This one-line diagram shows the layout of a power grid consisting of 14 buses connected by transmission lines and transformers. The diagram provides key information like voltages, active and reactive power flows, and ratings for transmission lines and transformers. It also shows generating units, loads, and cables connected to different buses in the grid. This one-line diagram can be used for load flow analysis of the power system to study power flows and voltage profiles under different operating conditions.

Uploaded by

Enginer Phone
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views

One-Line Diagram - OLV1 (Load Flow Analysis) : Open Open Open Open

This one-line diagram shows the layout of a power grid consisting of 14 buses connected by transmission lines and transformers. The diagram provides key information like voltages, active and reactive power flows, and ratings for transmission lines and transformers. It also shows generating units, loads, and cables connected to different buses in the grid. This one-line diagram can be used for load flow analysis of the power system to study power flows and voltage profiles under different operating conditions.

Uploaded by

Enginer Phone
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

One-Line Diagram - OLV1 (Load Flow Analysis)

Power Grid
500,113 MVAsc
Gen1
1912,5 kW

Bus1
3145 %
150 kV j1435 100
Bus10
2525 619,9 621,6
8 % 11 kV 100
%
j1330j105,1 99,9 j363,8

T1 bus4 619,8 621,6


j358,7 j363,8
bus3 4500 kVA 150 kV
% T6
20 kV 97,5 T5
2000 kVA
1535 975,7 2000 kVA
j744,7 j457,1 bus13
bus12
7 % 7 %
20 kV 98,5
20 kV 98,5
Cable1
617,1 619
j342,9 j347,8
Cable3 Cable4
Cable2

bus8
4 % bus11
bus7 20 kV 97,2 98,4
%
9 % 20 kV
20 kV 97,0
972,8 1234
784,3 743 j456,4 j690,1
j293,7 j449,2 T4 Open Cable5
1500 kVA T7
Open 1500 kVA
T2
T3
1000 kVA 1000 kVA bus9
%
0,6 kV 94,7
535,5 428,9 bus14
bus5 bus6 8 %
9 % 6 % j224,9 j181,3 0,4 kV 94,7
0,4 kV 94,5kV
0,4 93,8
333,1 404,2 482,2
416,1 357,9 414,9 317,1 j206,4 j195,8 j203,1
j257,9 j0 j257,1 j153,6

Mtr1 Syn1
Lump1 Load1 500 kW0,4
kW0,4 MW Mtr2
Lump2 Load2 Lump3 Load3
500,1 kVA 450 kW
400,1 kVA 500 kVA400 kVA 400 kVA 500 kVA

page 1 11:40:04 Dec 05, 2021 Project File: modul3