0% found this document useful (1 vote)
252 views4 pages

Kos Upah Buruh Pembinaan

This document provides labor costs and wage rates in Malaysian Ringgit (RM) per day for various construction jobs in Malaysia for 2008 and 2009. It lists 52 job positions and their average daily wage rates for those years, rounded to the nearest RM. The rates provided are for an 8-hour work period and include 'Site Allowances' but not management costs or contractor profits.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
252 views4 pages

Kos Upah Buruh Pembinaan

This document provides labor costs and wage rates in Malaysian Ringgit (RM) per day for various construction jobs in Malaysia for 2008 and 2009. It lists 52 job positions and their average daily wage rates for those years, rounded to the nearest RM. The rates provided are for an 8-hour work period and include 'Site Allowances' but not management costs or contractor profits.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

4.

KOSUPAHBURUH

4.1

TUJUAN
Bahagian ini mengandungi maklumat berhubung dengan kos dan kadar upah
buruh.

4.2

BENTUKMAKLUMATDANPERTIMBANGAN
Maklumat diberikan dalam bentuk RM sehari iaitu bagi tempoh lapan jam.
Kadar ini adalah termasuk 'Site Allowances', tetapi tidak termasuk kos
pengurusandankeuntungankeatasKontraktor.

39

4.0 KOSUPAHBURUH

BIL

KETERANGANKERJA

UNIT

PURATAKOSUPAHBURUHBAGI
TAHUN
2008
2009
(RM)
(RM)

*PURATAKOSUPAH
BURUH
(RM)

BarBender&Fixer

Day

72.83

74.19

74.00

BitumenWorker

Day

60.00

60.00

Bricklayer

Day

80.38

86.67

84.00

Carpenter/Joiner

Day

75.02

74.89

75.00

Chainman

Day

88.75

110.00

99.00

Concretor

Day

69.88

70.53

70.00

Concretor(Leveller/Screeder)

Day

50.00

50.00

Concretor&Greaser

Day

92.00

88.00

90.00

Drainlayer

Day

72.55

75.00

74.00

10 Driver(Lorry)

Day

72.45

73.33

73.00

11 Driver(Roller)

Day

65.00

65.00

65.00

12 Electrician

Day

80.67

85.00

83.00

13 Fitter

Day

76.85

78.33

78.00

14 Fitter/Mechanic

Day

110.00

106.67

108.00

15 Foreman

Day

87.50

100.00

94.00

16 Ganger/Chargehand(Kepala)

Day

89.71

110.82

100.00

17 Labour(Blasting)

Day

66.67

67.00

18 Labour(Female)

Day

47.79

51.00

50.00

19 Labour(General)

Day

53.66

52.27

53.00

*PurataKeseluruhan(roundedup)yangditetapkan

40

4.0 KOSUPAHBURUH

BIL

KETERANGANKERJA

UNIT

PURATAKOSUPAHBURUHBAGI
TAHUN
2008
2009
(RM)
(RM)

*PURATAKOSUPAH
BURUH
(RM)

20 Labour(Male)

Day

51.91

80.00

66.00

21 Labour(Skilled)

Day

86.00

90.50

88.00

22 Labour(Piling)

Day

60.00

60.00

23 Mason

Day

70.97

72.37

72.00

24 MetalWorker

Day

77.67

81.76

80.00

25 Operator(Blasting)

Day

112.86

113.00

26 Operator(Crane)

Day

120.00

120.00

120.00

27 Operator(HeavyPlant)

Day

85.17

92.00

89.00

28 Operator(LightPlant)

Day

73.25

76.00

75.00

29 Operator(Machine)

Day

64.00

64.00

30 Operator(MajorPlant)

Day

85.00

85.00

31 Operator(PneumaticTool)

Day

80.74

78.89

80.00

32 Operator(PortableCompactor)

Day

85.00

85.00

33 Operator/Attendant(Compresor/
Pump)

Day

55.00

55.00

34 Operator/Driver(Plant/Excavator)

Day

81.43

85.67

84.00

35 Painter

Day

76.07

81.25

79.00

36 Pavior/Plasterer

Day

75.41

75.71

76.00

37 PilingForeman

Day

158.33

200.00

179.00

*PurataKeseluruhan(roundedup)yangditetapkan

41

4.0 KOSUPAHBURUH

BIL

KETERANGANKERJA

UNIT

PURATAKOSUPAHBURUHBAGI
TAHUN
2008
2009
(RM)
(RM)

*PURATAKOSUPAH
BURUH
(RM)

38 PilingRigger

Day

82.00

82.00

39 PilingSerang

Day

65.00

65.00

40 PilingOperator

Day

119.00

140.00

130.00

41 Pipelayer

Day

70.00

75.00

73.00

42 Plant/CraneOperator

Day

80.00

80.00

80.00

43 Plasterer/Painter

Day

85.00

85.00

44 Plumber

Day

89.17

86.67

88.00

45 PneumaticDriller

Day

80.00

80.00

46 Rigger/Driller

Day

84.10

86.50

85.00

47 SoilInvestigationSupervisor

Day

125.00

140.00

133.00

48 SteelWorker

Day

71.50

70.00

71.00

49 Surveyor

Day

148.00

200.00

174.00

50 Watchman

Day

57.88

57.25

58.00

51 Welder

Day

86.91

87.5

87.00

52 Welder/OxyAcetyleneCutter

Day

78.33

80.00

79.00

*PurataKeseluruhan(roundedup)yangditetapkan