4.
KOSUPAHBURUH
4.1
TUJUAN
Bahagian ini mengandungi maklumat berhubung dengan kos dan kadar upah
buruh.
4.2
BENTUKMAKLUMATDANPERTIMBANGAN
Maklumat diberikan dalam bentuk RM sehari iaitu bagi tempoh lapan jam.
Kadar ini adalah termasuk 'Site Allowances', tetapi tidak termasuk kos
pengurusandankeuntungankeatasKontraktor.
39
4.0 KOSUPAHBURUH
BIL
KETERANGANKERJA
UNIT
PURATAKOSUPAHBURUHBAGI
TAHUN
2008
2009
(RM)
(RM)
*PURATAKOSUPAH
BURUH
(RM)
BarBender&Fixer
Day
72.83
74.19
74.00
BitumenWorker
Day
60.00
60.00
Bricklayer
Day
80.38
86.67
84.00
Carpenter/Joiner
Day
75.02
74.89
75.00
Chainman
Day
88.75
110.00
99.00
Concretor
Day
69.88
70.53
70.00
Concretor(Leveller/Screeder)
Day
50.00
50.00
Concretor&Greaser
Day
92.00
88.00
90.00
Drainlayer
Day
72.55
75.00
74.00
10 Driver(Lorry)
Day
72.45
73.33
73.00
11 Driver(Roller)
Day
65.00
65.00
65.00
12 Electrician
Day
80.67
85.00
83.00
13 Fitter
Day
76.85
78.33
78.00
14 Fitter/Mechanic
Day
110.00
106.67
108.00
15 Foreman
Day
87.50
100.00
94.00
16 Ganger/Chargehand(Kepala)
Day
89.71
110.82
100.00
17 Labour(Blasting)
Day
66.67
67.00
18 Labour(Female)
Day
47.79
51.00
50.00
19 Labour(General)
Day
53.66
52.27
53.00
*PurataKeseluruhan(roundedup)yangditetapkan
40
4.0 KOSUPAHBURUH
BIL
KETERANGANKERJA
UNIT
PURATAKOSUPAHBURUHBAGI
TAHUN
2008
2009
(RM)
(RM)
*PURATAKOSUPAH
BURUH
(RM)
20 Labour(Male)
Day
51.91
80.00
66.00
21 Labour(Skilled)
Day
86.00
90.50
88.00
22 Labour(Piling)
Day
60.00
60.00
23 Mason
Day
70.97
72.37
72.00
24 MetalWorker
Day
77.67
81.76
80.00
25 Operator(Blasting)
Day
112.86
113.00
26 Operator(Crane)
Day
120.00
120.00
120.00
27 Operator(HeavyPlant)
Day
85.17
92.00
89.00
28 Operator(LightPlant)
Day
73.25
76.00
75.00
29 Operator(Machine)
Day
64.00
64.00
30 Operator(MajorPlant)
Day
85.00
85.00
31 Operator(PneumaticTool)
Day
80.74
78.89
80.00
32 Operator(PortableCompactor)
Day
85.00
85.00
33 Operator/Attendant(Compresor/
Pump)
Day
55.00
55.00
34 Operator/Driver(Plant/Excavator)
Day
81.43
85.67
84.00
35 Painter
Day
76.07
81.25
79.00
36 Pavior/Plasterer
Day
75.41
75.71
76.00
37 PilingForeman
Day
158.33
200.00
179.00
*PurataKeseluruhan(roundedup)yangditetapkan
41
4.0 KOSUPAHBURUH
BIL
KETERANGANKERJA
UNIT
PURATAKOSUPAHBURUHBAGI
TAHUN
2008
2009
(RM)
(RM)
*PURATAKOSUPAH
BURUH
(RM)
38 PilingRigger
Day
82.00
82.00
39 PilingSerang
Day
65.00
65.00
40 PilingOperator
Day
119.00
140.00
130.00
41 Pipelayer
Day
70.00
75.00
73.00
42 Plant/CraneOperator
Day
80.00
80.00
80.00
43 Plasterer/Painter
Day
85.00
85.00
44 Plumber
Day
89.17
86.67
88.00
45 PneumaticDriller
Day
80.00
80.00
46 Rigger/Driller
Day
84.10
86.50
85.00
47 SoilInvestigationSupervisor
Day
125.00
140.00
133.00
48 SteelWorker
Day
71.50
70.00
71.00
49 Surveyor
Day
148.00
200.00
174.00
50 Watchman
Day
57.88
57.25
58.00
51 Welder
Day
86.91
87.5
87.00
52 Welder/OxyAcetyleneCutter
Day
78.33
80.00
79.00
*PurataKeseluruhan(roundedup)yangditetapkan
42