. RSC lengths 4.00 2,400.00 9,600.00
3 " DIA. CONDUIT BODY, TYPE LB, THREADED, RAIN TIGHT pcs 4.00 2,000.00 8,000.00
2 " DIA. PVC PIPE lengths 15.00 390.00 5,850.00
1.25 " DIA. PVC PIPE lengths 3.00 150.00 450.00
3/4 " DIA. PVC PIPE pcs 50.00 105.00 5,250.00
1/2 " DIA. PVC PIPE pcs 255.00 83.00 21,165.00

Consumables 3% of Materials 5,570.73

Sub - Total for F.1 - As Submitted 191,261.73


F.2 Materials

Sub - Total for F.2 - As Evaluated


G.1 Direct Unit Cost (E.1+F.1) - As Submitted 329,734.68
G.2 Direct Unit Cost (E.2+F.2) - As Evaluated
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% of G.1 39,568.16
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% of G.2
I.1 Contractor's Profit (CP) - As Submitted 8% of G.1 26,378.77
I.2 Contractor's Profit (CP) - As Evaluated 8% of G.2
J.1 Value Added Tax (VAT) - As Submitted 5% of (G.1+H.1+I.1) 19,784.08
J.2 Value Added Tax (VAT) - As Evaluated 5% of (G.2+H.2+I.2)
K.1 Total Unit Cost - As Submitted (G.1+H.1+I.1+J.1) 415,465.70
K.2 Total Unit Cost - As Evaluated (G.2+H.2+I.2+J.2)
CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING), BARANGAY KARAOS, SAN
FRANCISCO, AGUSAN DEL SUR
SAN FRANCISCO, AGUSAN DEL SUR

FORM POW-2015-01D-00

DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./ Description : 1101(33) Wires and Wiring Devices

Unit of Measurement: l.s


Output per Hour - As Submitted: 1.00 l.s
Output per Hour - As Evaluated:

No. of
Designation Persons No. of Hrs. Hourly Rate Amount
A.1 Labor

Skilled Laborer 3 124.00 74.86 27,847.92


Unskilled Laborer 3 124.00 57.65 21,445.80

Sub - Total for A.1 - As Submitted 49,293.72


A.2 Labor

Sub - Total for A.2 - As Evaluated

Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment

Minor tools 10% of labor 4,929.37

Sub - Total for B.1 - As Submitted 4,929.37


B.2 Equipment

Sub - Total for B.2 - As Evaluated


C.1 Total for (A.1 + B.1) - As Submitted 54,223.09
C.2 Total for (A.2 + B.2) - As Evaluated
D.1 Output per hour - As Submitted 1 l.s
D.2 Output per hour - As Evaluated
E.1 Direct Unit Cost (C.1÷D.1) - As Submitted 54,223.09
E.2 Direct Unit Cost (C.2÷D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount
F.1 Materials

5/8" X 10' COPPER CLAD GROUNDING ROD lengths 2.00 770.00 1,540.00
SINGLE POLE WALL SWITCH IN ONE SWITCH PLATE pcs 10.00 84.00 840.00
TWO SINGLE POLE WALL SWITCH IN ONE SWITCH PLATE pcs 20.00 138.00 2,760.00
THREE SINGLE POLE WALL SWITCH IN ONE SWITCH PLATE pcs 12.00 335.00 4,020.00
THREE WAY SWITCH IN ONE SWITCH PLATE pcs 8.00 160.00 1,280.00
SPECIAL PURPOSE OUTLET pcs 1.00 495.00 495.00
DUPLEX CONVENIENCE OUTLET (FLUSH TYPE) pcs 104.00 205.75 21,398.00
FLOOR OUTLET, POP-UP TYPE sets 41.00 2,190.00 89,790.00
RUBBER TAPE rolls 3.00 120.00 360.00
ELECTRICAL TAPE rolls 89.00 48.00 4,272.00

