0% found this document useful (0 votes)
7 views

Group 1 V

Uploaded by

hhuggingman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

Group 1 V

Uploaded by

hhuggingman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 51

PROJECT

COST
SYNTHETIS
GROUP 1
CUSHION,
INTRODUCTIO RAFT AND
N BEAM
FOUNDATION

STRUCTURAL
COLUMN AND
COLUMN AND
BEAM
LINTEL

Program
STAIRS AND CONCLUSION
SLAB

Titre de la présentation
Titre de la présentation 2
Introduction
The objective of this group project is to
carry out practical training on the
calculation of the overall cost of a
construction project. Under the direction
of the group leader, Ouattara Kouamé
Alan, the different tasks were divided
among the members of the team in order
to carry out this project.The realization of
the Excel file will be supported by Soro
Nicanor, while Ouattara Kouamé will make
the PowerPoint presentation and assume
the role of group leader. Coulibaly
Vamoussa and Kouamé Kouadio will be
responsible for the design of the
construction project on the Glodon
software.The specific calculations will be
distributed as follows:- Calculation of the
volume of cleanliness concrete, floor and
foundation beams: Soro Nicanor-
Calculation of the reinforcement of the
foundation beams and the floor: Soro
Nicanor-
Titre de laCalculation
présentation of the reinforcement 3
of the floor and foundation beams:
Introduction
Sullivan- Calculation of the reinforcement
of beams and poles: Ouattara Kouamé,
Gakpa Serge and Sullivan- Calculation of
the reinforcement and volume of concrete
of structural columns: Coulibaly-
Calculation of the volume and
reinforcement of the lintels: Coulibaly-
Calculation of the volume and
reinforcement of the staircase: Yamontché
Aristide and Kouamé Kouadio- Calculation
of the volume and reinforcement of the
slabs of the first and second floors:
Coulibaly Vamoussa, Kouamé KouadioThis
project will allow students to gain
practical experience in calculating the
overall cost of a construction project,
using the appropriate tools and methods.3

Titre de la présentation 4
CUSHION
CONCRETE
It’s a layer of lean concrete spread at
the bottom of the excavations in order
to obtain a clean work surface.

To calculate it, simply use the


following formular :
Length * width * thickness
RAFT FOUNDATION
CONCRETE

The raft is a reinforcement concrete slab at


least 150 millimeters thick intended to be
the basis of a future construction.

In our case, the raft has a complex form


To facilitate the calculation, we have divided it
into two simple volumes : a rectangle and a
cube.
Length * width * thickness for the
rectangular
( S1 + S2 + ) * for the cube
RAFT
FOUNDATION
REINFORCEMENT

7
13600 18
8 0,2
0,2 8
18

13900

X TOP Length=12*18+180,28+13600+180,28+12*18 = 14392,56 mm

X TOP Number=((6800+200+180,28*2)/150)+1=51

Y TOP Length= 6800+200+180,28*2+2*12*18 = 7792,56 mm

Y TOP Number=((13400+200+180,28*2)/150)+1= 95
13600 18
8 0,2
0,2 8
18

13900

X BOTTOM Length=13400+200+300-80+2*12*18 = 14252 mm

X BOTTOM Number=((6800+200+300)/150)+1= 50

Y BOTTOM Length=6800+200+300-80+2*12*18 = 7652 mm

Y BOTTOM Number=((13400+200+300)/150)+1= 94
13600 18
8 0,2
0,2 8
18

13900

X NEGATIVE Length=1100+500+100+150-40= 1810 mm

X NEGATIVE Number=((6800+200+300-80)/150)+1= 50

Y NEGATIVE Length==1100+500+100+150-40= 1810 mm

Y NEGATIVE Number=((13400+200+300)/150)+1= 94
BEAM FOUNDATION
CONCRETE

As it’s name says it’s a beam that’s, used


to distribute the loads supported towards
the supports.
To calculate it, simply use the following
formular :
Length * surface of the section
RAFT
FOUNDATION
REINFORCEMENT

12
500 2850 400 5900 400 2850 500

6 25
A A
2 25 2 25
B Ln/3 Ln/3
B Ln/3 Ln/3

C 6 25 C

JZL1
500 2850 400 5900 400 2850 500

6 25
A A
2 25 2 25
B Ln/3 Ln/3
B Ln/3 Ln/3

C 6 25 C

13320 x
13400 - 2*40
A 375 375 6
3316,6 x JZL1
B (2850/3)+400+(5900/3)
7 4

C 375 13320 375


13400 - 2*40 x
6
500 2850 400 5900 400 2850 500

14 6 20 21 8 20 6 14

1,5*500 1,5*500 1,5*500 6 25 1,5*500 1,5*500 1,5*500

2 25 2 25
B Ln/3 Ln/3
B Ln/3 Ln/3
2 25
6 25

1-1 2-2 3-3 4-4 5-5 6-6 7-7


Length: =(2*(420+420)+2*11,9*12)+(2*(74,2+49+420)+2*11,9*12)*2= 4709,6 JZL1

Number: 14+6+20+21+20+6+14=101
Unit mass: 0,888 kg/m
Unit mass: 2*4,71*101*0,888= 844,7892 kg
Column

