Glass Partition Type
Glass Partition Type
PLUMBING
P1 -SPECIFICATION, PLUMBING LEGENDS, STRUCTURAL
SEPTIC TANK PLAN
P2 - GROUND FLOOR SANITARY LAYOUT PLAN,
SECOND FLOOR SANITARY LAYOUT PLAN
P3 - THIRD FLOOR SANITARY LAYOUT PLAN,
GROUND FLOOR WATER LAYOUT PLAN
P4 - SECOND FLOOR WATER LAYOUT PLAN,
THIRD FLOOR WATER LAYOUT PLAN
P5 - GROUND FLOOR SANITARY ISOMETRIC PLAN
SECOND FLOOR SANITARY ISOMETRIC PLAN SANITARY
P6 - THIRD FLOOR SANITARY ISOMETRIC PLAN
GROUND FLOOR WATER LINE ISOMETRIC PLAN
P7 - SECOND FLOOR WATER LINE ISOMETRIC PLAN,
THIRD FLOOR WATER LINE ISOMETRIC PLAN
ELECTRICAL
E1 - SINGLE LINE DIAGRAM
E2 - DESIGN ANALYSIS ELECTRICAL
E3 - SCHEDULE AND COMPUTATION OF LOADS,
RISER DIAGRAM, SPECIFICATION,
ELECTRICAL SYMBOLS
E4 - SCHEDULE AND COMPUTATION OF LOADS FOR MDP AND
DISTRIBUTION PANEL NO. 1, NO. 2 AND NO. 3
A5 - GROUND FLOOR LIGHTING LAYOUT PLAN,
SECOND FLOOR LIGHTING LAYOUT PLAN
A6 -THIRD FLOOR LIGHTING LAYOUT PLAN,
MECHANICAL
ROOF DECK LIGHTING LAYOUT PLAN
A7 - GROUND FLOOR CONVENIENCE OUTLET PLAN,
SECOND FLOOR CONVENIENCE OUTLET PLAN
A8 - THIRD FLOOR CONVENIENCE OUTLET PLAN,
ROOF DECK CONVENIENCE OUTLET PLAN
A9 - STAIRWAY LIGHTING LAYOUT PLAN
A10 - GROUND FLOOR AIR CONDITIONING LAYOUT PLAN,
SECOND FLOOR AIR CONDITIONING LAYOUT PLAN
A11 - THIRD FLOOR AIR CONDITIONING LAYOUT PLAN FIRE SAFETY
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
N
48.02
30
.3
DPWH 2
WAREHOUSE BUILDING
PROPERTY LINE
THIS SITE
VERDU FILI
New Tiniwisan
TAGLATAWAN
MAYGATASAN
HAMOGAWAY
TAG-ANAHAO
POBLACION
STA. TERESITA OSMEÑA
CAGBAS
Bantayan
KINAMAYBAY BAKINGKING
ESPERANZA BENTAHON
MAHAGKOT
GAMAO PANAYTAY
BALOBO REMEDIOS BATOHON SAN JOSE SAN LORENZO
AGSABU CHARITO SAN ISIDRO
CROSSING LUNA
HAWILIAN MABUHAY
STA IRINE
Little Bohol
Agsabo TAGABASE
PIGLAWIGAN STA MARIA
Malinawon DACUTAN New Davao SAN MARTIN
LIBERTAD
LA PERIAN
MARCELINA SAN SALVADOR SALIMBUGAON
NATO CATMONON
Kisay
Demar
MAUG AZPETIA
MILAGROS KATIPUNAN
SAN TORIBIO AWA
LOS ARCOS
CONCORDIA
Bulo
CIBULAN
STA. FE SAN JOAQUIN
AGUINALDO MAGSAYSAY
BUNAGUET Maligaya LABAO
CALABOAN
SALUG
TAHINA
OROMICA
DUANGAN
ODIONG
ANOLINGAN
PROSPERIDAD
POBLACION
Pusilao
ANISLAGAN
SAN JOSE MAPAGA
CECELIA
NAPO PATIN-AY BITAN - AGAN
TAGBALILI MALIWANAG
DIMASALANG SAN VICENTE
SAN VICENTE
PISAAN
LA CARIDAD Supon
SAN ISIDRO
MARITULA Estrella
Locahon HUBANG Mabuhay
STA. INES
Sta. Cruz Moreca
Cocton
Tuburan SAN RAFAEL TAGAPUA BARANGAY I
DOÑA MAXIMA
Burgos
Cebuena
BARANGAY III
STA. ANA
BARANGAY II
BARANGAY IV
BARANGAY V
ALEGRIA
CULI
STA. RITA
SAN FRANCISCO
MATL'S. LAB. BLDG. MAHAGSAY
BALIT
DOÑA FLAVIA
CULIRAM
San Miguel DEL MONTE
Mabini RIZAL
Baliwag
BORBON
Podlosan
Mahawan
LADGADAN
KARAOS
SAN ISIDRO
POBLACION
POLICARPO Taglikid
Consuelo
BATUCAN
Villa Hermosa Buhion Upper Baliwag
PASTA
MATI
MALIGAYA
Pamintigan
COALICION Patindog
QUARTER/
CAIMPUGAN Kinamasan
Kuliba-an
New Leyte Ignacio Kaagsaman
Batas
MABTAY
CONFERENCE RM.
