Activity ID
Activity Name
160 villas - Gate House
Start Milestone
A1540
Mobilization
Engineering Works
MATERIALS
PREPARATION/SUBMITTALS
Original
Duration
Start
Finish
Total
2
FloatDec
70
24-Feb-14
02-Jun-14
10
70
24-Feb-14
30-May-14
10
24-Feb-14
32
24-Feb-14
08-Apr-14
48
31
24-Feb-14
07-Apr-14
28
24-Feb-14
24-Feb-14
24-Feb-14
07-Mar-14
07-Mar-14
04-Mar-14
44
44
31
A1280
P/S WATER HEATER - 50 Ltr
10
10
7
A1170
P/S WATER BOOSTER PUMP
26-Feb-14
06-Mar-14
29
A1080
P/S GATE BARRIER
27-Feb-14
07-Mar-14
28
A1320
P/S Refrigent Pipe
1
1
24-Feb-14
24-Feb-14
24-Feb-14
24-Feb-14
53
53
A1330
P/S Exhaus fanst
24-Feb-14
24-Feb-14
53
A1290
WATER HEATER - 50 Ltr
30
30
14
25-Feb-14
25-Feb-14
14-Mar-14
07-Apr-14
07-Apr-14
02-Apr-14
28
28
31
A1140
WATER BOOSTER PUMP
14
18-Mar-14
04-Apr-14
29
A1340
GATE BARRIER
14
19-Mar-14
07-Apr-14
28
A1560
Refrigent Pipe
1
1
25-Feb-14
25-Feb-14
25-Feb-14
25-Feb-14
53
53
A1570
Exhaus fanst
MEP MATERILAS
HAVC
APPROVALS
MEP MATERILAS
HAVC
PROCURE AND DELIVER
25-Feb-14
25-Feb-14
53
30
26-Feb-14
08-Apr-14
28
A1610
Refrigent Pipe
26-Feb-14
26-Feb-14
53
A1630
Exhaus fanst
26-Feb-14
26-Feb-14
53
A1600
WATER HEATER - 50 Ltr
03-Apr-14
03-Apr-14
31
A1590
WATER BOOSTER PUMP
07-Apr-14
07-Apr-14
29
A1550
GATE BARRIER
08-Apr-14
08-Apr-14
28
30
24-Feb-14
04-Apr-14
50
10
9
24-Feb-14
24-Feb-14
07-Mar-14
06-Mar-14
70
35
SHOP DRAWINGS
Preperation/Submittal
FINISHES DRAWINGS
Actual Work
Remaining Work
Page 1 of 9
2014
Jan
Feb
Mar
Apr
May
Jul
Aug
Mobilization
Arabtec Construction .L.L.C
Gate House - 160 Villas DSOA
Jun
Date
24-Feb-14
Baseline Schedule
Revision Checked Appr...
Activity ID
Activity Name
Original
Duration
Start
Finish
Total
2
FloatDec
SDBT-001
P/S Bathroom Tiling Layout, Wall
Elevation
24-Feb-14
27-Feb-14
37
SDIF-001
P/S Internal Finishes Option Layout
24-Feb-14
27-Feb-14
26
SDBT-021
P/S Architectural features on Elevations
24-Feb-14
27-Feb-14
28
SDBT-031
P/S General Floor Tiling layout & Details
24-Feb-14
27-Feb-14
37
SDBT-011
P/S Ext Light Fitting, Location on
Elevation
25-Feb-14
28-Feb-14
33
SDCL-001
P/S Cat Ladder Location & Details
26-Feb-14
03-Mar-14
38
A1510
P/S GRC WORKS Layout.