Sub - Total for F.1 - As Submitted 126,755.00


F.2 Materials

Sub - Total for F.2 - As Evaluated


G.1 Direct Unit Cost (E.1+F.1) - As Submitted 180,978.09
G.2 Direct Unit Cost (E.2+F.2) - As Evaluated
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% of G.1 21,717.37
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% of G.2
I.1 Contractor's Profit (CP) - As Submitted 8% of G.1 14,478.25
I.2 Contractor's Profit (CP) - As Evaluated 8% of G.2
J.1 Value Added Tax (VAT) - As Submitted 5% of (G.1+H.1+I.1) 10,858.69
J.2 Value Added Tax (VAT) - As Evaluated 5% of (G.2+H.2+I.2)
K.1 Total Unit Cost - As Submitted (G.1+H.1+I.1+J.1) 228,032.40
K.2 Total Unit Cost - As Evaluated (G.2+H.2+I.2+J.2)
CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING), BARANGAY KARAOS, SAN
FRANCISCO, AGUSAN DEL SUR
SAN FRANCISCO, AGUSAN DEL SUR
FORM POW-2015-01D-00

DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./ Description 1102(1) Panel Board with Main & Branch Breakers

Unit of Measurement: l.s


Output per Hour - As Submitted: 1.00 l.s/hour
Output per Hour - As Evaluated:

Designation No. of No. of Hrs. Hourly Rate Amount


Persons
A.1 Labor

Construction Foreman 1 135.00 103.63 13,990.05


Skilled Laborer 3 135.00 70.35 28,491.75
Unskilled Laborer 3 135.00 57.65 23,348.25

Sub - Total for A.1 - As Submitted 65,830.05


A.2 Labor

Sub - Total for A.2 - As Evaluated

Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment

Sub - Total for B.1 - As Submitted -


B.2 Equipment

Sub - Total for B.2 - As Evaluated


C.1 Total for (A.1 + B.1) - As Submitted 65,830.05
C.2 Total for (A.2 + B.2) - As Evaluated
D.1 Output per hour - As Submitted 1.00 l.s/hour
D.2 Output per hour - As Evaluated
E.1 Direct Unit Cost (C.1÷D.1) - As Submitted 65,830.05
E.2 Direct Unit Cost (C.2÷D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount
F.1 Materials

PANELBOARD WITH CENTER MAIN AND 6 BRANCHES, unit 1.00 36,500.00 36,500.00
BOLT-ON TYPE, 3 POLE -
MAIN: 300 AT, 250 V, 18 KAIC, 3 POLE MCCB pcs 1.00 30,000.00 30,000.00
BRANCHES: 150 AT, 225 AF, 250 V,10 KAIC, 3 POLE, MCCB pcs 2.00 10,000.00 20,000.00
60 AT, 100 AF,250 V,10 KAIC, 3 POLE, MCCB pcs 3.00 3,438.00 10,314.00

PANELBOARD WITH CENTER MAIN AND 10 BRANCHES,


unit 1.00 15,500.00 15,500.00
BOLT-ON TYPE, 3 POLE
MAIN: 60 AT, 250 V, 10 KAIC, 3 POLE MCCB pc 1.00 3,438.00 3,438.00
BRANCHES: 15 AT, 50 AF, 250 V,10 KAIC, 2 POLE, ACB pcs 3.00 500.00 1,500.00
20 AT, 50 AF,250 V,10 KAIC, 2 POLE, ACB pcs 2.00 500.00 1,000.00
30 AT, 50 AF,250 V,10 KAIC, 2 POLE, ACB pcs 5.00 500.00 2,500.00

PANELBOARD WITH CENTER MAIN AND 10 BRANCHES, unit 15,500.00 15,500.00


1.00
BOLT-ON TYPE, 3 POLE
MAIN: 60 AT, 250 V, 10 KAIC, 3 POLE MCCB pc 1.00 3,438.00 3,438.00
BRANCHES: 15 AT,50 AF, 250 V,10 KAIC, 2 POLE, ACB pcs 4.00 500.00 2,000.00
20 AT, 50 AF,250 V,10 KAIC, 2 POLE, ACB pcs 3.00 500.00 1,500.00
30 AT, 50 AF,250 V,10 KAIC, 2 POLE, ACB pcs 2.00 500.00 1,000.00
40 AT, 50 AF,250 V,10 KAIC, 2 POLE, ACB pcs 1.00 500.00 500.00

