0% found this document useful (0 votes)
161 views3 pages

Concrete Volume and Cost Breakdown

The document provides a bill of quantities for cement concrete work. It includes the materials needed, quantities, unit rates, and total costs. The materials include 6.34 bags of Portland cement, 0.88 cubic meters of aggregate including 0.55 cubic meters of stone aggregate 40mm, 0.22 cubic meters of stone aggregate 20mm, and 0.11 cubic meters of stone aggregate 10mm. Labor, equipment hire, and transportation costs are also provided, along with the contractor's profit. The total cost for the cement concrete work is ₹5834.84.

Uploaded by

Sanjeev Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
161 views3 pages

Concrete Volume and Cost Breakdown

The document provides a bill of quantities for cement concrete work. It includes the materials needed, quantities, unit rates, and total costs. The materials include 6.34 bags of Portland cement, 0.88 cubic meters of aggregate including 0.55 cubic meters of stone aggregate 40mm, 0.22 cubic meters of stone aggregate 20mm, and 0.11 cubic meters of stone aggregate 10mm. Labor, equipment hire, and transportation costs are also provided, along with the contractor's profit. The total cost for the cement concrete work is ₹5834.84.

Uploaded by

Sanjeev Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Providing and laying in position cement concrete of specified grade

excluding
[Link] (1 Cement thesand
: 2 coarse cost(zone-III)
of shuttering & cenetering
: 4 graded stone aggregate 40 mm
nominal size)
Volume of Concrete 1
Dry mix of about 52 to 54% extra volume(1.52 to 1.54). These
extra dry volume will get balance to 1 Cum after pouring water. 1.54
[Link]. Description Quantity Unit Rate
1 Material
Portland Cement 6.34 bag 245.04
Aggregate (Distribute in below) 0.88 Cum
Stone Aggregate (40mm) 0.55 Cum 1350.00
Stone Aggregate (20mm) 0.22 Cum 1350.00
Stone Aggregate (10mm) 0.11 Cum 1350.00
Coarse Sand (Zone III) 0.440 Cum 1350.000
2 Carriage of Material
Carriage of Cement 316.8 kg 0.092
Carriage of Stone Aggregate below 40mm 0.88 Cum 103.77

Carriage of Coarse Sand (Zone III) 0.440 Cum 103.77


3 Labour
Mason 0.1 day 709
Beldar 1.63 day 558
Bhishti 0.7 day 617
4 Equipments
Hire Charges of Concrete mixer 0.25 to 0.40
Cum with Hooper 0.07 day 800
Vibrator (Needle type 40mm) 0.07 day 370
Sundries 14.3 day 2

Total ₹
Add 1% Water Charges

Total
15% Contractor's profit
Grand Total ₹
specified grade
ring 40 mm
ggregate RATIO M15
CEMENT 1
Cum SAND 2

AGGREGATE 4
Amount TOTAL 7
Material Unit
1552.57 Portland Cement Bag
Aggregate (Distribute in below)
748.44
297.00 Stone Aggregate (20mm) Cum
142.56 Stone Aggregate (10mm) Cum
594.00 Coarse Sand (Zone III) Cum
Carriage of Materials
29.15 Carriage of portland cement kg
91.32 Carriage of Coarse Sand Cum
Carriage of Stone Aggregate below 40mm
Cum
45.66 Nominal Size
Labour
70.90 Mason day
909.54 beldar day
431.90 Bhisti day
Equipment
Hire Charges of Concrete Mixer (0.25 to 0.40
day
56.00 Cum With Hooper)
25.90 Vibrator (Needle Type 40mm) day
28.60 Sundries L.S.

5023.54

50.2353544

5073.77
761.06561916
5834.84
Rate ₹
245.04

1350.00
1350.00
1350.000

0.092
103.77
103.77

709
558
617

800
370
2

You might also like