28-Feb-14
05-Mar-14
34
SDEP-021
P/S External paint Colour Scheme layout
03-Mar-14
06-Mar-14
25
SDAC-001
P/S AC Works Shop Drawings
9
4
25-Feb-14
25-Feb-14
07-Mar-14
28-Feb-14
70
29
SDPD-001
P/S Plumbing Drainage Work Shop
Draw-SubStr
26-Feb-14
03-Mar-14
23
SDEW-001
P/S Electrical Work Shop
Darwings-SubStr
27-Feb-14
04-Mar-14
SDEWP-001
P/S Electrical Work Shop
Darwings-SupStr
28-Feb-14
05-Mar-14
32
SDBW-001
P/S Builder Works Shop Drawings-supstr
03-Mar-14
06-Mar-14
31
SDBW-011
P/S Builder Works Shop Drawings-substr
03-Mar-14
06-Mar-14
SDBW-021
P/S Plumbing Drainage Work Shop
Draw-SupStr
04-Mar-14
07-Mar-14
70
11-Mar-14
11-Mar-14
11-Mar-14
04-Apr-14
04-Apr-14
28-Mar-14
35
35
37
MEP DRAWINGS
Approval
A1110
Bathroom Tiling Layout, Wall Elevation
19
19
14
A1190
Internal Finishes Option Layout
14
11-Mar-14
28-Mar-14
26
A1300
Architectural features on Elevations
14
11-Mar-14
28-Mar-14
28
A1310
General Floor Tiling layout & Details
14
11-Mar-14
28-Mar-14
37
A1210
Ext Light Fitting, Location on Elevation
14
12-Mar-14
31-Mar-14
33
A1100
Cat Ladder Location & Details
14
13-Mar-14
01-Apr-14
38
A1160
GRC WORKS Layout.
14
17-Mar-14
03-Apr-14
34
A1220
External paint Colour Scheme layout
14
18-Mar-14
04-Apr-14
25
18
12-Mar-14
04-Apr-14
31
FINISHES DRAWINGS
MEP DRAWINGS
Actual Work
Remaining Work
Page 2 of 9
2014
Jan
Feb
Mar
Apr
May
Arabtec Construction .L.L.C
Gate House - 160 Villas DSOA
Date
24-Feb-14
Jun
Jul
Aug
Baseline Schedule
Revision Checked Appr...
Activity ID
Activity Name
Original
Duration
Start
Finish
Total
2
FloatDec
A1000
AC Works Shop Drawings
14
12-Mar-14
31-Mar-14
29
A1060
Plumbing Drainage Work Shop
Draw-SupStr
18
12-Mar-14
04-Apr-14
31
A1010
Plumbing Drainage Work Shop
Draw-SubStr
14
13-Mar-14
01-Apr-14
23
A1020
Electrical Work Shop Darwings-SubStr
14
14-Mar-14
02-Apr-14
A1030
Electrical Work Shop Darwings-SupStr
14
17-Mar-14
03-Apr-14
32
A1040
Builder Works Shop Drawings-supstr
14
18-Mar-14
04-Apr-14
31
A1050
Builder Works Shop Drawings-substr
14
18-Mar-14
04-Apr-14
70
24-Feb-14
30-May-14
66
24-Feb-14
26-May-14
EXCAVATION
48
1
1
24-Feb-14
24-Feb-14
24-Feb-14
30-Apr-14
24-Feb-14
24-Feb-14
5
23
23
BI-00Q
BLINDING
5
1
25-Feb-14
25-Feb-14
03-Mar-14
25-Feb-14
24
24
FOO-00Q
FOOTING
26-Feb-14
03-Mar-14
24
ST-00Q
STUB WALL
31
1
04-Mar-14
04-Mar-14
15-Apr-14
04-Mar-14
0
24
BA-00Q
BACKFILLING
08-Apr-14
08-Apr-14
GS-00Q
GROUND SLAB
09-Apr-14
15-Apr-14
CO-00Q
COLUMNS
11
5
16-Apr-14
16-Apr-14
30-Apr-14
22-Apr-14
5
0
RS-00Q
ROOF SLAB
23-Apr-14
29-Apr-14
PA-00Q
PARPET WALL
30-Apr-14
30-Apr-14
BLOCKWORK
3
3
30-Apr-14
30-Apr-14
02-May-14
02-May-14
0
0
ALUMINIUM DOORS & WINDOWS
2
2
12-May-14
12-May-14
13-May-14
13-May-14
6
6
PLASTER FOR EXTERNAL AREAS
7
5
2
05-May-14
05-May-14
05-May-14
13-May-14
09-May-14
06-May-14
11
13
3
Construction of 3 Gate House
Cluster Q
STRUCTURAL WORKS
Excavation
EX-00Q
Foundation
Slab on Grade
ROOF
BLOCKWORK
BLO-00Q
ALUMINIUM WORKS
AL-00Q
FINISHES WORKS
WALL FINISHES
EW11
Actual Work
Remaining Work
Page 3 of 9
2014
Jan
Feb
Mar
Apr
May
Arabtec Construction .L.L.C
Gate House - 160 Villas DSOA
Date
24-Feb-14
Jun
Jul
Aug
Baseline Schedule
Revision Checked Appr...