MARBON LIBUAC
Cabugan
MAHAYAHAY
Buhisan ROSARIO Nyholm Guban
BUILDING
TAGBAYAGAN
DESAMPARADOS
Kisanga
MAHARLIKA Manlawigan
Tomowahong
STA. CRUZ
Valentina NOVELE CABAWAN
Catigbawan
Palibo
Padigusan
Kiago
Lahi
WASIAN
THIS SITE
Binitayan SABANG ADGAWAN
Leo
Larona Mong Soan
Asunsion
Libon
COMOTA
Gesok
OSMEÑA LA PAZ BAYUGAN III
Sinog-ang
Agpangon
Kagulo-an
Kiandag
Magbuya
HALAPITAN
LANGASIAN SAGUNTO
PANAGANGAN
Taytay Masapia
Panlabuhan
EXISTING BATAAN
Maitom
SAN MARCOS
Agnaya Singanan
Away
FOUNTAIN Motto
69.06
LABORATORY Valentina
VALENTINA
Guitas
Immaculada
MAGAUD
Batohon
Jandayugong
Tawilon KATIPUNAN Bong
MAMBALILI
Liboton
SAN ANDRES
Binahanan
VIOLANTA
TRANSFORMER
Maputi
New Visayas
MASAYAN TUDELA
Pudlasan BASA
Maasin
PAG - ASA
Mansungad Candavao Magading SAN ISIDRO
Pagatpatan CAIGANGAN
HOUSE Teon
Sta. Cruz SAN MARIANO SAN ISIDRO
Natividad
Lapu-Lapu
La Suerte
MAGSAYSAY
Dungga
Kawayan
San Roque
Gasa
Bian
Maymayan
Ilang - Ilang
Basag LA FORTUNA
Luzvimin
BINONGAN
Mahabu
Leo
Upper Lucad
TRENTO CEBOLEN
Tadasi
SAN ROQUE
PARKING
Limbasan Antonio TAPAZ Calman Bato Isdaon
D. O. CUEVAS
San Miguel SAWAGAN
La Tondena STA. MARIA
SAMPAGUITA
STO. NIÑO
Mampao Miguel
VERUELA
El Papa SAN JOSE
SABOD
PROPOSED Maguimon
Cab - Cab
Alpha Base
Yamaticon
KAUSWAGAN
Sto. Niño
Bagong Silang
El Mondo
Tambo Lower
Tagbuyawan Lower
Tagbuyawan
Tagbulete
Sta. Teresa
Onoman
Kandingan
NEW VISAYAS
PANGYAN
Rajah Kabungsuan
Tugpan
BUILDING
STA. CRUZ DEL MONTE SAYON
POBLACION
KATIPUNAN Cabunog
GAD
CONCEPCION
EXISTING Mabuhay
Nasangaban
Babuyan
SINOBONG Manipis
AWAO
ANGAS
Durian
PATROCENIO
Baclisi Divisoria
Mabaha
Condoyon ANITAP
Catalan
Guivara Mambuco
LIMOT
Kiduay
STA. EMELIA
Agsaway
Dao
Mabuhay
LANGKILAAN
MANGO TREE
GUARD'S
HOUSE
PWD
PARKING PARKING
PARKING
MOTOR PARKNG
PARKING
ENTRANCE
VICINITY MAP
PANAFLEX SIGNAGES
80.79
H I G H W A Y
N A T I O N A L
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
2.10
4.00 3.50 3.50 3.50 3.50
5.40
ROOM
6.50
6.50
6.70
6.90
PW PW
3 4
1.50
D-4 PW
12.90
W-7 D-5
12.90
5 5 6
2 1
2
1.20
1.00
JANITOR'S 2
D-4
1.20
RM. 3
1.20
PW
2.05
PWD 7
D-3 TOILET
2.20
2.20
ELEV. D-1 ELEV.
4.50
SURVEY
D-2 OFFICE SURVEY
6.40
2' EQUIPMENT
2'
6.00
ROOM D-1 OFFICE SPACE
101112131415161718 LOBBY PW PW 10 1112131415161718
1 2
W-3
PW
A W-1
3.00
3.20
8 WAITING
9
AREA
1.28
W-9 1.20
1.70
UP H A L L W A Y W-9 UP 1.20
8 7 6 5 4 3 2 1 3 2 1
9 8 7 6 5 4 3 2 1
0.30
0.30
3
0.15
W-8 B
W-8 W-1 W-1
1.20
W-9 B SURVEY W-1
RACEWAY W-9 RACEWAY
OFFICE
PROVIDE: 14MM MARINE PLYWOOD BOX TYPE SIDEWALL
STAIR SIDEWALL BLOCK (UP TO WINDOW BOTTOM LEVEL) 4.00 3.50 3.50 3.50 3.50
4.00 3.50 3.50 3.50 3.50
75MM X 44MM X 1.5MM STAINLESS PEBBLES #5 TOP FLOOR FINISHED 18.00
STEEL TUBULAR HANDRAIL
W/ 38MM X 25MM X 1.5MM STAINLESS PROVIDE: 14MM MARINE PLYWOOD BOX TYPE SIDEWALL
STEEL TUBULAR RAILINGS STAIR SIDEWALL BLOCK (UP TO WINDOW BOTTOM LEVEL)
A B C D E F A B C D E F
18.00 18.00
3.56
STIFFENER COLUMN: 0.15M X 0.30M
W/ 6-12MMØ MAIN BARS W/ 10MMØ
O F F I C E S P A C E TIES SPCD @ 0.15MOC
5.50
6.15
CHIEF OFFICE
6.90
water tank
(2000L)
10MM SQUARE BARS PRE-FAB.
D-2 TEMPORARY BLOCK GRILLS
2.00 (DESIGNED AS SHOWN) water tank
W-4A
(2000 L)
1.00
12.90
10
12.90
12.90
D-1
D-2
2
1.55
1.20
3.11
R O O F D E C K
2.20
2.20
ELEV. ELEV.
OFFICE SPACE D-2
PW
11
6.00
PRINTING ROOM
2'
6.00
101112131415161718 101112131415161718
D-2
W-1 DOWN
3.00
3.00
9 9
W-9 UP 1.20 1.20
8 7 6 5 4 3 2 1
0.30
0.30
8 7 6 5 4 3 2 1
18.00
0.10
STEEL TUBULAR RAILING
0.82 0.43
1.10
0.30
1.52 1.52
0.10 0.10
0.60
0.40
RC MOULD BLOCK AT
0.10 TOP WALL RAILING W-4A
2.90
2.80
2.80
0.10
0.57
1.30
1.13
1.18
0.50
0.45 0.70
ROOF DECK LINE
0.10
ROOF DECK LN.
0.10
0.42
F F F F F F F F F F F F
W-6
3.45
3.45
W-5 W-5
3.00
3.00
W-1 W-1 W-1
15.60
15.60
3RD F.F.L 3RD F.F.L
0.50
0.50
CEILING LINE CEILING LINE
W-9
7.80
W-9
F F F F F F F F F F F F
W-6
3.50
3.50
W-5 W-5
3.00
3.00
W-8 W-1 W-1 W-1
0.50
CEILING LINE CEILING LINE
0.25 0.10
0.50
2.52 0.38
0.10
0.50
4.10
4.10
F FW-2 F F F FW-2 F F W-3
2.60
0.25
0.50
2.50
FINISH FLOOR LINE FINISH FLOOR LINE
0.60
0.60
NATURAL GRADE LINE NATURAL GRADE LINE
25MM X 100MM RC PROTRUDING 25MM X 50MM STAINLESS
0.70 5.45
0.07 2.70 WALL ACCENT SMOOTH PLASTER 1.00 STEEL TUBULAR RAILINGS
PAINTED FINISH AS SHOWN 6.73 6.25
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
3 2' 2 1
1.75
0.82 0.42
HORIZONTAL SMOOTH PLASTERED
FINISH
2.80
1.75
W-4
1.30
ROOF DECK
FLR. LINE
0.10
CEILING LINE
W-4A
CEILING LINE
D-2 D-2
2.90
2.80
2.71
W-4 W-4
2.50
3.45
1.30
0.86
3.00
CEILING LINE
15.60
3RD F.F.L
7.41
0.50
3.45
CEILING LINE
3.00
W-1
71
0.
