Load Analysis for Lift Irrigation System

LT LOAD LIST

Uploaded by

Sathish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
196 views2 pages

Load Analysis for Lift Irrigation System

LT LOAD LIST

Uploaded by

Sathish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

LT Load List

Project: Guddada Mallapura(Madlur) Lift Irrigation Scheme


Voltage in No of SWGR Type of Load in Power Current Type of
[Link] Description Duty of Load Efficiency Main Standby DG Set
KV Phase Rating SWGR KW Factor in Amps starter
Pump House KW KVA KW KVA
Cooling Pumps
1 Cooling and lubrication pump 0.415 3 25 MPCB 2.5 Continuous 0.85 0.75 3.33 3.92 5.46 DOL 3.92
2 Cooling and lubrication pump 0.415 3 25 MPCB 2.5 Intermittent 0.85 0.75 3.33 3.92 5.46 DOL
Submersible Pumps
3 Submersible dewatering Pumps 0.415 3 25 MPCB 2.5 Continuous 0.85 0.9 2.78 3.27 4.55 DOL 3.27
4 Submersible dewatering Pumps 0.415 3 25 MPCB 2.5 Intermittent 0.85 0.9 2.78 3.27 4.55 DOL
Butter fly Valves
5 Butter fly Valves-1 0.415 3 16 MCCB 1.5 Continuous 0.88 0.85 1.76 2.01 2.79
6 Butter fly Valves-2 0.415 3 16 MCCB 1.5 Continuous 0.88 0.85 1.76 2.01 2.79
7 Butter fly Valves-3 0.415 3 16 MCCB 1.5 Continuous 0.88 0.85 1.76 2.01 2.79
Ventilation System
8 Ventilation Fan-1 0.415 3 10 MCB 1 Continuous 0.85 0.8 1.25 1.47 2.05
9 Ventilation Fan-2 0.415 3 10 MCB 1 Continuous 0.85 0.8 1.25 1.47 2.05
10 Ventilation Fan-3 0.415 3 10 MCB 1 Continuous 0.85 0.8 1.25 1.47 2.05
11 Ventilation Fan-4 0.415 3 10 MCB 1 Continuous 0.85 0.8 1.25 1.47 2.05
12 Ventilation Fan-5 0.415 3 10 MCB 1 Continuous 0.85 0.8 1.25 1.47 2.05
13 Ventilation Fan-6 0.415 3 10 MCB 1 Continuous 0.85 0.8 1.25 1.47 2.05
Lighting and Socket
14 Motor floor Lighting 0.415 3 16 MCCB 5 Continuous 0.85 0.8 6.25 7.35 10.23 7.35
15 63A Socket 0.415 3 63 MCCB 10 Intermittent 0.85 0.8 12.50 14.71 20.46
16 EOT Crane 0.415 3 80 MCCB 20 Intermittent 0.85 0.8 25.00 29.41 40.92
17 Gate Main Hoist 0.415 3 16 MCCB 5 Intermittent 0.85 0.8 6.25 7.35 10.23
18 Welding Socket 0.415 3 63 MCCB 10 Intermittent 0.85 0.8 12.50 14.71 20.46
19 PH Outdoor Lighting 0.415 3 16 MCCB 2 Intermittent 0.85 0.8 2.50 2.94 4.09 2.94
20 Switchyard Lighting 0.415 3 25 MCCB 2 Intermittent 0.85 0.8 2.50 2.94 4.09 2.94
Spare
21 100A-1No 0.415 3 100 MCCB
22 63A-1No 0.415 3 63 MCCB
23 16A - 2No's 0.415 3 16 MCCB
24 6A- 2No's 0.415 3 6 MCB
25 110V Battery Charger 0.415 3 63 MCCB 5 Continuous 0.85 0.8 6.25 7.35 10.23 7.35
ACDB control room
25 6.6kV I/C Panel-1 0.23 1 6 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
26 6.6kV I/C Panel-2 0.23 1 6 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
27 RTCC Panel-1 0.23 1 6 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
28 RTCC Panel-2 0.23 1 6 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
29 Soft Stator-1 0.23 1 6 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
30 Soft Stator-2 0.23 1 6 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
31 Soft Stator-3 0.23 1 6 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
32 Fixed Capacior Panel-1 0.23 1 6 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
33 Fixed Capacior Panel-2 0.23 1 6 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
34 Fixed Capacior Panel-3 0.23 1 6 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
35 Bus Capacitor Panel-1 0.23 1 6 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
36 Bus Capacitor Panel-2 0.23 1 6 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
37 Heater-1 0.23 1 10 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
38 Heater-2 0.23 1 10 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
39 Heater-3 0.23 1 10 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
ACDB Outdoor
40 11kV I/C Panel 0.23 1 6 MCB 1 Continuous 0.85 0.8 1.25 1.47 3.69 1.47
41 Transformer OLTC-1 0.415 1 16 MCCB 1 Continuous 0.85 0.8 1.25 1.47 2.05 1.47
42 Transformer OLTC-2 0.415 1 16 MCCB 1 Continuous 0.85 0.8 1.25 1.47 2.05 1.47
43 Transformer Marshalling box-1 0.23 1 6 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74
44 Transformer Marshalling box-2 0.23 1 6 MCB 0.5 Continuous 0.85 0.8 0.63 0.74 1.85 0.74

DG Sizing Aux. Trafo Sizing


Total Load 44.69 KVA Total Load 132.9 KVA
Highest load 7.35 KVA Continuous 55.1 KVA
Prestart Load 37.34 KVA Intermittent 79.2 KVA
Total 44.69 KVA Demand factor @0.6 47.5 KVA
10% Margin 49.16 KVA Total 102.7 KVA
Round Off 50 KVA 10% Margin 112.9 KVA
Round Off TRF Capacity 116 KVA
Selection of Aux.
DG Sizing 63 KVA Transformer 160 KVA