KZ1 , KZ2 and KZ3

16
KZ1 , KZ2 and KZ3
CONCRETE
• Section : kz1 : 500 *500 mm ; kz2 : 400*500 mm : kz3 : 400*400 mm
• Lengh : to find the heigth , we subtract from the foundation slope (-1500) the thickness of the
cushion form wich is 500 and we obtain -1000 ; taking account the heigth of the first floor wich is
3550 mm we end up with the height of column :
• 3550-(-1000)=4550mm = 4,5 m
• Volume kz1 = (0,5 *0,5*4,5 )*4= 4,5 m³
• Volume KZ2 = ( 0,4*0,5*4,5)*4 = 3,64 m³
• Volume KZ3 = ( 0,4*0,4*4,5)*2= 1,456 m³
Calcul of
reinforcem
ent of the
column
A R I S T I D E YA M O N TC H E
Longitudinal
es bars
• KZ3
• Length(m): 2x12x0,018+(-
0,02)+0,46+12x2x0,018
• Number: 12
Length:
((360x2x2)+2x11,9
x8+2x((142,7+360)
x2+2x11,9x8))

Nombres 66
Theoretical mass :
0,395
STIRRUP
BEAM

Titre de la présentation 21
500 2850 400 5900 400 2850 500

2 25
150 2 12 150
2 25 2 25
Ln/3 Ln/3
2 25 2 25
Ln/4 Ln/4 Ln/4 Ln/4
2 25
4 25

KL3
500 2850 400 5900 400 2850 500

2 25
A 2 25
150 2 12 150 2 25 A
B B
C Ln/3 Ln/3 C
2 25 2 25 D
D Ln/4 Ln/4 Ln/4 Ln/4
E 2 25
E
F 4 25 F

13360 x
13400 - 2*20
A 375 375 2 KL3
2266,6 5900-2*(5900/3)+2*150
x
B 7 2
5696,6
7 500+2850+400+(5900/3)-20 x
C 375
4
2587,5 (2850/4)+400+(5900/4)
D x
6660 400+5900+400-2*40 4
E x
2
F 375 13360 375
13400 - 2*20 x
4
500 2850 400 5900 400 2850 500

8 6 8 8 21 8 8 6 8

1,5*500 1,5*500 1,5*500 2 25 1,5*500 1,5*500 1,5*500


2 25 2 12 2 25
2 25 2 25
2 25
4 25

1-1 2-2 3-3 4-4 5-5 6-6 7-7


Length: ((+16+25+500-40)*2+2*11,9*8)= 3155mm

Number: 8+6+8+8+21+8+8+6+8=81
Unit mass: 0,395 kg/m
Unit mass: 3,155*81*0,395= 100,95 kg
STRUCTURAL
COLUMN

Titre de la présentation 25
• Elément: GZ1 240x370 ( first floor)

• Grade: C20

• Couche protectrice : 15 mm

• Steel:
 CONCRETE :

• Surface = 240x370+(240+2x370)+0,03
=0,1182 m2

• Length= 3,55 m-0,5 m+1 m = 4,05 m

• Volume= 0,47871 m3
 STEEL:
o Longitudinal bars:
- Number = 4
- Unit length = 4050 + 10 x 12 = 16,68 m
- Mass = 4 x 16,68 x 0,888
= 59,24736 kg

o Stirrups:
- Number = = 21,25 ≈ 21
- Unit length = 2 x (240+370) – 8 x 15 + 2 x 11,9 x 6 = 1,24 m

