0% found this document useful (0 votes)
52 views31 pages

Quality Observations MEP

Quality observations in construction, MEP

Uploaded by

zali382
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views31 pages

Quality Observations MEP

Quality observations in construction, MEP

Uploaded by

zali382
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 31

NBCC (India) Limited, New Delhi

Quality Observation, Netaji Nagar

Updated Date: 10 Jan-2024


Quality Observation
Netaji Nagar
GPOA & SARTTAC
Quality Observation- SARTTAC

Water stopper not used in retaining wall. Lead


Quality Observation - SARTTAC

Both lift wall


is not equal

Lift wall is bulging (outer side)& not in line in inner


surface
Quality Observation SARTAC

Column R/f should have been terminated in Beam / Slab


In future can cause flexural /shear failure
Steel Reinforcements - GPOA

Poor stacking of reinforcement.


 Corrosion Protect Layer not provided (Cement Slurry)
 Underneath platform not provided

It will lead to corrosion.


Quality Issue - SARTTAC

Column alignment issue


May develop cause settlement in long run
Drawing Specification deviation (Fire Fighting Work)

Drawing Specification:
As per drawing, 150mm dia. Pipes to be mounted on “angle
support” along with “U bolt” but as per physical site
inspection, “Chilli Clamp” without insulation are used for
pipe mounting.

Proper
approach
Scheme for Hanging FF Pipes
Mock-up Work (Fire Fighting Work)- 1st floor-Building-3

1st Floor Mock-up:


Mock-up work also completed with Chilli clamp; post false
ceiling it will not be visible and in future low strength
support to pipeline may be a serious concern.
DBR Specification deviation (Electrical Conduiting work)

DBR Specification:
As per DBR clause 5.5 page no. 40, M.S conduit will be
used in case of wherever on the surface and above the
false ceiling.
But as per the site on the ground floor of building-3
where the temporary office is being made, PVC
conduit is used instead of GI conduit

PVC conduit used


instead of MS conduit
(Seen some locations)
Drawing Specification deviation (Lift Lobby Shaft)

Lift Lobby Pressurization Shaft


covered with Granite

Lift Lobby Pressurization Shaft Cutout covered with


Granite
Quality Observations – Plumb & Alignment Issue

 Block:-3 3rd Floor (pour-3)

 The lift wall and Blockwork are


not in line.

 Beam and Column are not in


Line.

 Gap is not Properly filled by


mortar.
Quality Observation SARTTAC

Block & column not in plumb & alignment


Quality Observation - SARTTAC

Poor /in sufficient curing of slab


Need to improve
Quality Observation - SARTTAC

Poor repair work


after Honeycombing
Quality Observation –Block-03
Location: Block-03 2nd ,3rd
& 4th floor lift share wall
(Grid-43/Q) opposite pour-
1 toilets

Observation: 250mm
(approx.) length of the
shared wall has been
dismantled, including
reinforcement cutting.

It will impact the strength


of the structure

Image after dismantling


Quality Observation :-Block-03-Facade
Location: Block-3 façade work South
facing (Ring road side)

Observation: The structural glass of


facade is not in line in horizontal
view from grid to grid.

It will impact building aesthetical


appearance.
Quality Observation :-Block-03- Lift well slab
Location: Block-3 Terrace, Slab
of Lift well (Pour-3)

Observation: The lift well top


slab has been chipped to hang
the hooks on the lift slab, which
was not installed during slab
casting.

The purpose of monolithic


construction & hook installation
missed and installing with
alternative arrangement may
impact hook integrity.
Quality Observation :-

The tape used on duct insulation going torn


way at a very early stage.
Quality Observation :-

The cutout for plumbing (Soil & Waste Water


Pipes) not properly sealed.
Quality Observation :-

Services Coordination Issue- The CPVC Pipe


not properly fixed in the chase due to electrical
conduits fixed at the back.
Quality Observation :-

The bending of CPVC Pipes laid under CI The Electrical Conduits not properly fixed
pipes due to loading of CI pipes also the socket in the chase chipped for laying the
joint given at the loading area conduit pipes.
Quality Observation :-

Sprinklers fixed just above


the electrical conduit.
Quality Observation :-

Badly damaged Duct


insulation.
Quality Observation :-

As per drawing there must be minimum 100


mm gap between Ceiling and sprinkler but at
most of the places this gap is not maintained
and even the sprinkler is touching the ceiling.
Quality Observation :-

Leakage from Slab, water is


dropping out.
Quality Observation :-
Procedure to be
followed
Quality Practice
 Method statement for work execution & repair work too
 Quality Check List
 Check List- Pre execution
 Check List- During execution
 Check List- Post execution
 Assure to provide sufficient supervision by contractor
 Ensuring Field quality plan implementation
 Regular quality audit (SOR / NCR closure)– internal & external
 Design coordination – RCP, HOTO among discipline, periodic visit by architectural/ structural
team, etc.
Other points
 Material inspection procedure
 IMIR / MTC / Lab Report

You might also like