D-2
3.50
0.25
0.65
1.05
1.25
3.00
15.60
3RD F.F.L
0.50
1.
98
98
1.
(DESIGNED AS SHOWN)
3.50
CEILING LINE
3.00
W-1
W-6 W-6 D-2
W-4
4.10
W-2 W-2
3.74
3.74
2ND F.F.L
D-1
0.50
FINISH FLOOR LINE CEILING LINE
4.10
FINISH FLOOR LINE
1 REAR ELEVATION
A-6 SCALE 1:100 METERS 2 RIGHT-SIDE ELEVATION
A-6 SCALE 1:100 METERS
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
APEX LINE
4.55
1.00
ROOF DECK LINE 54
53
52
51
50
49
48
47
46
3.45
45
3.00
44
43
42
41
40
39
38
15.60
0.45
37
3RD F.F.L 36
0.50
35
34
33
CEILING LINE 31
32
30
29
28
3.50
27
3.00
26
25
24
23
22
21
20
2ND F.F.L 19
18
0.50
17
16
15
14
CEILING LINE 13
12
11
10
9
8
25MM X 75MM X 1.5MM STAINLESS STEEL
4.10
63MM X 63MM X 1.5MM STAINLESS STEEL SQUARE 3-25MM X 50MM X 1.5MM STAINLESS STEEL
TUBULAR POST W/ RAILING BASE; ACCY. RECTANGULAR TUBULAR HORIZONTAL RAILINGS
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
1.34
1.00
1.00
4.40
3RD FLOOR LINE
1.00
1.00
100MM X 200MM RC CANOPY W/ 10MM
8.80
Ø TEMPERATURE BARS SPACED @
1.02
0.20 MOC BOTHWAYS (WINDOW
CANOPY)
3.00 0.30 0.30 0.30 0.30 2ND FLOOR LINE
1.00
0.75 0.75 0.75 0.75 0.60
4.40
0.50 0.50 0.50 0.50
1.00
0.60 0.60 0.60
0.90
2.10
1.80
1.80
1.00
1.34
2.40
2.40
0.90
0.70
0.41 0.41 0.41
0.60
0.60
0.60
FINISH FLOOR LINE
0.93
DESIGNATION W-1 (SEAMLESS TYPE) DESIGNATION W-4 (SEAMLESS TYPE) DESIGNATION W-8 (SEAMLESS TYPE)
DESCRIPTION AWNING/FIXED WINDOW DESCRIPTION AWNING WINDOW DESCRIPTION FIXED/AWNING WINDOW
MATERIAL FINISH 6MM THK. GLASS MATERIAL FINISH 6MM THK. DESIGNATION W-4A (SEAMLESS TYPE) MATERIAL FINISH 6MM [Link]
NO. OF SETS: 15 SETS REFLECTIVE GLASS DESCRIPTION AWNING WINDOW NO. OF SETS: 1 SET
LOCATION: OFFICE SPACE, ARCHIVE ROOM, NO. OF SETS: 1 SET MATERIAL FINISH 6MM THK. LOCATION: STAIR
CONFERENCE ROOM LOCATION: CHIEF OFFICE REFLECTIVE GLASS MAIN ALUMINUM FRAME SIZE:
NO. OF SETS: 1 SET 50MM X 100MM
NOTE: ALL WINDOW USE REFLECTIVE GLASS LOCATION: ROOF DECK
1 SCHEDULE OF WINDOWS
A-8 SCALE 1:100 METERS
0.12 2.70
0.90
HIDDEN FRAME
0.10 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.10
0.05
0.63 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.63
3.10
0.40
9.70
2.50
2.10
2.10
2ND FLOOR LINE
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
2.27
2.37
2.37
2.37
2.70
2.70
2.80
2.80
2.80
0.43
0.43
0.43
0.43
0.43
FINISH FLOOR LINE
SECOND FLOOR
FINISH FLOOR LINE
DESIGNATION PW-1 DESIGNATION PW-2 DESIGNATION PW-3 DESIGNATION PW-4 DESIGNATION PW-5
DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL
MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link]
NO. OF SETS: 1 SET NO. OF SETS: 1 SET NO. OF SETS: 1 SET NO. OF SETS: 1 SET NO. OF SETS: 1 SET
LOCATION: SURVEY OFFICE LOCATION: SURVEY OFFICE LOCATION: CONFERENCE ROOM LOCATION: ARCHIVE ROOM LOCATION: OFFICE SPACE
MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM
3.95 5.60
3.20
2.80 2.80
1.98 1.98
3.02
1.26 1.23 0.95 0.95 0.95 0.95 1.00 1.10 1.10
1.46 1.36 1.36 1.36 1.36
0.05 1.46 0.05
0.70
2.35
2.35
2.35
2.37
2.37
2.37
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
D2
2.10
0.45
0.45
0.45
0.43
0.43
0.43
SECOND FLOOR THIRD FLOOR
FINISH FLOOR LINE FINISH FLOOR LINE
DESIGNATION PW-6 DESIGNATION PW-7 DESIGNATION PW-8 DESIGNATION PW-9 DESIGNATION PW-10 DESIGNATION PW-11
DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL DESCRIPTION GLASS PARTITION WALL
MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link] MATERIAL FINISH 12MM [Link]
NO. OF SETS: 2 SETS NO. OF SETS: 1 SET NO. OF SETS: 1 SET NO. OF SETS: 1 SET NO. OF SETS: 1 SET NO. OF SETS: 2 SETS
LOCATION: OFFICE SPACE LOCATION: OFFICE SPACE LOCATION: OFFICE SPACE LOCATION: CHIEFT OFFICE LOCATION: PRINTING ROOM LOCATION: PRINTING ROOM
MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM MAIN ALUMINUM FRAMESIZE:50MM X 100MM
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
0.77
0.97
1 SSG 1
100MM X 100MM X 3.18MM(81")
SQUARE STAINLESS STEEL POST
CHB PLANT BOX @
WATER DRAIN SLOPE DIRECTION 0.20MTS HIGH
(2% FLOOR SLAB SLOPE)
6.15
6.15
6.90
6.90
6.70
SSG
1.00
SSG
SSG
SSG
SSG
12.90
12.90
12.90
12.90
RF
RF
RF
RF
2 2
1.55
1.55
SSG
0.75
1.30
2.85
2.20
2.20
2.55
ELEV. ELEV.