PANELBOARD WITH CENTER MAIN AND 20 BRANCHES, unit 1.00 20,000.00 20,000.00
BOLT-ON TYPE, 3 POLE
MAIN: 150 AT, 250 V, 10 KAIC, 3 POLE MCCB pc 1.00 10,000.00 10,000.00
BRANCHES: 15 AT,50 AF, 250 V,10 KAIC, 2 POLE, ACB pcs 5.00 500.00 2,500.00
20 AT, 50 AF,250 V,10 KAIC, 2 POLE, ACB pcs 9.00 500.00 4,500.00
30 AT, 50 AF,250 V,10 KAIC, 2 POLE, ACB pcs 6.00 500.00 3,000.00

PANELBOARD WITH CENTER MAIN AND 16 BRANCHES, unit 1.00 20,000.00 20,000.00
BOLT-ON TYPE, 3 POLE
MAIN: 150 AT, 250 V, 10 KAIC, 3 POLE MCCB pc 1.00 10,000.00 10,000.00
BRANCHES: 15 AT,50 AF, 250 V,10 KAIC, 2 POLE, ACB pcs 4.00 500.00 2,000.00
20 AT, 50 AF,250 V,10 KAIC, 2 POLE, ACB pcs 6.00 500.00 3,000.00
30 AT, 50 AF,250 V,10 KAIC, 2 POLE, ACB pcs 6.00 500.00 3,000.00

PANELBOARD WITH CENTER MAIN AND 8 BRANCHES,


unit 15,500.00 15,500.00
BOLT-ON TYPE, 3 POLE 1.00
MAIN: 60 AT, 250 V, 10 KAIC, 3 POLE MCCB pcs 1.00 1,500.00 1,500.00
BRANCHES: 15 AT,50 AF, 250 V,10 KAIC, 2 POLE, GFCI TYPE pcs 4.00 2,500.00 10,000.00
20 AT, 50 AF,250 V,10 KAIC, 2 POLE, GFCI TYPE pcs 1.00 2,500.00 2,500.00
30 AT, 50 AF,250 V,10 KAIC, 2 POLE, GFCI TYPE pc 1.00 2,500.00 2,500.00
30 AT, 50 AF,250 V,10 KAIC, 3 POLE, GFCI TYPE pc 1.00 3,000.00 3,000.00

Sub - Total for F.1 - As Submitted 257,690.00


F.2 Materials

Sub - Total for F.2 - As Evaluated


G.1 Direct Unit Cost (E.1+F.1) - As Submitted 323,520.05
G.2 Direct Unit Cost (E.2+F.2) - As Evaluated
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% of G.1 38,822.41
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% of G.2
I.1 Contractor's Profit (CP) - As Submitted 8% of G.1 25,881.60
I.2 Contractor's Profit (CP) - As Evaluated 8% of G.2
J.1 Value Added Tax (VAT) - As Submitted 5% of (G.1+H.1+I.1) 19,411.20
J.2 Value Added Tax (VAT) - As Evaluated 5% of (G.2+H.2+I.2)
K.1 Total Unit Cost - As Submitted (G.1+H.1+I.1+J.1) 407,635.26
K.2 Total Unit Cost - As Evaluated (G.2+H.2+I.2+J.2)
CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING), BARANGAY KARAOS, SAN FRANCISCO,
AGUSAN DEL SUR
SAN FRANCISCO, AGUSAN DEL SUR
FORM POW-2015-01D-00

DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./ Description 1102(10) Pole Mounted Distribution Transformer (OISC) with complete accessories, Pole Type

Unit of Measurement: l.s


Output per Hour - As Submitted: 1.00 l.s/hour
Output per Hour - As Evaluated:

No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor

Construction Foreman 1 180.00 103.63 18,653.40


Skilled Laborer 3 180.00 74.86 40,424.40
Unskilled Laborer 3 180.00 57.65 31,131.00

