0% found this document useful (0 votes)
58 views2 pages

Substation Equipment Maintenance Schedule

This document contains maintenance records and schedules for PLCC/DTPC equipment. It includes: 1. A form to record yearly and half-yearly maintenance activities including general cleaning, fan and port checks. 2. A table listing periodic tests to transmit and receive protection codes and measure signal levels. 3. A form for SOS maintenance tests covering power supplies, transmitters, receivers and alarms with fields to record measurement locations. It provides guidance for routine preventive maintenance of PLCC systems to ensure proper functioning.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views2 pages

Substation Equipment Maintenance Schedule

This document contains maintenance records and schedules for PLCC/DTPC equipment. It includes: 1. A form to record yearly and half-yearly maintenance activities including general cleaning, fan and port checks. 2. A table listing periodic tests to transmit and receive protection codes and measure signal levels. 3. A form for SOS maintenance tests covering power supplies, transmitters, receivers and alarms with fields to record measurement locations. It provides guidance for routine preventive maintenance of PLCC systems to ensure proper functioning.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

1

PLCC/DTPC EQUIPMENT MAINTENANCE RECORD


Sub-Station:
Dt. Of Commissioning..................... Make/Model.......................... Cab. Sl. No
Name of Line/Direction.................................
YEARLY/ HALF YEARLY MAINTENANCE - PTW No. ………….. Date:……………….
(a) General Cleaning of Cabinets (06 monthly).
(b) Checking of healthiness of Ventilation Fans in Cabinet (06 monthly).
(c) DTPC: Port Healthiness to be checked (06 monthly).
(e) DTPC : Interface with ULDC Panel to be checked (06 monthly).
(f) Level Measurements

Periodicity SPEECH/
PROTECTION PROTECTION
SR. TEST POINTS (T.P.) WHERE
MAINTENANCE ACTIVITY -I -II
No. MESUREMENTS TO BE DONE Tx.........Rx....
. Tx.........Rx..... Tx.........Rx.....
1 TRANSMISSION OF PROTN. CODE Yearly (S/D)
CODE I
CODE II
CODE III
2 RECEIPT OF PROTN. CODE Yearly(S/D)
CODE I
CODE II
CODE III
3 Coaxial level measurement Tx / Rx (pilot & 06 monthly
protection) (NON S/D)
4 LOOP TEST 06 monthly
(NON S/D)

Sign. of Maintenance Engineer Approval of Substation In-charge

Format No: SS/MAIN/PLCC

Preventive Maintenance Schedule & Formats for Substation Equipments DOC: D-3-02-XX-01-09
2

PLCC EQUIPMENT MAINTENANCE RECORD

SOS MAINTENANCE

SR. TEST POINTS (T.P.) WHERE SPEECH PROTECTION-I PROTECTION-II


No. MAINTENANCE ACTIVITY
MESUREMENTS TO BE DONE Tx.........Rx..... Tx.........Rx..... Tx.........Rx.....
1.0 POWER SUPPLY MEASUREMENTS
1.1 INPUT VOLTAGES
1.2 STABILISED DC VOLTAGES
2.0 TRANSMITTER CHECKS
2.1 FM OSCILLATOR- Frequency measurement
2.2 AM OSCILLATOR- Time measurement
2.3 OUTPUT LEVEL MEASUREMENT
3.0 RECEIVER CHECKS
3.1 Receiver level FM
3.2 Receiver level AM
4.0 ALARM CHECKS
4.1 Check Alarm Contacts with Buzzer/ Ohm meter
after inserting test plug ”IN POSITION”

RETURN LOSS MEASUREMENTS (SOS ACTIVITY) (As per commissioning format)

Note: This is only a guide line. The format to be modified as per actual PLCC system available at site.

Sign. of Maintenance Engineer Approval of Substation In-charge

Format No: SS/MAIN/PLCC/SOS

Preventive Maintenance Schedule & Formats for Substation Equipments DOC: D-3-02-XX-01-09

You might also like