RF-3
1.05
2' 2'
6.00
6.00
25MM X 25MM X 2.0MM ALUMINUM BOX
FOR ALUMINUM CLADDING PANEL
3.00
3.00
FRAME-JOISTS SPCD @ 0.40 MOC BW
3.45
1.00
RF-1
RF-1
RF-4
RF-2
3 3
0.25
SHRUBS/PLANTS
GREEN GRASS 2.43 2.43 2.43 3.50 3.50 3.50
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
A B C D E F A B C D E F
uPVC CEILING PANEL (180MM X 8MM X 3MTS.)
W/ END CAP MOULDING PRE-PAINTED LONGSPAN ROOFING
SHEET (0.427MM)-TRIWAVE TYPE
11.41
11.41
3.50
1 1
2.33
2.57
1.31
8.42
8.42
6.90
6.90
7.70
SLOPE
12.90
12.90
12.90
12.90
3.50 2.30 3.50 2.30
2 2
1.30
1.30
NON-SLIP uNGLAZED FLOOR TILES
2.20
2.20
ELEV. ELEV. (600MM X 600MM)
2' 2'
6.00
6.00
SHRUB
SLOPE PLANTS
4.50
4.50
3.00
3 3
0.25
GREEN GRASS
(LANDSCAPE)
7.90 3.50 3.50 7.90 3.50 3.50
ALUMINUM CLADDING PANEL (ACP) ROOFING AND ALUMINUM CLADDING PANEL (ACP) ROOFING AND
CEILING AREA COVERING AS SHOWN W/ ALUMINUM CEILING AREA COVERING AS SHOWN W/ ALUMINUM
BOX FRAME-JOISTS FOR FASTENING/ANCHORAGE BOX FRAME-JOISTS FOR FASTENING/ANCHORAGE
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
0.975
0.785
0.220
0.10 0.315
0.225
0.075
0.40 0.135
0.1
0.4
0
0.435 0.435
0.1
0.87
0.78
5
0.4
0.1
1.4
0.25
0
2
1.61
SIX(6) SPACES EQUAL BAY
0.78
5 RC BEAM
0.4
0.29 0.22
3.50
0.435
0.51
1.4
0.25
2
250MM X 435MM X 12MM THK
0.78
0.10
BOLTS ANCHORED/EMBED TO 2
RC WALL W/ N&W
1.61
0.435 1.4
2
0.135
0.35 0.16 0.71 0.71 0.71
0.20
TYPICAL ELEVATION
25MM X 50MM X 2MM STAINLESS STEEL
50MM X 50MM X 3MM STAINLESS STEEL
ANGLE BARS LADDER STAIR FRAME W/
TYPICAL SIDE SECTION
RECTANGULAR TUBULAR GRAB/STEP AND 50MM X 3MM STAINLESS STEEL FLAT BAR
SIDE LADDER SUPPORT/BRACE STEPS FLOORING (5 PCS PER STEP)
0.130
0.60
0.35
0.60
FLOOR PLAN
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
8.44
PRE-PAINTED GI SHEET
SIDE FLASHING (GA. 24)
50MM X 75MM X 1.5MM GI
C-PURLINS SPCD @ 0.60MOC
FULL WELD
0.50
0.30
0.10
0.30
SSG
2.80
100MM X 100MM X 3.18MM(81") SQUARE STAINLESS STEEL POST W/ N&W ON 0.20M X 0.20M X 10MM
THK STAINLESS STEEL PLATE
FULL WELD
FIN FLR LN
RC SLAB
ELEVATION/SECTION
0.05
0.05 0.05
0.10
C
2 ROOF DECK TRUSS SECTION 100MM X 100MM X 3.18MM(81")
L
A-4 NOT
0.05
TO SCALE SQUARE STAINLESS STEEL
POST
FULL WELD
FULL WELD
PRE-PAINTED GI SHEET 4-12MMØ X 100MM
25MM X 25MM X 1.2MM STEEL
SIDE FLASHING (GA. 24) ANCHOR BOLTS W/ N&W
0.05
ANGULAR BAR FASCIA FRAME
ON 0.20M X 0.20M X 10MM
THK STEEL PLATE
0.25
0.10
100MM X 100MM X 3.18MM(81")
0.05
SQUARE STAINLESS STEEL
0.60 0.60 0.60 0.60 0.60 POST
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
0.10
CEILING AREA COVERING AS SHOWN W/ ALUMINUM
0.475
BOX FRAME-JOISTS FOR FASTENING/ANCHORAGE
EQUAL BAY
6.09
SPACE
SIX(6)
0.95
0.95
1.30
1.20
1.10
A
0.475
25
1. 6
1.1
C
0.15
0.94
0.15
9
1.0
0.10
0.78
FIN FLR LN FIN FLR LN
C
0.10
0.10
0.10
0.64
0.49
0.34
0.05
1.04 75MM X 44MM X 1.5MM STAINLESS STEEL
0.07
B TUBULAR BRACES/SUPPORT EMBED AND
WELD TO BARS FOR ANCHORAGE
1.00 1.00 1.00 1.00
0.14
3.44
STEEL ANGLE BAR
B - 50MM X 50MM X 6MM
STEEL ANGLE BAR A
0.57
C - 50MM X 50MM X 6MM C
0.41
STEEL ANGLE BAR
0.27
150MM X 400MM STIFFENER COLUMN/POST
0.07
(SCP) W/ 4-25MMØ REINF. BARS W/ 10MMØ
TIE BARS SPCD @ 150MM OC B
1.00 1.00
A B C D E F 3.00 0.40
18.00
4.65
0.27
A
0.27
C
0.27
6.15
6.90
0.27
SCP B
0.07
water tank 0.40
3.46
(2000L)
EXTEND RC COLUMN TO 1.40
1.20MTS. FROM FIN. FLR. LINE
12.90
12.90
(THIS POST ONLY)
water tank
2 RF-2 DETAIL
1.55
(2000 L)
2.20
ELEV.
