PILE CAP FOUNDATION DESIGN (BASED ON ACI 318M‐11 CODE)
Max & Min Axial Pile Reaction
PILE LOADING DATA MATERIAL Include Pile Weight = Yes
Pile Dimension Foundation Load from Support Reaction (Applied on top of pedestal) Concrete P/[Link] [Link] [Link]
LC
Pile Shape = Circle F1 F2 F3 M1 M2 Concrete Grade = K300 kN kN kN
Dp (Pile Diameter) = 400.00 mm LC Fx Fy Fz Mx My Soil Condition fc' = 24.90 MPa COMB 1 129.53 283.16 11.11
Lp (Effective Pile Length) = 5.00 m kN kN kN kN.m kN.m Bott Concrete Cover = 75.00 mm COMB 2 129.53 283.16 11.11
COMB 1 100.00 ‐50.00 1,000.00 10.00 50.00 Not Submerged Top Concrete Cover = 75.00 mm COMB 3 129.53 283.16 11.11
Pile Arrangement COMB 2 100.00 ‐50.00 1,000.00 10.00 50.00 Not Submerged Side Concrete Cover = 75.00 mm COMB 4 129.53 283.16 11.11
m (x dir) = 5.00 COMB 3 100.00 ‐50.00 1,000.00 10.00 50.00 Not Submerged Rebar COMB 5 129.53 283.16 11.11
n (y dir) = 3.00 COMB 4 100.00 ‐50.00 1,000.00 10.00 50.00 Not Submerged Rebar Grade = BJTD 40 COMB 6 129.53 283.16 11.11
[Link] (Pile Quantity) = 15.00 NOS COMB 5 100.00 ‐50.00 1,000.00 10.00 50.00 Not Submerged fy = 390.00 MPa COMB 7 129.53 283.16 11.11
[Link] = 0.63 m3/pile COMB 6 100.00 ‐50.00 1,000.00 10.00 50.00 Not Submerged Dia Rebar (Db) = D‐22 mm COMB 8 129.53 283.16 11.11
[Link] = 9.42 m3 COMB 7 100.00 ‐50.00 1,000.00 10.00 50.00 Not Submerged COMB 9 129.53 283.16 11.11
COMB 8 100.00 ‐50.00 1,000.00 10.00 50.00 Not Submerged Strength Reduction Factor COMB 10 129.53 283.16 11.11
Center to Center Pile Spacing COMB 9 100.00 ‐50.00 1,000.00 10.00 50.00 Not Submerged Øb (for bending) = 0.80 MAX & MIN = 283.165 11.111
sx (x‐dir) = 3.00 x Dp COMB 10 100.00 ‐50.00 1,000.00 10.00 50.00 Not Submerged Øv (for shear) = 0.75
1,200.00 mm MAX (kN) = 100.00 ‐50.00 1,000.00 10.00 50.00 Max Shear Force on Each Pile
sy (y‐dir) = 3.00 x Dp MIN (kN) = 100.00 ‐50.00 1,000.00 10.00 50.00 Custom Input [Link] = 7.45 kN/Pile
1,200.00 mm Dp = 325.00 mm
Load Factor fc' = 23.00 MPa Pile Cap Reinforcement
Center Pile to Edge of Pile Cap Distance ψ= 1.60 => For Loading Data fy = 400.00 MPa Round Number Down For Rebar Spacing = 5 mm
[Link] = 385.00 mm ψ.sw = 1.60 => For Self Weight of Foundation Db = 13.00 mm [Link] = Standard Formula CHECK
Ed.x = 1.50 x Dp LC Left Side (X‐) Right Side (X+) Top Side (Y+) Bottom Side (Y‐)
600.00 mm Bottom Bottom Top Bottom
4000
Ed.y = 1.50 x Dp Y+ Top View of Foundation COMB 1 8,876 mm2 7,200 mm2 15,000 mm2 15,000 mm2 OK!
600.00 mm (Top Side) D22 ‐ 140 mm D22 ‐ 180 mm D22 ‐ 145 mm D22 ‐ 145 mm
Bottom Bottom Top Bottom
Effect of Piling Position Tolerance Pile Cap COMB 2 OK!