- Mass = 21 x 1,24 x 0,222


=5,78088 kg

o Total mass:
= 59,24736 + 5,78088
= 65,02824 kg
LINTEL
EXAMPLE : GL2

29
GL2 Lintel

• SECTION :370*180 mm
CONCRETE
L = width of window opening + 250 on each side
L1 = Lc1 +250*2=1500+500= 2000 mm
L2 = Lc2 +250*2=1800+500 = 2300 mm
• V = Section * Lenght
• V1=(0,37*0,18*2)*4= 0,532 mm3
• V2=( 0,37*0,18*2,3)= 0,153 mm3
• V=V1+V2= 0,532+0,153 =0,685 mm
GL2 Lintel
REINFORCEMENT
• Calcution for stirrup : Ø6
L = (370-20*2 +180-20*2)*2+ 11,9*2*6 = 1,08 m
FOR C1
Number : (2000/150)+1 =14,33 = 15
Unit Mass = 0,222 kg/m
Mass = (1,08*15*0,222)*4 =14,39 Kg
FOR C2
Number : ( 2300/150) +1 = 16,33 =17
Unit Mass = 0,222 kg/m
Mass =( 1,08*17*0,222) = 4,08 kg
GL2 Lintel
• Longitudinal Bar :
• FOR C1
• Ø12
• L = 2000-20*2 = 1,96 m
• Number : 2
• Unit Mass =0,888 kg/m
• Mass =( 1,96*2*0,888)*4 = 13,92 kg
Ø14
L= 2000-20*2 = 1,96 m
Number =4
Unit Mass = 1,21 kg/m
Mass = (1,96*4*1,21)*4 =13,92 kg
GL2 Lintel
• FOR C2
• Ø12
• L= 2300-20*2= 2,26 mm
• Number =2
• Unit Mass = 0,888 kg/m
• Mass = 2,26*2*0,888 =4,01 kg
Ø14
L=2300-20*2=2,26 mm
Number = 2
Unit Mass =1,21 kg / m
Mass = 2,26*2*1,21 = 10,94 kg
Part I
Volume: ((3,27x0,1)+
((0,27x0,18x9)/2))x1200

Part II
Volume: ((3,27*0,1)+
((0,27x0,18x9)/2)+(0,3x0,1)

Concrete Palier de repos


(0,9x1,95)x0,1
stairs
In order to calculate the mass of the steel in
STAIRS the stairs divided its structure into two parts:

REINFORCE (1) The landing

MENT
MASS (2) The stairway
LANDING

STAIRS We divided the landing into two parts:

REINFORCE (1) BEAM

LONGITUDINAL BARS:

MENT NUMBER: 6
LENGTH: (2*1020+120) - 2*20 + 2*15*20 = 2760mm
TOTAL LENGTH= 6*2,76= 16,56 m

MASS THEORETICAL MASS= 2,47KG/m

MASS = 2,47*16,56 = 40,90 KG

STIRRUPS:
NUMBER: E(2160 -40)/200 + 1)= 12
LENGTH: ((240- 40)+(400-40))*2+2*11,9*8 = 1,31 m
THEORETICAL MASS= 0,395KG/m
MASS = 12*1,31*0,395 = 6,21KG

TOTAL STEEL MASS: 6,21 + 40,9 = 47,11 KG


LANDING

STAIRS We divided the landing into two parts:

REINFORCE (1) BEAM TL1

LONGITUDINAL BARS:

MENT NUMBER: 6
LENGTH: (2*1020+120) - 2*20 + 2*15*20 = 2760mm
TOTAL LENGTH= 6*2,76= 16,56 m

MASS THEORETICAL MASS= 2,47KG/m

MASS = 2,47*16,56 = 40,90 KG

STIRRUPS:
NUMBER: E(2160 -40)/200 + 1)= 12
LENGTH: ((240- 40)+(400-40))*2+2*11,9*8 = 1,31 m
THEORETICAL MASS= 0,395KG/m
MASS = 12*1,31*0,395 = 6,21KG

TOTAL STEEL MASS: 6,21 + 40,9 = 47,11 KG


LANDING

STAIRS We divided the landing into two parts:

REINFORCE (1) BEAM TL1

LONGITUDINAL BARS:

MENT NUMBER: 6
LENGTH: (2*1020+120) - 2*20 + 2*15*20 = 2760mm
TOTAL LENGTH= 6*2,76= 16,56 m

MASS THEORETICAL MASS= 2,47KG/m

MASS = 2,47*16,56 = 40,90 KG

STIRRUPS:
NUMBER: E(2160 -40)/200 + 1)= 12
LENGTH: ((240- 40)+(400-40))*2+2*11,9*8 = 1,31 m
THEORETICAL MASS= 0,395KG/m

MASS = 12*1,31*0,395 = 6,21KG

TOTAL STEEL MASS: 6,21 + 40,9 = 47,11 KG


LANDING

STAIRS (2) THE SLAB

REINFORCE TOP BARS:


X:
NUMBER: : E(2160 -2*15)/150 + 1)= 22

MENT mm
LENGTH: 1020 – 2*15*2 + 15*10 + 100 = 1240

THEORETICAL MASS= 0,617KG/m

MASS MASS = 0,617*15*1,24 = 15,34 KG


Y:
NUMBER: : E(1020 -2*120)/150 + 1)= 6
LENGTH: 2160 – 2*15*3 + 100*2 = 2270 mm
THEORETICAL MASS= 0,617KG/m
MASS = 0,617*6*2,27 = 8,52KG

