Naadhee Monthly Progress Report Dec-23

Uploaded by

Ravendra Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

Naadhee Monthly Progress Report Dec-23

Uploaded by

Ravendra Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

MONTHLY PROGRESS REPORT

Dec’ 23
NAADHEE
MALE

APPROVED BY PREPARED BY

Kallol Biswas Ravendra Sharma


GM-Projects Planning Manager
CONTENTS

1.0 EXECUTIVE SUMMARY


1.1 PROJECT LOCATION MAP AND ISLAND DETAIL
1.2 PROJECT BACKGROUND
1.3 PROJECT DATA
1.4 SCOPE OF WORKS
1.5 VARIATION
1.6 CONCEPT DESIGN
1.7 REVISED CONCEPT (if any)
1.8 PROJECT TEAM
1.9 MANPOWER AT SITE
1.10 EQUIPMENT AT SITE
1.11 WEATHER REPORT
2.0 PROGRESS
2.1 PROGRESS PERCENTAGE (FOR THE MONTH)
2.2 PROGRESS
2.3 QUALITY ASSURANCE ACTIVITY
2.4 ENVIRONMENTAL MANAGEMENT MONITORING ACTIVITIES
2.5 MATERIAL STATUS
2.6 MATERIAL APPROVALS
2.7 SUBMITTALS AND APPROVALS
2.8 PROGRESS WORK SCHEDULE
2.9 PROGRESS PHOTOS
3.0 KEY ISSUES
4.0 PROGRESS MEETINGS
5.0 CONCLUSION
APPENDIX 1: MEETING MINUTES
APPENDIX 2: GANT CHART
APPENDIX 3: PROGRESS PHOTOS

2|Page
1 EXECUTIVE SUMMARY

Nadhee site is in Male city, the capital and most populous city in the Republic of
Maldives, with a population of 227,486 and an area of 8.30 square kilometers (3.20 sq
mt). The city is geographically located at the southern edge of North Male Atoll (Kaafu
Atoll).

1.1 PROJECT LOCATION MAP DETAIL

1.2 PROJECT BACKGROUND


Plot no’s: BLK 58 – NAADHEE
Plot Area - 21,489 sqft.
BUA – 174,459 sft
Saleable residential - 96,334 sqft
Saleable commercial - 22,243 sqft
Number of units - 72 Nos of 3 BHK (Building configuration: Basement + 2
levels of commercial + 9 levels of typical residential floors)
Current approved Height 40.55 mt

3|Page
1.3 PROJECT DATA

PROJECT NAME Nadhee


CONTRACTOR Apex Reality Pvt Ltd
CLIENT MNPHI
ENGINEER EDIFICE
COMMENCEMENT DATE 13 Jan 22
ORIGINAL PROJECT
12 Jan 26
COMPLETION DATE
REVISED PROJECT
23 Mar 26
COMPLETION DATE
CONTRACT DURATION 48 Months
VARIATION DURATION 50 Months
CONTRACT PRICE 286,000,000.00 MVR
VARIATION VALUE -
TOTAL PROJECT VALUE 286,000,000.00 MVR

1.4 SCOPE OF WORKS


Development & Construction of 12 Storey Building with a terrace at Nadhee
(H. Blue Heaven)

1.5 VARIATION
Nil

1.6 CONCEPT DESIGN


Basement + 2 levels of commercial + 9 levels of typical residential floors

REVISED CONCEPT (if any)


Nil

4|Page
1.7 PROJECT TEAM

SN Team Member
Apex Reality Pvt Ltd
1 Kallol Biswas Project Head - GM – Projects
2 Kalpesh Patel Manager – Accounts
Riyan Pvt Ltd
3 Gnanamoorthy Senior Engineer
4 Ravendra Sharma Planning
5 Ganesh Pandian Supervisor – Structure
6 Salman Khan EHS
7 Prithiviraj Rajan Quality
8 Karthik Document Controller
9 Chamindu Billing/QS
10 Shyambabu Gupta MEP Supervisor

1.8 MANPOWER AT SITE

# SKILL / Designation NOS


1 Carpenter 51
2 Bar Bender 33
3 Mason 47
4 Unskilled 40
5 MEP 11

1.9 EQUIPMENT AT T H E SITE

# EQUIPMENT NOS
1 Batching plant CP 15 01
2 Self-Loading Concrete Mixers 01
3 Miniflit/ Hoist 02
4 Winget Mixer Machine 01
5 Bar Cutting Machine 01
6 Bar Bending Machine 01
7 Power Drill Machine 05
8 Concrete Vibrator 03
9 Cutt off machine (14") Machine 02
10 Wood planer machine 01

1.10 WEATHER REPORT

Temperature range: 27°C - 29°C.