2.70
2'
6.00
11121314151617
A
3.00
25
1. 6
1.1
0.94
10 9 8 7 6 5
1.20
C C
73
0.78
0.
0.64
0.30
3 RAILINGS RAILINGS
0.56
B
RACEWAY 3.50
4.00 3.50 3.50 3.50 B
1.00 1.00 0.55
2.55
2 CANOPY ROOF POST LOCATION (ROOF DECK)
A-3 SCALE 1:100 METERS RF-3 DETAIL
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
BG 900(8K) 56
WALL +FINISHED
795
665
( MIN. 200mm )
180 240
CAR INSIDE 1100
120
56 BG 1200(8K) 56
590
705
56
25
115
()
CLEAR OPENING
150 700 150
CONCRETE OPENING
300 1000 400
800 900
+
EL:
2.25
700
CAPACITY 450 KG (6 PERSONS)
300
SPEED 60 / 90 / 105 M/MIN
TYPE VVVF (WBSS)
OPERATION 1 CAR - 2 BC
700
SERVICE FLOORS ( ) FL / ( ) ST
( ) MM
1350
CAR INTERNAL SIZE 1100(W) X 1100(D)
DOOR OPENING SIZE 700(W) X 2100(H)
DOOR OPENING TYPE 2 PANEL CENTER OPENING 700
MAIN ROPE Ø6 X ( ) WIRES (2 : 1)
MOTOR CAPACITY
AC ( ) KW
(KW)
MAIN 3PH ( ) V ( ) HZ
POWER SUPPLY FINISHED FLOOR CONCRETE OPENING
LIGHT 1PH ( ) V ( ) HZ
BY OTHERS 1000
1 ELEVATOR DETAIL
S-5 SCALE 1:100 METERS
DRAFTED:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
75 KVA TRANSFORMER :
120/240 V, 3 PHASE, 1.6 % Z
2
77.408 FEET- 150 MM COPPER
NON- MAGNETIC CONDUIT
3 SINGLE CONDUCTORS
1 PER PHASE
300 A MCCB
30 AT ECB
2
43 FEET- 5.5 MM COPPER
NON- MAGNETIC CONDUIT
3 SINGLE CONDUCTORS
MOTOR CONTRIBUTION
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
BUILDING LINE
MAIN FEEDER LENGTH = 80 ft
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
SPECIFICATION :
SWITCH PLATE (1 GANG)
TWO SINGLE POLE WALL SWITCH ON ONE
SERVICE ENTRANCE
SWITCH PLATE (2 GANG)
THREE SINGLE POLE WALL SWITCH ON
EARTH GROUNDING
ONE SWITCH PLATE (3 GANG)
KILOWATT - HOUR METER THREE- WAY SWITCH
5. ALL ELECTRICAL MATERIALS AND EQUIPMENT SHALL BE NEW AND OF THE PULL BOX (6" X 6" X 4")
USE 1- 2" Ø RSC OR RIGID PVC
APPROVED TYPE BY THE PHILIPPINE STANDARD AGENCY FOR THE SPECIFIC PB 2
CONDUCTORS: 5 SETS OF 2- 2.0 mm THHN COPPER + 1-2.0 mm TW COPPER (G)
BUILDING LINE
CONDUCTORS: 1 SET OF 3- 38 mm THHN COPPER + 1-14 mm TW COPPER (G)
PULL BOX (18" X 12" X 6") PB
CHANGES, AND/ OR ALTERATIONS IN THE FIELD SHALL BE AFFIRMED BY THE PULL BOX (18" X 12" X 6") PB MDP
1800mm
SIGNING PROFESSIONAL ELECTRICAL ENGINEER.
GROUND FLOOR LEVEL
9. ALL ELECTRICAL WORKS SHALL BE DONE IN A WORKMANLIKE MANNER AND FINISHED GRADE LEVEL
USE 1- 22 mm2 TW COPPER GROUND WIRE IN 1" Ø RIGID PVC
SHALL BE UNDER SUPERVISION OF A DULY LICENSED ELECTRICAL ENGINEER.
USE 1- 3" Ø RSC OR RIGID PVC
CONDUCTORS: 3- 150 mm THHN COPPER + 1-22 mm TW COPPER (G)
5/8" X 10 ' COPPER CLAD GROUNDING ELECTRODE
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
NOTE:
FC PEC [Link](MOUNTING SUPPORT)
SERVICE CABLES SHALL BE SUPPORTED
BY STRAPS OR OTHER APPROVED MEANS WITHIN
300 MM OF EVERY SERVICE HEAD, GOOSENECK OR
CONNECTION TO A RACEWAY OR ENCLOSURE AND
AT INTERVALS OF NOT EXCEEDING 750 MM
3" DIA. SERVICE ENTRANCE CAP, RAINTIGHT 3" DIA. SERVICE ENTRANCE CAP, RAINTIGHT 3" DIA. SERVICE ENTRANCE CAP, RAINTIGHT 3" DIA. SERVICE ENTRANCE CAP, RAINTIGHT
1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER
CONDUCTOR CONDUCTOR CONDUCTOR CONDUCTOR
CT/PT
1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER
CONDUCTOR CONDUCTOR
300 mm
CONDUCTOR CONDUCTOR
1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER 1 - 150 MM2 THHN COPPER
CONDUCTOR CONDUCTOR CONDUCTOR CONDUCTOR
1 1 1 1
2" X 4" 2" X 4" 2" X 4" 2" X 4"
1 EXPANSION EXPANSION
2" X 4" EXPANSION BOLT EXPANSION EXPANSION
BOLT BOLT BOLT BOLT
SURGE 3" RIGID STEEL CONDUIT 3" RIGID STEEL CONDUIT 3" RIGID STEEL CONDUIT 750 mm
ARRESTER
FC
1 1 1 1
2" X 4" 2" X 4" 2" X 4" 2" X 4"
1 EXPANSION EXPANSION
2" X 4" EXPANSION BOLT EXPANSION EXPANSION
BOLT BOLT BOLT BOLT
4" RIGID STEEL CONDUIT 4" RIGID STEEL CONDUIT 3" RIGID STEEL CONDUIT 750 mm
3 x 167 KVA
PRIMARY VOLTAGE:13.2/7.620 X'MER
4"X 4" X 6MM GALVANIZED Z BAR 3100 mm
