0% found this document useful (0 votes)
540 views2 pages

ATDA Form

Uploaded by

Kylie Wong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
540 views2 pages

ATDA Form

Uploaded by

Kylie Wong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

(PWD 142B - Rev.

2015)

JABATAN KERJA RAYA


AS TENDERED DETAILED ABSTRACT FOR Total Amt. of Main Tender : RM

Contractor for Main Works Class

G4

Head Sub/Head Year Total Prov. Closing Date of Tender Tender Valid Until

Prov. for Construction


COMPETITIVE TENDER LIST
Contract Period: Tender No Tender Sum Tender No Tender Sum
Type of Contract: Lowerst
Form of Contract: 8/27
Basis of Tender: 15/27
No. of Tenders Received: 19/27
22/27
BRIEF DESCRIPTION OF BUILDINGS
BUILDING Frame Wall Roof Floor Ceiling Window Standard
a
b
c
d
e
f

PRIME COST AND PROVISIONAL SUMS


ITEM ALLOWED RM ACTUAL RM
a
b
c

BREAKDOWN OF COST COST RM


1 PRELIMINARIES Being #DIV/0! % of Remainder of Main Tender
2 PILING/SPECIAL FOUNDATION 0.00
Unit Quantity Unit Cost
Type and Size

3 BUILDING 0.00 Drawing No. Floor Area m2 Cost/m2 Vol.m3* Cost/m3*


a

SUBTOTAL 0.00
Carried forward
BREAKDOWN OF COST (CONT'D) COST (RM)
SUBTOTAL brought forward
4 INTERNAL SERVICES * 0.00 Building Cost % of
Served /m2 Bldg.
[Link]. Flr. Area served RM Cost
a
b

5 EXTERNAL WORKS 0.00 Appropriate Unit Quantity Unit Cost


a
b
c
d
e
f
g
h
j
k
m

6 PROVISIONAL SUM 0.00


a

9 TOTAL COST 0.00 ALL IN UNIT RATE (of Total Items 1 to 9)


10 CONTRIBUTION FEE TO LOCAL & - Total Floor Area m2 Cost/m2: #DIV/0!
UTILITY AUTHORITY Quantity Surveyor/Superintending Officer's Representative
a
b

Juruukur Bahan Penguasa


JKR Johor Date:
11 MISCELLANEOUS (inclusive GST) 0.00
a
b Superintending Officer/State Director of Works

TOTAL (Items 1 to 10) 0.00 Date:


12 SUPERVISION -
13 PROFESSIONAL FEES (Inclusive GST) -
Portfolio Branch Director of Works

Date:
TOTAL COST OF PROJECT 0.00

You might also like