Mridc - For MCGM Rob 27-05-2021
Mridc - For MCGM Rob 27-05-2021
December 2022)
rebuilding of
Achievement Highlights of MRIDC
MMRDA has also handed over the work of Road Over Bridges
(ROB) at several location in Mumbai suburban to MRIDC (Cost
Rs.800 Crs) (Completion date : December 2022)
Sr.
No. ROBs Location Stake Holders
skyscraper buildings.
Many Road over bridges are more than 100 years old
and have outlived its life. Few bridges are 127 years
old.
to road traffic
P2 Foundation kept
considering Railway
Substation and
Water Main Line A2 foundation
designed to cater
thorough traffic and
without disturbing
the adjacent service
A1 Foundation kept road, as well
considering structures
thorough traffic flow
and Karyalay
Building on north
side
R1P11 to R1A2 –
Foundations kept
considering water
main line at 7m
depth
R1P5 is chosen at the
best available space.
There is only one
R1P5 is chosen at the temporary structure
R1P8 – R1P10 – To best available space. mentioned as TS,
cater the sharp curve, There is only one which can be
pier location and temporary structure reinstated later
accordingly foundation mentioned as TS,
location is arranged which can be
reinstated later
Utility Survey Plan – Arthur ROB
MCGM- Arthur Road ROB
Present Looks of Arthur Road ROB
MCGM- Arthur Road ROB
Post Construction Looks of Arthur Road ROB
MCGM- Arthur Road ROB
Post Construction Looks of Arthur Road ROB
3D VIDEO
GHATKOPAR ROB
Ghatkopar ROB
Type of No. of Overall Width of Width of
Length No. of Lanes
Structure Spans Carriageway (MM) Footpath
100m+50m+50m
2 + 2 = 4 lanes 2m footpath
Cable Stayed 3 = 27000
Divided Carriageway both sides
200m
Foundation Locations and Span Arrangement –
Ghatkopar
Adani substation
OPTION 1 considered and thus Existing shops will not
be required to be
Pylon location is fixed considering foundation shifted
dismantled
existing utilities & at both sides of ROB
to cater the existing SWD
Location of the
Park is minorly
There is a cross road, infringed
span arrangement is
made such a way to
RA 1 is placed keeping in
provide access to that
mind the main entry of
road
the adjacent building
Utility Survey Plan – Ghatkopar ROB
S BRIDGE
S-Bridge
GAD Submission No. Overall
Type of
of Width of Width of
Structur Length No. of Lanes
MCGM Central & Western Railway Span Carriagewa Footpath
e
s y (MM)
1.5m
3 lanes
Cable 52m+366 footpath
- - 1 13000 single
Stayed m=418m both
carriageway
sides
Foundation Locations and Span Arrangement – S Bridge
Foundation is
kept away from
MGL Line and
underpass of
market
BEST Cables,
water pipeline
considered while
placing this
foundation
Utility Survey Plan – S-Bridge
MAHALAXMI ROB
MCGM- Mahlaxmi ROB
GAD Submission
Type of
Status Structure
2 nos new ROBs have been proposed at both sides of Mahalaxmi ROB. Due to
which, our proposal of rebuilding is in the process of finalisation along with the 2 Cable Stayed
new ROB
MCGM- Mahalaxmi ROB
Follow us on
www.maharail.com
https://www.facebook.com/maharailmridc/
https://twitter.com/Maharail_Corp
https://www.linkedin.com/in/mridc-mumbai-97ab27194/
THANK YOU
MAHARASHTRA RAIL INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED
2ND FLOOR, HOECHST HOUSE, NCPA ROAD,NARIMAN POINT, MUMBAI - 400 021