2.Importance of Materials Testing
2.Importance of Materials Testing
prior to incorporation
into the works
Presented by:
ACCEPTANCE TEST
• The results of this test shall be the basis of
acceptance of materials.
RE-TEST OR REFEREE TEST
• The results of this test shall be final.
PRE-TESTING
Pre-testing of material is applicable to materials
manufacture in bulk, such as Portland cement, asphalt, reinforcing
steel bars, etc. Arrangement shall be made with the concerned
implementing office to assign a Materials Technicians/Materials
Engineer who shall obtain the necessary samples at the plant.
If the result of the test is satisfactory, the materials
Technician/Materials Engineer, upon receipt of the test report, shall
identify the stock represented, witness the loading of the materials
and issue a Pretesting Certificate.
The material may be re-sampled at the point of
delivery at the option of the consignee especially if there are
evidences of deterioration or tampering. Otherwise, the Pretesting
Certificate shall be the basis of acceptance of the materials.
Handling and Storage of
Materials
Delivered construction materials should be placed or stored in a
safe location/place to protect from contamination or in action of
weather and to avoid damaged and to maintain the desired quality.