Climate: Sunny
Rainfall: Light

5|Page
2 PROGRESS

2.1 PROGRESS PERCENTAGE (FOR THE MONTH)

Overall Completion Percentage up to Dec’23 – 40%

110%
Planned Vs Actual Progress
100%
Project Progress 99% 100%

90% 93%

87%

80% 82%
78%

70% 72%

67%

60% 62%

54%
50%

40% 46%
40% 36%
43%
34% 40%
31% 32%
29%
36%
Planned Progress
30% 27% 32%
25%
23% 28%
Actual Progress
20%21%
18% 19%
25%
20% 16% 22%
14% 20% 21%
12% 17% 18%
9% 15%
10% 7% 13%
5% 11%
9% 10%
2% 3% 7% 8%
0% 0% 5%
4%
0% 2% 3%
1% 1% 1%
Mar-22
Mar-22

Sep-23

Dec-23
Dec-23

Dec-24
Dec-24
Jun-22
Jul-22
Jul-22

Sep-22
Sep-22

Dec-22

Mar-23
Mar-23

Jun-23
Jul-23
Jul-23

Sep-23

Mar-24

Sep-24
Jun-24
Jun-24
Jul-24
Aug-22

Aug-23

Aug-24
Aug-24
Feb-22

Apr-22

Nov-22
Nov-22

Feb-23

Apr-23

Nov-23
Nov-23

Feb-24
Feb-24

Apr-24
Apr-24

Nov-24
Jan-22

May-22
May-22

Oct-22

Jan-23
Jan-23

May-23
May-23

Oct-23

Jan-24

May-24

Oct-24
Oct-24

Jan-25
2.2 PROGRESS

Progress Progress Cumulative


SN Description of component Unit Qty (Previous (Current Progress
Month) Month) %
Fourth to Fifth Floor column 29 0
1 MT 29 100%
reinforcement work
Fourth to Fifth Floor column 103 0
2 Nos 103 100%
Concrete work
Fifth floor slab shuttering work 930 0
3 SQM 930 100%
- Tower A
Fifth floor slab reinforcement 14.38 0
4 MT 14.38 100%
work - Tower A
07th floor slab shuttering work 930 0
5 SQM 930 100%
- Tower B
07th floor slab reinforcement 14.38 0
6 MT 14.38 100%
work - Tower B
7 07th Floor Slab Concrete work Cum 130 130 0 100%
07th to 08th
Floor column 17 13
8 MT 29 100%
reinforcement work
Seventh floor to Eighth Floor 45 64
9 Nos 103 100%
column concrete work
10 08th Floor Slab Concrete Cum 130 0 130 100%

6|Page
2.3 QUALITY ASSURANCE ACTIVITY

28 days compressive strength results of 06th Floor Tower B Slab, 06th floor
to 07th floor Column concrete and 06th floor to 07th floor Lift Wall concrete.

Date of Results N/mm2


testing Description Report submitted
1 2 3

21/12/23 Set 1 – M30 38.42 36.40 37.59 21/12/23

21/12/23 Set 2 – M30 36.35 38.42 37.07 21/12/23

21/12/23 Set3 – M-40 44.13 43.82 44.62 21/12/23

24/12/23 Set 4 – M40 45.78 44.27 43.60 24/12/23

2.4 ENVIRONMENTAL MANAGEMENT MONITORING ACTIVITIES

Activities Date

Environmental impact analysis 09/03/22

2.5 MATERIAL STATUS

All material purchases & installation in the scope of Rainbow Construction Pvt Ltd

Description Unit Delivered QTY Consumed Qty


Nil

2.6 MATERIAL APPROVALS

# Description Status
1 Nil
2

2.7 SUBMITTALS AND APPROVALS

7|Page
Status (with
# Description
date)
1 Quality Management Plan Approved
2 Safety Plan Approved
3 Project Board Approved
4 Construction Schedule Submitted
5 Drawings Approved
9 Material Inspection (Site Received Material) Approved
10 Environmental Monitoring Report Submitted

2.8 PROGRESS WORK SCHEDULE

A Gantt Chart representing planned progress and actual progress


- Attached in Appendix

2.9 PROGRESS PHOTOS


- Attached in Appendix

3.0 KEY ISSUES

SN ISSUES SOLUTIONS OBTAINED


3.1 ISSUES RELATED TO CLIENT
Road closure permission for concreting work Awaited
from City council
3.2 ISSUES RELATED TO CONSTRUCTION
Concrete availability Arranged standby RMC plant
3.3 DESIGN ISSUES
3.4 HEALTH AND SAFETY ISSUES
3.5 INCIDENT / ACCIDENT REPORT

4.0 PROGRESS MEETINGS

4.1 PROGRESS MEETINGS HELD

8|Page
# Description Dated
1 Monthly Progress review meeting #1 27/01/22
2 Monthly Progress review meeting #2 14/02/22
3 Monthly Progress review meeting #3 08/03/22
4 Monthly Progress review meeting #4 05/04/22
5 Monthly Progress review meeting #5 12/05/22
6 Monthly Progress review meeting #6 14/06/22
7 Monthly Progress review meeting #7 19/07/22
8 Monthly Progress review meeting #8 17/08/22
9 Monthly Progress review meeting #9 12/09/22
10 Monthly Progress review meeting #10 18/10/22
11 Monthly Progress review meeting #11 14/11/22
12 Monthly Progress review meeting #12 12/12/22
13 Monthly Progress review meeting #13 18/01/23
14 Monthly Progress review meeting #14 13/02/23
15 Monthly Progress review meeting #15 14/03/23
16 Monthly Progress review meeting #16 11/04/23
17 Monthly Progress review meeting #17 17/05/23
18 Monthly Progress review meeting #18 19/06/23
19 Monthly Progress review meeting #19 18/07/23
20 Monthly Progress review meeting #20 21/08/23
21 Monthly Progress review meeting #21 18/09/23
22 Monthly Progress review meeting #22 23/10/23
23 Monthly Progress review meeting #23 23/11/23
24 Monthly Progress review meeting #24 18/12/23

5.0 Conclusion
The project is progressing ahead of schedule with a completed progress
percentage of 40%. No Major issue found out so far except road closing permission
from City council.