NOTE:
LABOR INCLUDES:
A. REMOVAL OF THE EXISTING 3 UNITS 75 KVA TRANSFORMERS
B. INSTALLATION OF 3 UNITS 167 KVA TRANSFORMERS
C. HANGING UP
D. BANKING OF THE SECONDARY SIDE
E. INSTALLATION AND TERMINATION OF 150 MM2 THHN CU. WIRE
FROM THE TRANSFORMER TO THE AUTOMATIC TRANSFER
SWITCH
F. TESTING/CALIBRATION

Sub - Total for A.1 - As Submitted 90,208.80


A.2 Labor

Sub - Total for A.2 - As Evaluated

Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment

Sub - Total for B.1 - As Submitted -


B.2 Equipment

Sub - Total for B.2 - As Evaluated


C.1 Total for (A.1 + B.1) - As Submitted 90,208.80
C.2 Total for (A.2 + B.2) - As Evaluated
D.1 Output per hour - As Submitted 1.00 l.s/hour
D.2 Output per hour - As Evaluated
E.1 Direct Unit Cost (C.1÷D.1) - As Submitted 90,208.80
E.2 Direct Unit Cost (C.2÷D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount
F.1 Materials

POLE MOUNTED DISTRIBUTION TRANSFORMER WITH


COMPLETE ACCESSORIES units 3.00 500,000.00 1,500,000.00
SPECIFICATION:
RATING: 167 KVA
PRIMARY VOLTAGE: 13.2/7.620 KV
SECONDARY VOLTAGE: 240/120 V
PHASE: 1

Current Transformer unit 3.00 58,000.00 174,000.00

Power Bill Deposit lot 1.00 1,051,348.39 1,051,348.39

Sub - Total for F.1 - As Submitted 2,725,348.39


F.2 Materials

Sub - Total for F.2 - As Evaluated


G.1 Direct Unit Cost (E.1+F.1) - As Submitted 2,815,557.19
G.2 Direct Unit Cost (E.2+F.2) - As Evaluated
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% of G.1 337,866.86
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% of G.2
I.1 Contractor's Profit (CP) - As Submitted 8% of G.1 225,244.58
I.2 Contractor's Profit (CP) - As Evaluated 8% of G.2
J.1 Value Added Tax (VAT) - As Submitted 5% of (G.1+H.1+I.1) 168,933.43
J.2 Value Added Tax (VAT) - As Evaluated 5% of (G.2+H.2+I.2)
K.1 Total Unit Cost - As Submitted (G.1+H.1+I.1+J.1) 3,547,602.06
K.2 Total Unit Cost - As Evaluated (G.2+H.2+I.2+J.2)

Prepared by: Checked by:

JAY MARK B. DUMDOM WILFRED R. VISAYA


Engineer II (EE) Chief, Planning and Design Section
Planning and Design Section
CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (AGUSAN DEL SUR 2ND DEO BUILDING), BARANGAY KARAOS,
SAN FRANCISCO, AGUSAN DEL SUR
SAN FRANCISCO, AGUSAN DEL SUR

FORM POW-2015-01D-00

DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./ Description : 1103(1) Lighting Fixtures

Unit of Measurement: l.s


Output per Hour - As Submitted: 1.00 l.s
Output per Hour - As Evaluated:

No. of
Designation Persons No. of Hrs. Hourly Rate Amount
A.1 Labor

Skilled Laborer 3 60.00 74.86 13,474.80


Unskilled Laborer 3 60.00 57.65 10,377.00

Sub - Total for A.1 - As Submitted 23,851.80


A.2 Labor

Sub - Total for A.2 - As Evaluated

Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment

Minor tools 10% of labor 2,385.18

Sub - Total for B.1 - As Submitted 2,385.18


B.2 Equipment

Sub - Total for B.2 - As Evaluated


C.1 Total for (A.1 + B.1) - As Submitted 26,236.98
C.2 Total for (A.2 + B.2) - As Evaluated
D.1 Output per hour - As Submitted 1 l.s
D.2 Output per hour - As Evaluated
E.1 Direct Unit Cost (C.1÷D.1) - As Submitted 26,236.98
E.2 Direct Unit Cost (C.2÷D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount
F.1 Materials