TOTAL TOP STEEL MASS: 8,52 + 15,34 =23,86KG


LANDING

STAIRS (2) THE SLAB

REINFORCE BOTTOM BARS:


X:
NUMBER: : E(2160 -2*15)/100 + 1)= 22

MENT LENGTH: 1020 – 2*15*3 + 2*100 = 1130mm


THEORETICAL MASS= 0,617KG/m
MASS = 0,617*22*1,13 = 15,34 KG

MASS Y:
NUMBER: : E(1020 -2*20)/150 + 1)= 10
LENGTH: 2160 – 2*15*3 + 100*2 = 2270 mm
THEORETICAL MASS= 0,617KG/m
MASS = 0,617*10*2,27 = 14KG

TOTAL BOTTOM STEEL MASS: 14 + 15,34 = 29,34KG

TOTAL SLAB STEELBARS MASS= 20+29,34 = 49,34


KG
STAIRWAY

STAIRS TOP BARS:


LONGITUDINAL:

REINFORCE NUMBER: : E(1020 -2*20)/100 + 1)= 10


LENGTH: (15*12+0,6*40*12)*2 +
9*sqrt(180²+270²)

MENT = 3,86 m
THEORETICAL MASS= 0,888KG/m
MASS = 0,888*10*3,86 = 34,28 KG

MASS CROSS-BARS:
NUMBER: : E(9*sqrt(180²+270²)/150 + 1)= 20
LENGTH: 1020 – 2*20 = 980 mm
THEORETICAL MASS= 0,617KG/m
MASS = 0,617*20*0,98= 12,09KG

TOTAL TOP STEEL MASS: 34,28 + 12,09 = 46,37KG


STAIRWAY

STAIRS BOTTOM BARS:


LONGITUDINAL:

REINFORCE NUMBER: : E(1020 -2*20)/150 + 1)= 7


LENGTH: 2*max(5*12 ; 120*(180/270))+
9*sqrt(180²+270²)

MENT =3m
THEORETICAL MASS= 0,888KG/m
MASS = 0,888*7*3 = 18,65 KG

MASS CROSS-BARS:
NUMBER: : E(9*sqrt(180²+270²)/150 + 1)= 20
LENGTH: 1020 – 2*20 = 980 mm
THEORETICAL MASS= 0,617KG/m
MASS = 0,617*20*0,98= 12,09KG

TOTAL BOTTOM STEEL MASS: 18,65+12,09= 30,74KG

TOTAL STAIRWAY STEEL : 46,37 + 30,47 = 76,84KG

NB/ Because we have two stairways we multiply by two this


mass value
STAIR REINFORCEMENT MASS

STAIRS TOTAL STAIR STEELBARS MASS=BEAM STEEL


MASS+ LANDING SLAB STEEL MASS+ STAIRWAY

REINFORCE STEEL MASS*2= 47,11+49,34+2*76,84=250,13KG

MENT
MASS
SLAB In order to calculate the volume (V) of the
VOLUME concrete in a given slab we need two major
datas:
(1) THE AREA OF THE SLAB (A)
(2) THE THICKNESS OF THE SLAB (H)

Then we simply multiply these two values

V=A*H
SLAB
VOLUME

x
SLAB
VOLUME A= (3300 - 2*120)(6300 – 2*120)= 18,54 m²

H=0,1m

V= 0,1*18,54=1,86m³
SLAB
REINFORCEMENT

Titre de la présentation 47
• Elément: LB1 ( first floor)

• Grade: C25

• Couche protectrice : 15 mm

• Steel:

-Bottom reinforcements : X :Ø12@150 ; Y :Ø10@200

-negative reinforcements : 1: Ø8@150 /800 mm ;


2: Ø8@150 /900 mm

-repartition reinforcements: Ø8@200


 BOTTOM
REINFORCEMENTS:
• X:
- Number =

=40,4≈ 41
-unit length = 3300 - 2 x 120 + max(5 x d, ) + max(5 x d, )
= 3300 – 240 + +
= 3,365 m
• Y:
- Number =
=15,3 ≈ 16
-unit length = 6300 - 2 x 120 + 2 x max(5 x d, )
= 6300 – 240 +
=6,43 m

Mass = 3,365 x 41 x 0,888 + 6,43 x 16 x 0,617

= 185,99 kg
 TOP REINFORCEMENTS
( C-A) :
• NEGATIVE REINFORCEMENTS :

- Number =
=38,66≈ 39

-unit length = 800+35 x d


= 800 + 35 x 8
= 1,08 m

• DISTRIBUTION REINFORCEMENTS :
- Number = = 4

-unit length = 6300 – 2 x 120 – 2 x 800


= 4,46

Mass = 1,08 x 39 x 0,395 +4,46 x 4 x 0,395

= 23,684 kg
THANK YOU