You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
A brief summary to help everyone understand this feature.
The final wave, pulling together components from every prior wave. SideBar, SearchBar, and DatePicker are the largest remaining components in source.
Migrate each to its Cube* equivalent in @bigstack-oss/cube-ui following the existing pattern: reame, split styles/utils as needed, colocated test, Storybook story, changeset.
Definition of Done (DoD)
A list of technical requirements must be met for completion. These may include, but are not limited to:
API data conforming to a specified structure.
An UI delivering defined functionalities.
Passing all unit tests.
Passing a code review.
CubeHeader migrated
CubeSideBar migrated
CubeSearchBar migrated
CubeDatePicker migrated
CubeModal migrated
CubeUpload migrated
CubeBackButton migrated
Each component has a colocated .test.tsx
Each component has a Storybook story
Each component is re-exported from src/index.ts
pnpm lint, pnpm test, and pnpm build are green
Changeset(s) added covering all 6 components for the next release
Technical Notes
A section for tech leads to to document technical risks and/or any concerns regarding the DoD.
Feature Owner:
Frontend:
Backend:
Infra:
UI/UX Mockups (Optional)
Links to design prototypes or wireframes (if applicable).
None
Output artifacts (Definition of Done)
Beyond code, docs, and config changes, completing this issue must also deliver:
Handbook knowledge update — land the durable, team-readable knowledge from this
work into the bigstack-handbook cubecos kb (kb/cubecos/…) via /bigstack-core:save-to-handbook (Topic / Runbook / Known-issue / ADR as fits).
🤖 Board reconciler applied 1 correction(s) to this ticket:
Status: Todo → Backlog(S3 — Todo means picked into a sprint; set a Planned Sprint at sizing to bring it back)
Derived from ground truth (close reason · PR state · Planned Sprint · sprint calendar). If a correction is wrong, fix that ground truth — the reconciler follows it on the next sweep.
Activity
bigstack-ci-bot commentedon Oct 11, 2026
🤖 Board reconciler applied 1 correction(s) to this ticket:
Todo→Backlog(S3 — Todo means picked into a sprint; set a Planned Sprint at sizing to bring it back)Derived from ground truth (close reason · PR state · Planned Sprint · sprint calendar). If a correction is wrong, fix that ground truth — the reconciler follows it on the next sweep.