SECONDARY VOLTAGE:240/120
BANK
1 1 1 1
USE 4 SETS OF 3-150 mm2 THHN COPPER WIRE IN A 3" X 3 M RSC (SEE SERVICE ENTRANCE DETAIL) 2" X 4" 2" X 4" 2" X 4" 2" X 4"
1 EXPANSION EXPANSION
2" X 4" EXPANSION BOLT EXPANSION EXPANSION
BOLT BOLT BOLT BOLT
800 AT 3P
3" RIGID STEEL CONDUIT 750 mm
MDP FOR SUBSTATION (EXISTING)
USE 4 SETS OF 3-150 mm2 THHN COPPER WIRE IN A 3" X 3 M RSC (SEE SERVICE ENTRANCE DETAIL)
500 KVA STANDBY EMERGENCY DIESEL GENERATOR (EXISTING) 4"X 4" X 6MM GALVANIZED Z BAR
USE 3 SETS OF 2- 250 mm2 THHN COPPER WIRE+ 1-100 mm2 TW COPPER GROUND WIRE
1250 AT ATS mm2 COPPER
3P 100 MM2 COPPER EQUIP. EQUIP. 1 1 1 1
GROUNDING 2" X 4" 2" X 4" 2" X 4" 2" X 4"
GROUNDING CONDUCTOR 1
2" X 4" EXPANSION BOLT EXPANSION EXPANSION EXPANSION EXPANSION
CONDUCTOR BOLT BOLT BOLT BOLT
MDP 3" RIGID STEEL CONDUIT
550 mm
3" DIA. CONDUIT BODY, 3" DIA. CONDUIT BODY, 3" DIA. CONDUIT BODY, 3" DIA. CONDUIT BODY,
TYPE LB, THREADED TYPE LB, THREADED TYPE LB, THREADED TYPE LB, THREADED
FIRST FLOOR THIRD FLOOR MACHINE ROOM FOURTH FLOOR SECOND FLOOR
NOT TO SCALE
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
22 mm2 BCW
DETAIL A
DYNASPHERE
INLINE COUPLING
ALUMINUM MAST
CLAMP
GROUNDING ROD
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SCHEDULE AND COMPUTATION OF LOADS FOR
OFFICE OF THE DISTRICT ENGINEER DISTRIBUTION PANEL NO. 2 (DP-2) AND CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION DISTRIBUTION PANEL NO. 3 (DP-3)
IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 22
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
7 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
3.03
3.03
1.32
6W 6W 6W 6W 6W
a b c d e
5.24
3.03
2.29
6W 6W 6W 6W 6W
9.66 a b c d
D R I V E W A Y
9.95
6W 6W 6W 6W 6W
a b c d e
6W 6W 6W 6W 6W
a b c d e
18.60
18.60
9W
1.44
9W 6W 6W
d e e 9W
a
9W
b
9W
c
9W 9W
e
C4
Sabc Sde DP-1 9W 9W 9W 9W
9W 9W a b c e
3.17
9W
a a
d C2
6.49
DP-1 9W 9W 9W 9W 9W
a b c d e
3S3way Sabc 9W 9W 9W 9W 9W
9W 9W
Sde a b c d e
S1 b b
9W
4.32
9W 9W 9W 9W 9W 9W 9W
c c a b a b a
"DP-1" C3
MDP PB DP-1
30.85
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
9W 9W 9W 9W 9W 9W 9W
9W 9W
d d d d d d d
d d
9W 9W 9W 9W 9W 9W
9W 9W
c c c c c c c
9.59
c c 9W 9W 9W 9W 9W 9W 9W
11.55
11.55
b b b b b b b
9W 9W
9W 9W 9W 9W 9W 9W 9W
b b
a a C2 C3 a a a a a
Sab DP-2 DP-2
9W 9W Scd
Sab Scd Sab Scd
a a S3way S3way
9W 9W 9W 9W 9W 9W
2.67
C5
22.92
9W 9W
S PB-2
9W S
2.13
9W d d
C6 9W 9W 9W 9W 9W
DP-2 9W 9W
C4 a a a a a
c c DP-2
3.91
ELEV. 9W
9W 9W 9W 9W 9W
9W 9W b b b b b
11.37
10.66
b b 9W 9W 9W 9W 9W
c c c c c
9W 9W 9W
C7
9W 9W 9W 9W 9W
5.33
DP-2
a a
3 way switches are located on d d d d
1st & 4th floor (see stairway "DP-2"
lighting lay out plan)
SabScd Sab Scd
31.98
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SECOND FLOOR LIGHTING LAYOUT PLAN
OFFICE OF THE DISTRICT ENGINEER CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 25
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
10 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE:
28.38
9W 9W 9W 9W 9W 9W
a a b b c c
9W 9W 9W
c c c
9W 9W 9W 9W 9W 9W
a a b b c c
8.67
9W 9W 9W 9W 9W 9W 9W 9W 9W
10.88
b b b a a b b c c
Sabc
9W 9W 9W 9W 9W 9W
9W 9W 9W a a b b c c
a a a
C1
DP-3 9W 9W 9W 9W 9W 9W
a a b b c c
1.58
20.34
20.34
Sdef 9W 9W 9W
9W 9W
a b c
1.89
9W 9W Sab 9W 9W 9W 9W 9W
S Scd
a a a a a b c
9W C5 C4
DP-3 DP-3
3.47
9W 9W 9W 9W 9W 9W 9W
b b b b a b c
9.46
9W 9W 9W 9W 9W 9W 9W
c c c c a b c
9W C7
9W 9W 9W 9W 9W 9W 9W
4.73
DP-2
d d d d a b c
3 way switches are located on C3
1st & 4th floor (see stairway "DP-3" DP-3
lighting lay out plan) PB
SabScd
11.82 16.55
28.38
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
9W 9W 9W 9W 9W
b b b c c
HVAC
10.91
9W 9W 9W 9W 9W
b b b c c
12.24
9W 9W 9W 9W 9W
b b b c c
water tank
(2000L)
9W 9W 9W 9W 9W
22.88
22.88
b b b c c
water tank
2.75
(2000 L)
9W 9W
a a
3.90
ELEV.