Activity ID
Activity Name
Original
Duration
Start
Finish
Total
2
FloatDec
INT-00Q
INTERNAL PLASTER
06-May-14
07-May-14
EW12
EXTERNAL PAINT
07-May-14
08-May-14
W12
GLAZED,COLOURED,PATTERNED
CERAMIC TILES ON SAND/CEMENT
MORTAR
08-May-14
09-May-14
13
2
2
08-May-14
08-May-14
09-May-14
09-May-14
9
9
4
2
08-May-14
08-May-14
13-May-14
09-May-14
4
6
FLOOR FINISHES
F14
COLOURED NON-SLIP CERAMIC
TILES
CEILING FINISHES
SPRAY PLASTER
GYP-00Q
GYPSUM TILE SYSTEM WITH FINE
LINE SUSPENSION (TOILET)
12-May-14
12-May-14
GYPO-00Q
ORDINARY GYPSUM BOARD FALSE
CEILING SYSTEM (LOBBY)
13-May-14
13-May-14
04-Apr-14
07-Apr-14
07-Apr-14
15-May-14
05-May-14
07-Apr-14
4
11
0
A1360Q
[Link] Drainage Piping in SubStr.
30
21
1
A1340Q
Condu. in Structure (Grade slab).
09-Apr-14
09-Apr-14
29
A1350Q
[Link] Drainage & Water Supply
05-May-14
05-May-14
A1330Q
High Level Drainage
05-May-14
05-May-14
A1500Q
Condu.& Fix [Link] in Blockwork.
05-May-14
05-May-14
REF-00Q10
Inst of water heater
26
1
04-Apr-14
04-Apr-14
09-May-14
04-Apr-14
8
31
WIR-011Q
WIRING WORKS
08-May-14
08-May-14
FCU-00Q
INSTALLTION OF FCU'S
08-May-14
08-May-14
REF-00Q
REFREGERANT PIPES
09-May-14
09-May-14
SA-00Q
Inst of AC Unit
5
1
09-May-14
09-May-14
15-May-14
09-May-14
4
1
EXH-00Q
Inst. of EXHAUST Fan
12-May-14
12-May-14
PUM-0Q
SUBMERSIBLE WATER BOOSTER
PUMP
13-May-14
13-May-14
LF-00Q
Ins. of Light Fittings
14-May-14
14-May-14
SF-00Q
Inst. of sanitary Fittings & Wares
15-May-14
15-May-14
MEP 1st Fix
MEP 2nd Fix
MEP Final Fix
Actual Work
Remaining Work
Page 4 of 9
Feb
Mar
Apr
May
Arabtec Construction .L.L.C
Gate House - 160 Villas DSOA
Jun
Jul
Aug
SPR-00Q
MEP WORKS
2014
Jan
Date
24-Feb-14
Baseline Schedule
Revision Checked Appr...