8,876 mm2 7,200 mm2 15,000 mm2 15,000 mm2
Consider = No 3000 D22 ‐ 140 mm D22 ‐ 180 mm D22 ‐ 145 mm D22 ‐ 145 mm
Tolerance = 75.00 mm Bottom Pedestal Bottom Bottom Top Bottom
COMB 3 8,876 mm2 7,200 mm2 15,000 mm2 15,000 mm2 OK!
Pile Group Efficiency Top Pedestal D22 ‐ 140 mm D22 ‐ 180 mm D22 ‐ 145 mm D22 ‐ 145 mm
For Axial Capacity Bottom Bottom Top Bottom
2000
d = (Pile Spacing) = AVERAGE Two Way Shear Critical Line COMB 4 8,876 mm2 7,200 mm2 15,000 mm2 15,000 mm2 OK!
1,200.00 mm D22 ‐ 140 mm D22 ‐ 180 mm D22 ‐ 145 mm D22 ‐ 145 mm
Equation = Converse‐Labarre Bottom Bottom Top Bottom
One Way Shear Critical Line
Eg = 0.70 COMB 5 8,876 mm2 7,200 mm2 15,000 mm2 15,000 mm2 OK!
For Lateral Capacity (Broms) 1000 D22 ‐ 140 mm D22 ‐ 180 mm D22 ‐ 145 mm D22 ‐ 145 mm
On x direction = 0.40 Bottom Bottom Top Bottom
On y direction = 0.40 X‐ X+ COMB 6 8,876 mm2 7,200 mm2 15,000 mm2 15,000 mm2 OK!
(Left Side) (Right Side) D22 ‐ 140 mm D22 ‐ 180 mm D22 ‐ 145 mm D22 ‐ 145 mm
0 Bottom Bottom Top Bottom
Unit Weight of Material ‐4000 ‐3000 ‐2000 ‐1000 0 1000 2000 3000 4000 COMB 7 8,876 mm2 7,200 mm2 15,000 mm2 15,000 mm2 OK!
[Link] = 10.00 kN/m3 D22 ‐ 140 mm D22 ‐ 180 mm D22 ‐ 145 mm D22 ‐ 145 mm
Not Submerged Condition Bottom Bottom Top Bottom
[Link] = 18.00 kN/m3 COMB 8 8,876 mm2 7,200 mm2 15,000 mm2 15,000 mm2 OK!
‐1000
[Link] = 24.00 kN/m3 D22 ‐ 140 mm D22 ‐ 180 mm D22 ‐ 145 mm D22 ‐ 145 mm
Submerged Condition Bottom Bottom Top Bottom
[Link].s = 8.00 kN/m3 COMB 9 8,876 mm2 7,200 mm2 15,000 mm2 15,000 mm2 OK!
[Link].s = 14.00 kN/m3 D22 ‐ 140 mm D22 ‐ 180 mm D22 ‐ 145 mm D22 ‐ 145 mm
‐2000 Bottom Bottom Top Bottom
COMB 10 8,876 mm2 7,200 mm2 15,000 mm2 15,000 mm2 OK!
PILE CAP D22 ‐ 140 mm D22 ‐ 180 mm D22 ‐ 145 mm D22 ‐ 145 mm
Pile Cap Dimension Shrinkage Reinforcement along x direction = D22 ‐ 180 mm OK!
[Link] (x‐dir) = 6,000 mm Shrinkage Reinforcement along y direction = D22 ‐ 180 mm OK!