9W
a
10.64
9W 9W
9W
C2 3S3way Sabc
a
5.32
DP-4 9W 9W C1
DP-4
up
"DP-4"
PB
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
3.20
3.20
10.23
10.53
19.69
19.69
WP
WP
1.53
2 2
5.34
2
2
C7
DP-1
3.36
6.87
2 C5
DP-1
LOBBY 3.99
C6 2 3.99
DP-1
4.58
2 2 2
32.66
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
2 2 2 2
C9 SPO
DP-2
2 2 2 2 2
C11
DP-2
9.80
11.80
11.80
2 4.29
2 2 2 2 2
C8 C10 4.30 C12
DP-2 DP-2 DP-2
2 2 2 2
2.72
6.35
23.41
2.99
2
2 2 2 2
2.18
2 2 2
3.27
2.67
2
C13
2 2 2 2 2
DP-2 C14 FO FO FO FO FO
3.99
DP-2
1.70
11.62
10.89
3.27 2.47
2 2 2 2
C15 FO FO FO
5.44
DP-2
2.36
2
C16
DP-2 "DP-2" FO
2 FO
2 FO
2 FO
2
1.28
PB
2 2 2
32.67
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
2 2 2 2 2
C7 2.30 4.41
DP-3
2.53
FO 2 C8 FO
2 FO
2 C10 FO
2 FO
2 FO
2
2
DP-3 DP-3 3.45
2
3.19
2
C6
9.73
DP-3
12.21
FO
2 FO
2 FO
2 FO
2 FO
2
4.42
2
2 2 2 2 2
C9
FO FO FO FO FO
DP-3
1.77
2.81
22.83
22.83
2
2.12
1.96
2.07 2 2 2
C11 FO FO FO
DP-3
3.89
2 2 2 2 O F F I C E 2
S P A C E
CONFERENCE
10.62
3.54
2 ROOM 2 2 2
C13 FO FO FO
DP-3 1.97
2 2 2 2 2
C12
5.31
DP-3
3.45
FO
2 FO
2 FO
2
1.92
"DP-3"
PB
2 2 2
13.27 18.58
31.86
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
2 2 2 2
C4
DP-4
10.99
12.33
2
23.05
23.05
R O O F D E C K
2.77
3.93
10.72
2
C5
DP-4
5.36
"DP-4"
PB
2 2 2
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
9W 9W 9W
6 W SQUARE
DOWNLIGHT, 85 V
5.62
STIFFENER C1
COLUMN DP-5
5.62
ELEVATOR
CONTROL PANEL
"DP-5"
PB
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ELEVATOR MACHINE ROOM LIGHTING LAYOUT
OFFICE OF THE DISTRICT ENGINEER STAIRWAY LIGHTING LAY OUT PLAN CHARMINE B. OCITE
ENGINEERING ASSISTANT
CARAGA REGION IMPROVEMENT OF DEO BUILDING
PREPARED:
LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA E 32
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
JAY MARK B. DUMDOM
ENGINEER II/ASST. CHIEF,
PLANNING AND DESIGN SECTION
ACTING CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 17 19 34
KARAOS, SAN FRANCISCO, AGUSAN DEL SUR LOCATION: BRGY. KARAOS, SAN FRANCISCO , ADS ENGINEER II (EE) DATE: DATE: DATE:
21.40
18.00
2.10
2.10
4.00 3.50 3.50 3.50 3.50
C17
PB-2 ACCU OUTLET
IN NEMA 3R ENCLOSURE
C18
5.40
PB-2 ACCU OUTLET
IN NEMA 3R ENCLOSURE
6.50
6.50
6.70
6.90
C19
PB-2 ACCU OUTLET
IN NEMA 3R ENCLOSURE
1.50
12.90
12.90
12.90
1.20
1.00
C20
PB-2
2.20
2.20
ACCU OUTLET
IN NEMA 3R ENCLOSURE
4.50
1.12
6.40
C21
6.00
PB-2 ACCU OUTLET
IN NEMA 3R ENCLOSURE
1.11
C22
3.00
3.00
PB-2 ACCU OUTLET
IN NEMA 3R ENCLOSURE
4.00 3.50 3.50 3.50 3.50 3.40 4.00 3.50 3.50 3.50 3.50
21.40 18.00
1 GROUND FLOOR AIRCONDITIONING UNIT LAY OUT 2 SECOND FLOOR AIRCONDITIONING UNIT LAY OUT
E-9 NOT TO SCALE E-9 NOT TO SCALE
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
C14
PB-3
8.45
10.60
C15
PB-3
C16
PB-3
1.54
19.81
19.81
1.84
C17
PB-3
3.38
C18
PB-3
9.21
C19
PB-3
4.61
"DP-3"
PB
11.52 16.12
27.64
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
FORM POW-2015-01D-00
No. of
Designation Persons No. of Hrs Hourly Rate Amount
A.1 Labor
Name and Capacity No. of Units No. of Hrs Hourly Rate Amount
B.1 Equipment
PPE
Helmet (Hard Hats) man-day 666.67 0.68 453.33
Safety Gloves man-day 1,333.33 3.67 4,893.33
FORM POW-2015-01D-00
No. of
Designation Persons No. of Hrs Hourly Rate Amount
A.1 Labor
No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
Mobile Foldable partition wall (Full Panel, 1mx 1.8m height) length 5.200 9,500.00 49,400.00
Including Accessories
(Pulley assembly/Self Mounted)
Consumables 3% of Materials 1,482.00
Ground Floor
Survey Room:
Sofa (3 Seaters) pc 2.000 28,500.00 57,000.00
Clerical Chair pc 1.00 5,500.00 5,500.00
Multi-Purpose Table (L= 1.50m) pc 3.00 6,500.00 19,500.00
Sub-Total 82,000.00
2nd Floor
Kitchen:
Dining Table (12 Seaters with Chairs) set 1.00 45,000.00 45,000.00
Conference Room:
Conference Table (W:300x D120 x H: 75cm) pc 1.00 51,350.00 51,350.00
Conference Chair (Sled Type) pc 12.00 5,500.00 66,000.00
Sub-Total 117,350.00
Workstation 1:
P120120LG (Half glass/ half laminated) pc 1.00 12,035.00 12,035.00
P12090LG (Half glass/ half laminated) pc 1.00 10,005.00 10,005.00
P12060LG (Half glass/ half laminated) pc 2.00 7,938.75 15,877.50
P12030LG (Half glass/ half laminated) pc 1.00 7,938.75 7,938.75
PC-126A (Table top) pc 1.00 4,205.00 4,205.00
PC3-90A (Table top) pc 1.00 2,755.00 2,755.00
Clerical Chair pc 1.00 5,500.00 5,500.00
Mobile Pedestal pc 1.00 5,500.00 5,500.00
Total per WS1 x
12.00 personnel 765,795.00
Lounge Area:
Sofa (3 Seaters) pc 2.00 28,500.00 57,000.00
3rd Floor
Office of the Section Chief:
Executive Table (W:160cm x D:90cm x H:75cm) pc 1.00 35,400.00 35,400.00