Activity ID
Activity Name
Original
Duration
Start
Electrical Accessories
15-May-14
15-May-14
CAT LADDER
1
1
09-May-14
09-May-14
09-May-14
09-May-14
11
11
UGW-00Q
UNDER GROUND WATER TANK
49
2
05-Mar-14
05-Mar-14
12-May-14
06-Mar-14
9
52
GR-00Q10
GATE BARRIER
09-Apr-14
09-Apr-14
28
EXT-00Q
INTERLOCK PAVING
09-May-14
12-May-14
GR-00Q
GRC WORK
09-May-14
12-May-14
Handing Over
7
1
16-May-14
26-May-14
26-May-14
26-May-14
4
4
Testing & Commissioning
1
1
16-May-14
16-May-14
16-May-14
16-May-14
4
4
Disinfection
1
1
22-May-14
22-May-14
22-May-14
22-May-14
4
4
1
1
23-May-14
23-May-14
23-May-14
23-May-14
4
4
67
26-Feb-14
29-May-14
EXCAVATION
25
1
1
26-Feb-14
26-Feb-14
26-Feb-14
01-Apr-14
26-Feb-14
26-Feb-14
28
23
23
BI-00M
BLINDING
6
1
27-Feb-14
27-Feb-14
06-Mar-14
27-Feb-14
23
23
FOO-00M
FOOTING
28-Feb-14
06-Mar-14
23
ST-00M
STUB WALL
7
1
07-Mar-14
07-Mar-14
17-Mar-14
07-Mar-14
23
23
BA-00M
BACKFILLING
10-Mar-14
10-Mar-14
23
GS-00M
GROUND SLAB
11-Mar-14
17-Mar-14
23
CO-00M
COLUMNS
11
5
18-Mar-14
18-Mar-14
01-Apr-14
24-Mar-14
28
23
RS-00M
ROOF SLAB
25-Mar-14
31-Mar-14
23
PA-00M
PARPET WALL
01-Apr-14
01-Apr-14
28
BLOCKWORK
3
3
01-Apr-14
01-Apr-14
03-Apr-14
03-Apr-14
23
23
EA-00Q
Miscellaneous
CA-00Q
EXTERNAL WORKS
HANDING OVER
HO-Q
Testing & commissioning
TC-Q
Disinfection
D-Q
Snagging & Cleaning
SC-Q
Snagging & Cleaning
Cluster M
STRUCTURAL WORKS
Excavation
EX-00M
Foundation
Slab on Grade
ROOF
BLOCKWORK
BLO-00M
Actual Work
Remaining Work
Page 5 of 9
Finish
Total
2
FloatDec
2014
Jan
Feb
Mar
Apr
May
Arabtec Construction .L.L.C
Gate House - 160 Villas DSOA
Date
24-Feb-14
Jun
Jul
Aug
Baseline Schedule
Revision Checked Appr...
Activity ID
Activity Name
FINISHES WORKS
Original
Duration
Start
Finish
Total
2
FloatDec
04-Apr-14
04-Apr-14
04-Apr-14
16-May-14
12-May-14
07-Apr-14
8
12
26
0
EW01
PLASTER FOR EXTERNAL AREAS
31
27
2
INT-00M
INTERNAL PLASTER
08-May-14
09-May-14
EW02
EXTERNAL PAINT
09-May-14
12-May-14
W02
GLAZED,COLOURED,PATTERNED
CERAMIC TILES ON SAND/CEMENT
MORTAR
12-May-14
12-May-14
12
2
2
12-May-14
12-May-14
13-May-14
13-May-14
9
9
5
2
12-May-14
12-May-14
16-May-14
13-May-14
1
4
WALL FINISHES
FLOOR FINISHES
F04
COLOURED NON-SLIP CERAMIC
TILES
CEILING FINISHES
SPR-00M
SPRAY PLASTER
GYP-00M
GYPSUM TILE SYSTEM WITH FINE
LINE SUSPENSION (TOILET)
15-May-14
15-May-14
GYPO-00M
ORDINARY GYPSUM BOARD FALSE
CEILING SYSTEM (LOBBY)
16-May-14
16-May-14
EXTERNAL WORKS
UGW-00M
UNDER GROUND WATER TANK
48
1
10-Mar-14
10-Mar-14
14-May-14
10-Mar-14
9
51
UGW-00M10
GATE BARRIER
10-Apr-14
10-Apr-14
28
EXT-00M
INTERLOCK PAVING
13-May-14
14-May-14
GR-00M
GRC WORK
13-May-14
14-May-14
ALUMINIUM DOORS & WINDOWS
2
2
14-May-14
14-May-14
15-May-14
15-May-14
4
4
A1230
[Link] Drainage Piping in SubStr.
53
21
1
07-Mar-14
07-Mar-14
07-Mar-14
20-May-14
04-Apr-14
07-Mar-14
1
32
23
A1240
Condu. in Structure (Grade slab).
11-Mar-14
11-Mar-14
50
A1250
Condu.& Fix [Link] in Blockwork.
