Building Construction Inspection Plan

1. The document outlines an inspection and test plan for various construction processes including incoming/outgoing materials, setting out, piling, excavation/backfilling, and reinforced concrete structure. 2. It lists items to be checked, characteristics/conditions, frequency of inspection, applicable standards/specifications, and testing methods for each process. 3. Inspections include checking quantities, quality, arrangement of materials; boundary pegs, control points, and orientation for setting out; pile position, hammering, welding, penetration for piling; excavation levels and materials for excavation/backfilling.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
321 views4 pages

Building Construction Inspection Plan

1. The document outlines an inspection and test plan for various construction processes including incoming/outgoing materials, setting out, piling, excavation/backfilling, and reinforced concrete structure. 2. It lists items to be checked, characteristics/conditions, frequency of inspection, applicable standards/specifications, and testing methods for each process. 3. Inspections include checking quantities, quality, arrangement of materials; boundary pegs, control points, and orientation for setting out; pile position, hammering, welding, penetration for piling; excavation levels and materials for excavation/backfilling.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
  • Excavation (Back Fill & Earthwork): Describes the excavation processes including backfill, with a focus on safety and testing requirements.
  • Setting Out: Describes procedures for setting out including checks for coordinates and tests before construction begins.
  • Incoming/Outgoing Materials: Covers the inspection and testing process for incoming and outgoing materials including responsibilities and test methods.
  • Piling: Outlines the inspection methods and responsibilities in piling operations, detailing tests for alignment and depth.
  • Common Brickwork: Lists quality and positioning checks for common brickwork, including inspection and specification reviews.
  • RC Structure: Details checks and tests for reinforced concrete structures, focusing on compliance and structural integrity.
  • External Work: Defines the parameter checks for external works, including mortar mixing and durability testing.
  • Wall Plastering: Describes quality control methods for wall plastering, focusing on thickness and adherence.
  • Wall Skimcoat: Details the checks for applying skimcoat onto walls, ensuring smooth finishes and compliance with standards.

INSPECTION AND TEST PLAN Rev.

: 0
Page : 1 of 4

Standards / Testing
Things To Be Checks Characteristics /
Process Responsibility Frequency Specification / Method / Remark
Checked Conditions
Reference Equipment

Incoming / Project Manager / 1. All Goods 1. Quantity & Type As Per Every Delivery. 1. Drawings / 1. Visual; PO & DO
Outgoing Received; DO; Specification / 2. Calculatio
Material Civil Engineer / 2. Storing/ 2. Quality - Approved As BQ. n;
Site Supervisor Stacking. Accordance To Sample 2. PO / COA. 3. Measuring
Or Specification, Clean, Tape.
Tidy & Rigidity;
3. Arrangement - Safe,
Traceable & Working
Distance.

Setting Out Project Manager / 1. Boundary Peg.; 1. Level; Every Block, 1. Licensed 1. Theodolite
2. Control Point / 2. Coordinate Point; Every Floor. Surveyor. ;
Civil Engineer / Profile Board. 3. Orientation. 2. Dumpy
Site Supervisor Level;
3. Measuring
Tape;
4. Plumb
Bub.

Piling Project Manager / 1. Pile Point; 1. Pile Position & Pitching; Every Pile Point 1. Drawings- 1. Visual &
2. Machine; 2. Hammer & Verticality; Or As Per Foundation Counting;
Civil Engineer / 3. Join; 3. Welding Thickness / Engineer’s Layout & Pile 2. Spirit
Site Supervisor 4. Pile Set; Sizes Of Sleeve; Instruction. Group Detail. Level
5. Load Testing. 4. Penetration per No. Of Rule;
Blows; 3. Pressure
5. Correct Load Test Gauge,
Equipment Testing; Ruler &
6. Correct Calibration Dumpy
Requirement As Per Level;
Proposal. 4. Measuring
Tape.

Excavation Project Manager / 1. Excavated / 1. To Require Reduce Every Unit. 1. Dumpy


1. Drawings;
/ Back Back Filled Level; Level &
2. Specifications.
Filling Civil Engineer / Level; 2. Correct Material; Staff.
Site Supervisor 3. Shoring / Slopes /
Gradient;
INSPECTION AND TEST PLAN Rev.: 0
Page : 2 of 4