‐3000
[Link] (y‐dir) = 3,600 mm
[Link] (Thickness of Pile Cap) = 1,000.00 mm
Reinforcement Top Pile Cap Reinforcement Bottom Pile Cap Reinforcement
[Link] = 21.60 m3
Y‐ Summary
Portion of Reinforcement Factor (Ƴs) x dir y dir x dir y dir
(Bottom Side)
β= 1.67 ‐4000 Spacing = ‐ D22 ‐ 145 mm D22 ‐ 140 mm D22 ‐ 145 mm
ɣs = 2 / (β + 1) = 0.75 Qty = ‐ 40‐D22 19‐D22 40‐D22
As (mm2) = ‐ 15,205.31 7,222.52 15,205.31
Depth & Total Height of Foundation
SOIL ABOVE PILE CAP Df = 1,500.00 mm One Way Shear Force ([Link])
Soil Thickness & Volume [Link] = 2,000.00 mm LC Left Side (X‐) Right Side (X+) Top Side (Y+) Bottom Side (Y‐)
[Link] = 500.00 mm Df = Depth of Foundation kN kN kN kN
[Link] = 10.72 m^3 [Link] = Total height of Foundation COMB 1 1,028.99 687.23 0.00 733.47
COMB 2 1,028.99 687.23 0.00 733.47
COMB 3 1,028.99 687.23 0.00 733.47
ADD LATERAL RESISTANCE PEDESTAL COLUMN COMB 4 1,028.99 687.23 0.00 733.47
DUE TO PASSIVE / AT‐REST SOIL PRESSURE Pedestal Dimension Pedestal Eccentricity COMB 5 1,028.99 687.23 0.00 733.47
Ø (soil friction angle) = 28.00 Deg [Link] (x‐dir) = 400.00 mm [Link] = 1,200.00 mm COMB 6 1,028.99 687.23 0.00 733.47
c (soil cohesion) = 5.00 kN/m2 [Link] (y‐dir) = 400.00 mm [Link] = 1,200.00 mm COMB 7 1,028.99 687.23 0.00 733.47
Soil condition = Not Submerged [Link] = 1,000.00 mm Pedestal Slope COMB 8 1,028.99 687.23 0.00 733.47
LATERAL RESISTANCE [Link] = 1,414.21 mm X dir = ‐45.00 Deg COMB 9 1,028.99 687.23 0.00 733.47
SF For Active Pressure = 2.00 [Link] = 0.23 m3 Y dir = 0.00 Deg COMB 10 1,028.99 687.23 0.00 733.47
SF For Passive Pressure = 2.00
SF For At‐Rest Pressure = 2.00 Ø[Link] [Link] Max
Two Way Shear Stress Check Traditional Punching Shear Check Ows Position Check
Soil Pressure Resistance = Active & Passive kN kN
Vrx (x‐dir) = 199.18 kN Øσv.n = 1.25 0.00 Column Position = Interior Left Side (X‐) 2,002.98 1,028.99 OK!
Vry (y‐dir) = 120.67 kN => Only valid for Interior Column only Ø[Link] = 4,210.71 kN Right Side (X+) 2,002.98 687.23 OK!
σ[Link] σ[Link] [Link] Top Side (Y+) 3,338.30 0.00 OK!
LC SR Check LC SR Check
MPa MPa kN Bottom Side (Y‐) 3,338.30 733.47 OK!
UPLIFT RESISTANCE COMB 1 0.612 0.086 0.49 OK! COMB 1 1,719.45 0.41 OK!
UPLIFT RESISTANCE COMB 2 0.612 0.086 0.49 OK! COMB 2 1,719.45 0.41 OK! TRADITIONAL ONE‐WAY AND TWO‐WAY SHEAR PROVISIONS AT PILES
Soil condition = Submerged COMB 3 0.612 0.086 0.49 OK! COMB 3 1,719.45 0.41 OK! ØVn Vu
Limit State SR Check
SF For Self Weight = 2.00 COMB 4 0.612 0.086 0.49 OK! COMB 4 1,719.45 0.41 OK! kN kN
SF For Friction = 2.00 COMB 5 0.612 0.086 0.49 OK! COMB 5 1,719.45 0.41 OK! P1 4,516.66 428.94 0.09 OK!
Self Weight Resistance = 261.64 kN COMB 6 0.612 0.086 0.49 OK! COMB 6 1,719.45 0.41 OK! P2 5,851.98 826.55 0.14 OK!
Friction Resistance = 96.37 kN COMB 7 0.612 0.086 0.49 OK! COMB 7 1,719.45 0.41 OK! P3 2,464.49 428.94 0.17 OK!
Total Uplift Resistance = 358.01 kN COMB 8 0.612 0.086 0.49 OK! COMB 8 1,719.45 0.41 OK! P4 1,533.98 428.94 0.28 OK!
COMB 9 0.612 0.086 0.49 OK! COMB 9 1,719.45 0.41 OK!
*) SF = Safety Factor COMB 10 0.612 0.086 0.49 OK! COMB 10 1,719.45 0.41 OK! P1 = Two Way Shear at Pile Limit State
Max = 0.612 0.086 0.49 Max = 1719.446 0.41 P2 = Two Way Shear at Two Adjacent Pile Limit State
Created by: P3 = Two Way Shear at Corner Pile Limit State
Civil Studio *) SR = Strength Ratio P4 = One Way Shear at Corner Pile Limit State
Email: [Link]@[Link]
Version 1.0 (2020)