04-Apr-14
04-Apr-14
23
A1260
[Link] Drainage & Water Supply
04-Apr-14
04-Apr-14
23
A1270
High Level Drainage
04-Apr-14
04-Apr-14
23
Inst of water heater
27
1
07-Apr-14
07-Apr-14
13-May-14
07-Apr-14
6
31
ALUMINIUM WORKS
AL-00M
MEP WORKS
MEP 1st Fix
MEP 2nd Fix
FCU-00M10
Actual Work
Remaining Work
Page 6 of 9
2014
Jan
Feb
Mar
Apr
May
Arabtec Construction .L.L.C
Gate House - 160 Villas DSOA
Date
24-Feb-14
Jun
Jul
Aug
Baseline Schedule
Revision Checked Appr...
Activity ID
Activity Name
Original
Duration
Start
Finish
Total
2
FloatDec
FCU-00M
INSTALLTION OF FCU'S
12-May-14
12-May-14
WIR-001
WIRING WORKS
12-May-14
12-May-14
REF-00M
REFREGERANT PIPES
13-May-14
13-May-14
SA-00M30
Inst of AC Unit
6
1
13-May-14
13-May-14
20-May-14
13-May-14
1
0
EXH-00M
Inst. of EXHAUST Fan
14-May-14
14-May-14
PUM-001
SUBMERSIBLE WATER BOOSTER
PUMP
15-May-14
15-May-14
SA-00M10
Ins. of Light Fittings
19-May-14
19-May-14
SA-00M
Inst. of sanitary Fittings & Wares
20-May-14
20-May-14
SA-00M20
Electrical Accessories
20-May-14
20-May-14
CAT LADDER
1
1
12-May-14
12-May-14
12-May-14
12-May-14
11
11
Handing Over
7
1
21-May-14
29-May-14
29-May-14
29-May-14
1
1
Testing & Commissioning
1
1
21-May-14
21-May-14
21-May-14
21-May-14
1
1
Disinfection
1
1
27-May-14
27-May-14
27-May-14
27-May-14
1
1
1
1
28-May-14
28-May-14
28-May-14
28-May-14
1
1
66
28-Feb-14
30-May-14
EXCAVATION
16
1
1
28-Feb-14
28-Feb-14
28-Feb-14
21-Mar-14
28-Feb-14
28-Feb-14
37
32
32
BI-00N
BLINDING
4
1
03-Mar-14
03-Mar-14
06-Mar-14
03-Mar-14
32
32
FOO-00N
FOOTING
04-Mar-14
06-Mar-14
32
ST-00N
STUB WALL
5
1
07-Mar-14
07-Mar-14
13-Mar-14
07-Mar-14
32
32
BA-00N
BACKFILLING
10-Mar-14
10-Mar-14
32
GS-00N
GROUND SLAB
11-Mar-14
13-Mar-14
32
14-Mar-14
21-Mar-14
37
MEP Final Fix
Miscellaneous
CA-00M20
HANDING OVER
HO-M
Testing & commissioning
TC-M
Disinfection
D-M
Snagging & Cleaning
SC-M
Snagging & Cleaning
Cluster N
STRUCTURAL WORKS
Excavation
EX-00N
Foundation
Slab on Grade
ROOF
Actual Work
Remaining Work
Page 7 of 9
2014
Jan
Feb
Mar
Apr
May
Arabtec Construction .L.L.C
Gate House - 160 Villas DSOA
Date
24-Feb-14
Jun
Jul
Aug
Baseline Schedule
Revision Checked Appr...