9 WATTS SQUARE DOWNLIGHT,LED BUILT-IN


RECESSED MOUNTED, 90-95 LUMENS PER sets 200.00 950.00 190,000.00
WATT, 85-265 V

6 WATTS SQUARE DOWNLIGHT,LED BUILT-IN


SURFACE MOUNTED, 90-95 LUMENS PER sets 30.00 700.00 21,000.00
WATT, 85-265 V

Sub - Total for F.1 - As Submitted 211,000.00


F.2 Materials

Sub - Total for F.2 - As Evaluated


G.1 Direct Unit Cost (E.1+F.1) - As Submitted 237,236.98
G.2 Direct Unit Cost (E.2+F.2) - As Evaluated
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% of G.1 28,468.44
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% of G.2
I.1 Contractor's Profit (CP) - As Submitted 8% of G.1 18,978.96
I.2 Contractor's Profit (CP) - As Evaluated 8% of G.2
J.1 Value Added Tax (VAT) - As Submitted 5% of (G.1+H.1+I.1) 14,234.22
J.2 Value Added Tax (VAT) - As Evaluated 5% of (G.2+H.2+I.2)
K.1 Total Unit Cost - As Submitted (G.1+H.1+I.1+J.1) 298,918.59
K.2 Total Unit Cost - As Evaluated (G.2+H.2+I.2+J.2)
CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (DEO BUILDING) PHASE 3, BARANGAY KARAOS, SAN FRANCISCO,
AGUSAN DEL SUR
SAN FRANCISCO, AGUSAN DEL SUR

FORM POW-2015-01D-00

DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./ Description : 1203(1)a Electric Elevator, up to 500 kg.

Unit of Measurement: l.s


Output per Hour - As Submitted: 1.00 l.s
Output per Hour - As Evaluated:

No. of
Designation Persons No. of Hrs. Hourly Rate Amount
A.1 Labor

Sub - Total for A.1 - As Submitted -


A.2 Labor

Sub - Total for A.2 - As Evaluated

Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment

Chain Block
Motor Hoist

Sub - Total for B.1 - As Submitted -


B.2 Equipment

Sub - Total for B.2 - As Evaluated


C.1 Total for (A.1 + B.1) - As Submitted -
C.2 Total for (A.2 + B.2) - As Evaluated
D.1 Output per hour - As Submitted 1 l.s
D.2 Output per hour - As Evaluated
E.1 Direct Unit Cost (C.1÷D.1) - As Submitted -
E.2 Direct Unit Cost (C.2÷D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount
F.1 Materials

Supply, Delivery, Installation & Commissioning :


Passenger Elevator, 450 kg. Capacity, 1.0m/s, 4
Floors/ 4 Stops, 4 Doors Simplex (5 persons) Side Asy 1.00 2,100,000.00 2,100,000.00
Counter Weight (Imported Equipment)
Features included:
• Automtaic Rescue Device
• 2-years Preventive Maintenances
• 2 years Equipment Warranty
• CCTV ready
• Transformer
• AVR - Automatic Voltage Regulator

**See attached Technical Specification

Sub - Total for F.1 - As Submitted 2,100,000.00


F.2 Materials

Sub - Total for F.2 - As Evaluated


G.1 Direct Unit Cost (E.1+F.1) - As Submitted 2,100,000.00
G.2 Direct Unit Cost (E.2+F.2) - As Evaluated
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% of G.1 252,000.00
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% of G.2
I.1 Contractor's Profit (CP) - As Submitted 8% of G.1 168,000.00
I.2 Contractor's Profit (CP) - As Evaluated 8% of G.2
J.1 Value Added Tax (VAT) - As Submitted 5% of (G.1+H.1+I.1) 126,000.00
J.2 Value Added Tax (VAT) - As Evaluated 5% of (G.2+H.2+I.2)
K.1 Total Unit Cost - As Submitted (G.1+H.1+I.1+J.1) 2,646,000.00
K.2 Total Unit Cost - As Evaluated (G.2+H.2+I.2+J.2)

Prepared by: Checked by:

IRISH B. AMADEO ELMELYN C. POLANCOS


Engineer II Acting Chief, Planning and Design Section
Planning and Design Section