RC Project Manager / 1. Setting Out; 1. Control Point As Per Before / After 1. Measuring
1. Contract
Structure 2. Formwork; Construction Drawings; Casting. Tape;
Specification;
Civil Engineer / 3. Reinforcement; 2. Surface Of Formwork & 2. Water
2. Drawings. Pre-
Site Supervisor 4. M&E Services; Apply Mould Oil (For Ply Spirit
Arrange
5. Concrete Wood); Level;
With COW
Placing; 3. Dimensions, Level & 3. Plum Bulb;
For Joint
6. Dismantling Verticality; 4. Visualizing
Inspection.
Formwork; 4. Joints Tight; &
7. Cube Testing. 5. Stability, Rigidity & Counting;
Cleanliness; 5. Slump;
6. Grade, Size, Nos. Of 6. Cube
Bar, Spacing & Lapping; Mould;
7. Concrete Cover / 7. Lab
Spacer; Testing.
8. Clean;
9. Piping / Wiring Are
Installed Accordingly;
10. Services Opening Size;
11. Concrete Sources &
Suitability-Grade,
Slump, Time Limit (Btw.
Batching & Placing);
12. Vibration Poker (Enough
Vibration);
13. Proper Curing;
14. No Damage To
Concrete;
15. Achieve Required
Strength.

Common Project Manager / 1 Setting Out; 1. Correct Position & Every Unit. 1. Sprit Level
1. Specification;
Brickwork / 2 Quality Of Alignment; / Plumb;
2. Drawings.
Block Work Civil Engineer / Material 2. Appropriate Cement 2. Measuring
Site Supervisor Preparation; Mortar Mixing Ratio As Tape.
3 Quality Of Per Contract;
Craftsmanship. 3. Type Of Bonding /
Jointing, Reinforcement
(Exmet @4 Course,
INSPECTION AND TEST PLAN Rev.: 0
Page : 3 of 4

Dowel Bars, Stiffener &


Lintel) & dpc;.
4. Verticality.

Wall Project Manager / 1. Quality of 1. At Least 3 Days After 1. Before 1. Long


1. Specification;
Plastering Craftsmanship. Completion Of Wall; Commencing Ruler.
2. Drawings.
Civil Engineer / 2. All Concealed Piping & Work;
Site Supervisor Wiring Are Installed; 2. Every Unit.
3. Cement Mortar Mixing
Ratio As Per Contract
Specification;
4. Applying First & Finishing
Coat Technique;
5. Thickness;
6. Surface Leveling & Towel
To Evenness;
7. Plastering Joint If Area
Too Substantial;
8. Groove Line.
1. Specification;
Wall Project Manager / 1. Quality of 1. At least 1 Days after 1. Before 1. Long
2. Drawings
Skimcoat Craftsmanship Completion Work; Commencing Ruler.
Civil Engineer / . Work;
2. Conner Bead are place
Site Supervisor
align to structure 2. Every Unit.
(beam/column) ;
3. Skim coat mixing ratio as
per Method of statement;
4. Thickness;
5. Surface Leveling &
smooth surface.

External Project Manager / 1. Parameter 1. Cement Mortar Mixing Every Unit. 1. Specification; Nil DE-QC-IT-
Work Drain & Apron. Ratio; 2. Shop Drawing; F15_Perim
Civil Engineer / 2. Chain Link 2. Gradient / Lay To Fall; 3. Detail eter Drain
Site Supervisor Fencing. 3. Approved PC Drain; Drawing; And Apron
4. Level; 4. Architect’s Inspection
5. Approved Fencing - Type, Approved Form
Size & Color; Sample.
6. Approved Gate;
7. Stanchion Size As Per
INSPECTION AND TEST PLAN Rev.: 0
Page : 4 of 4

Drawing & Depth Below


The Earth;
8. Angle Bracing;
9. Welding.

Prepared By: Reviewed & Approved By:

Name: TS Chin (QMR) Name: Ir. Lew Choon Keong


Date: 05 / 05 / 2016 Date: 05 / 05 / 2016

INSPECTION AND TEST PLAN 
Rev.: 0
Page : 1 of 4
Process
Responsibility
Things To Be
Checked
Checks Characteristics /
Conditio
INSPECTION AND TEST PLAN 
Rev.: 0
Page : 2 of 4
RC
Structure
Project Manager /
Civil Engineer / 
Site Supervisor
1. Setting O
INSPECTION AND TEST PLAN 
Rev.: 0
Page : 3 of 4
Dowel  Bars,  Stiffener  &
Lintel) & dpc;.
4. Verticality.
Wall
Plastering
Pr
INSPECTION AND TEST PLAN 
Rev.: 0
Page : 4 of 4
Drawing  &  Depth  Below
The Earth;
8. Angle Bracing;
9. Welding.
Prepared By