Activity ID
Activity Name
Original
Duration
Start
Finish
Total
2
FloatDec
CO-00N
COLUMNS
14-Mar-14
18-Mar-14
32
RS-00N
ROOF SLAB
19-Mar-14
20-Mar-14
32
PA-00N
PARPET WALL
21-Mar-14
21-Mar-14
37
BLOCKWORK
3
3
21-Mar-14
21-Mar-14
25-Mar-14
25-Mar-14
32
32
EW21
PLASTER FOR EXTERNAL AREAS
39
37
2
26-Mar-14
26-Mar-14
26-Mar-14
19-May-14
15-May-14
27-Mar-14
7
9
35
INT-00M20
INTERNAL PLASTER
12-May-14
13-May-14
EW22
EXTERNAL PAINT
13-May-14
13-May-14
W22
GLAZED,COLOURED,PATTERNED
CERAMIC TILES ON SAND/CEMENT
MORTAR
14-May-14
15-May-14
2
2
14-May-14
14-May-14
15-May-14
15-May-14
9
9
4
2
14-May-14
14-May-14
19-May-14
15-May-14
0
2
BLOCKWORK
BLO-00N
FINISHES WORKS
WALL FINISHES
FLOOR FINISHES
F24
COLOURED NON-SLIP CERAMIC
TILES
CEILING FINISHES
SPR-00N
SPRAY PLASTER
GYP-00N
GYPSUM TILE SYSTEM WITH FINE
LINE SUSPENSION (TOILET)
16-May-14
16-May-14
GYPO-00N
ORDINARY GYPSUM BOARD FALSE
CEILING SYSTEM (LOBBY)
19-May-14
19-May-14
11-Mar-14
11-Mar-14
15-May-14
11-Mar-14
9
51
EXTERNAL WORKS
UGW-00N
UNDER GROUND WATER TANK
48
1
UGW-00N10
GATE BARRIER
11-Apr-14
11-Apr-14
28
EXT-00N
INTERLOCK PAVING
14-May-14
15-May-14
GR-00N
GRC WORK
15-May-14
15-May-14
ALUMINIUM DOORS & WINDOWS
2
2
16-May-14
16-May-14
19-May-14
19-May-14
2
2
A1400
[Link] Drainage Piping in SubStr.
54
14
1
07-Mar-14
07-Mar-14
07-Mar-14
21-May-14
26-Mar-14
07-Mar-14
0
39
32
A1380
Condu. in Structure (Grade slab).
11-Mar-14
11-Mar-14
50
ALUMINIUM WORKS
AL-00N
MEP WORKS
MEP 1st Fix
Actual Work
Remaining Work
Page 8 of 9
2014
Jan
Feb
Mar
Apr
May
Arabtec Construction .L.L.C
Gate House - 160 Villas DSOA
Date
24-Feb-14
Jun
Jul
Aug
Baseline Schedule
Revision Checked Appr...
Activity ID
Activity Name
Original
Duration
Start
Finish
Total
2
FloatDec
A1390
[Link] Drainage & Water Supply
26-Mar-14
26-Mar-14
32
A1370
High Level Drainage
26-Mar-14
26-Mar-14
32
A1490
Condu.& Fix [Link] in Blockwork.
26-Mar-14
26-Mar-14
32
WIR-021N10
Inst of water heater
28
1
08-Apr-14
08-Apr-14
15-May-14
08-Apr-14
4
31
WIR-021N
WIRING WORKS
14-May-14
14-May-14
FCU-00N
INSTALLTION OF FCU'S
14-May-14
14-May-14
REF-00N
REFREGERANT PIPES
15-May-14
15-May-14
EXH-00N
Inst. of EXHAUST Fan
5
1
15-May-14
15-May-14
21-May-14
15-May-14
0
0
SA-00N
Inst of AC Unit
15-May-14
15-May-14
PUM-021
SUBMERSIBLE WATER BOOSTER
PUMP
16-May-14
16-May-14
LF-00N
Ins. of Light Fittings
20-May-14
20-May-14
SF-00N
Inst. of sanitary Fittings & Wares
21-May-14
21-May-14
EA-00N
Electrical Accessories
21-May-14
21-May-14
CAT LADDER
1
1
14-May-14
14-May-14
14-May-14
14-May-14
10
10
Handing Over
7
1
22-May-14
30-May-14
30-May-14
30-May-14
0
0
Testing & Commissioning
1
1
22-May-14
22-May-14
22-May-14
22-May-14
0
0
Disinfection
1
1
28-May-14
28-May-14
28-May-14
28-May-14
0
0
1
1
29-May-14
29-May-14
29-May-14
29-May-14
0
0
02-Jun-14
02-Jun-14
02-Jun-14*
MEP 2nd Fix
MEP Final Fix
Miscellaneous
CA-00N
HANDING OVER
HO-N
Testing & commissioning
TC-N
Disinfection
D-N
Snagging & Cleaning
SC-N
Snagging & Cleaning
PROJECT CLOSE OUT
A1530
Project Close out
Actual Work
Remaining Work
Page 9 of 9
2014
Jan
Feb
Mar
Apr
May
Jul
Aug
Project Close out
Arabtec Construction .L.L.C
Gate House - 160 Villas DSOA
Jun
Date
24-Feb-14
Baseline Schedule
Revision Checked Appr...