Executive Chair (Cow Leather), Color: Black pc 1.00 18,500.00 18,500.00
Executive Guest Chair pc 2.00 7,500.00 15,000.00
Sofa (3 Seaters), Color: Black pc 3.00 28,500.00 85,500.00
Center Table pc 1.00 13,500.00 13,500.00
Sub-Total 167,900.00
Workstation 1:
P120120LG (Half glass/ half laminated) pc 1.00 12,035.00 12,035.00
P12090LG (Half glass/ half laminated) pc 1.00 10,005.00 10,005.00
P12060LG (Half glass/ half laminated) pc 2.00 7,938.75 15,877.50
P12030LG (Half glass/ half laminated) pc 1.00 7,938.75 7,938.75
PC-126A (Table top) pc 1.00 4,205.00 4,205.00
PC3-90A (Table top) pc 1.00 2,755.00 2,755.00
Clerical Chair pc 1.00 5,500.00 5,500.00
Mobile Pedestal pc 1.00 5,500.00 5,500.00
Total per WS1 x
24.00 personnel 1,531,590.00
Lounge Area:
Sofa (3 Seaters) pc 3.00 28,500.00 85,500.00
Printing Room:
P120120LG (Half glass/ half laminated) pc 1.00 12,035.00 12,035.00
P12090LG (Half glass/ half laminated) pc 1.00 10,005.00 10,005.00
P12060LG (Half glass/ half laminated) pc 2.00 7,938.75 15,877.50
P12030LG (Half glass/ half laminated) pc 1.00 7,938.75 7,938.75
PC-126A (Table top) pc 1.00 4,205.00 4,205.00
PC3-90A (Table top) pc 1.00 2,755.00 2,755.00
Clerical Chair pc 1.00 5,500.00 5,500.00
Mobile Pedestal pc 1.00 5,500.00 5,500.00
Total per WS1 x
1.00 personnel 63,816.25
No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
FORM POW-2015-01D-00
No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor
Fabrication
Construction Foreman 1 19.50 103.63 2,021.24
Skilled Laborer 1 19.50 74.86 1,460.10
Unskilled Laborer 2 19.50 57.65 2,248.86
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
Item No./ Description 1100(10) Conduits, Boxes & Fittings (Conduit Works/Conduit Rough-in)
No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
FORM POW-2015-01D-00
No. of
Designation Persons No. of Hrs. Hourly Rate Amount
A.1 Labor
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
5/8" X 10' COPPER CLAD GROUNDING ROD lengths 2.00 770.00 1,540.00
SINGLE POLE WALL SWITCH IN ONE SWITCH PLATE pcs 10.00 84.00 840.00
TWO SINGLE POLE WALL SWITCH IN ONE SWITCH PLATE pcs 20.00 138.00 2,760.00
THREE SINGLE POLE WALL SWITCH IN ONE SWITCH PLATE pcs 12.00 335.00 4,020.00
THREE WAY SWITCH IN ONE SWITCH PLATE pcs 8.00 160.00 1,280.00
SPECIAL PURPOSE OUTLET pcs 1.00 495.00 495.00
DUPLEX CONVENIENCE OUTLET (FLUSH TYPE) pcs 104.00 205.75 21,398.00
FLOOR OUTLET, POP-UP TYPE sets 41.00 2,190.00 89,790.00
RUBBER TAPE rolls 3.00 120.00 360.00
ELECTRICAL TAPE rolls 89.00 48.00 4,272.00
Item No./ Description 1102(1) Panel Board with Main & Branch Breakers
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
PANELBOARD WITH CENTER MAIN AND 6 BRANCHES, unit 1.00 36,500.00 36,500.00
BOLT-ON TYPE, 3 POLE -
MAIN: 300 AT, 250 V, 18 KAIC, 3 POLE MCCB pcs 1.00 30,000.00 30,000.00
BRANCHES: 150 AT, 225 AF, 250 V,10 KAIC, 3 POLE, MCCB pcs 2.00 10,000.00 20,000.00
60 AT, 100 AF,250 V,10 KAIC, 3 POLE, MCCB pcs 3.00 3,438.00 10,314.00
PANELBOARD WITH CENTER MAIN AND 20 BRANCHES, unit 1.00 20,000.00 20,000.00
BOLT-ON TYPE, 3 POLE
MAIN: 150 AT, 250 V, 10 KAIC, 3 POLE MCCB pc 1.00 10,000.00 10,000.00
BRANCHES: 15 AT,50 AF, 250 V,10 KAIC, 2 POLE, ACB pcs 5.00 500.00 2,500.00
20 AT, 50 AF,250 V,10 KAIC, 2 POLE, ACB pcs 9.00 500.00 4,500.00
30 AT, 50 AF,250 V,10 KAIC, 2 POLE, ACB pcs 6.00 500.00 3,000.00
PANELBOARD WITH CENTER MAIN AND 16 BRANCHES, unit 1.00 20,000.00 20,000.00
BOLT-ON TYPE, 3 POLE
MAIN: 150 AT, 250 V, 10 KAIC, 3 POLE MCCB pc 1.00 10,000.00 10,000.00
BRANCHES: 15 AT,50 AF, 250 V,10 KAIC, 2 POLE, ACB pcs 4.00 500.00 2,000.00
20 AT, 50 AF,250 V,10 KAIC, 2 POLE, ACB pcs 6.00 500.00 3,000.00
30 AT, 50 AF,250 V,10 KAIC, 2 POLE, ACB pcs 6.00 500.00 3,000.00
Item No./ Description 1102(10) Pole Mounted Distribution Transformer (OISC) with complete accessories, Pole Type
No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor
NOTE:
LABOR INCLUDES:
A. REMOVAL OF THE EXISTING 3 UNITS 75 KVA TRANSFORMERS
B. INSTALLATION OF 3 UNITS 167 KVA TRANSFORMERS
C. HANGING UP
D. BANKING OF THE SECONDARY SIDE
E. INSTALLATION AND TERMINATION OF 150 MM2 THHN CU. WIRE
FROM THE TRANSFORMER TO THE AUTOMATIC TRANSFER
SWITCH
F. TESTING/CALIBRATION
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
FORM POW-2015-01D-00
No. of
Designation Persons No. of Hrs. Hourly Rate Amount
A.1 Labor
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
FORM POW-2015-01D-00
No. of
Designation Persons No. of Hrs. Hourly Rate Amount
A.1 Labor
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
Chain Block
Motor Hoist