14 Change Management
14 Change Management
Change
Control
Learning Objectives
3
Change Management
Plan
Defined as
During execution & monitor control
processes, set of project management
activities executed to manage and
control the change.
Change Management Plan
• Each knowledge areas has a separate processes for change management plan
• Proactively look for necessary change before have a major negative impact on
project. 5
Defect Preventive
Repair Action
Corrective
Action
Preventive Action
• An intentional activity that ensures the future performance of the project work is aligned
with the project management plan
• Dealing with anticipated or possible deviations
• Reviewed , approved and Rejected
• Can be implemented anytime and in any processes
• Methods
• Avoiding the repeating problems again
• Changing the resources
• Training
Corrective Action
• An intentional activity that realigns the performance with the project management plan
• Reviewed , Approved , Rejected and Deferred
• Any action taken to bring expected future project performance
• Dealing with actual deviations from the PM baseline
• Performance measurement baseline, project management plan, including acceptable
variances helps to identify the variance and corrective required
• Undertaken to adjust the performance within the project baselines. But do not change the
base lines.
If the work activity takes longer than planned , Request corrective action
• Continuously monitor
PMP® 6th Edition Exam Preparatory Program
Change Request
Defect Repair
• An intentional activity to modify a nonconforming product or product component
• Another way of ‘’ rework’’
• Requested when Component of the project does not meet specifications
• Reviewed, Rejected, approved and Deferred
• The project manager required to facilitate the change related decisions to change control
board
• Review and analysis of change requests are done by the CCB
• The board may either approve or reject a change request.
• Board can include multiple stakeholders
• Customers
• SME
• Sponsors
• Functional Managers
• Project manager
• If the adjustments will not correct the deviations, request to change the baseline
must be necessary
• Corrective Action
• Preventive Action
• Defect Repair
• Project document
• Used by the project team to log and track change requests throughout the life of the
project
• Output of ‘’ Perform Integrated Control Process’’
• Request for baseline change will be evaluated and approved by ‘’ perform integrated change
control process’’
• Deviation from baseline caused because of incomplete risk identification and risk
management
21
• So, the project manager must Review the Project risk management process.
PMP® 6th Edition Exam Preparatory Program
Change Control Systems
• A set of procedures that describes how modifications to the project deliverables and
documentation are managed and controlled
• The change control system outlines
• Hoe change request will be submitted
• The process for evaluating change request
• Who should sit on the change control board
• Levels of authority for approving changes
ADD A FOOTER 22
• Component of PMIS
• Part of an EEF
• Subset of Configuration management
systems
• It includes
• Processes
• Procedures
• Standardized forms
• Reports
• Change Tracking Tool
ADD A FOOTER 23
Configuration Management
• Focused on identifying, documenting and controlling changes to the project and the
project baselines.
• Configuration identification
• Configuration verification
• Configuration Audit
ADD A FOOTER 27
Configuration Management
System
• A set of procedures used to track project artifacts and monitor and control changes to
artifacts.
• Defines
• those items that are configurable,
• those require formal change control, and
• the process for controlling changes to such items.
Defect Repair
Impact • Constraints
Analysis
Product / Services
Update PMP /
Process PD
Identify • Scheduled
Options Compression
Direct & Manage Project Work
Control Quality / Control
Discuss Procurements
with Implement ACR
Sponsor
CCB
Inform
Rejected Revise Stakeholders
ACR
32