Group 1 V
Group 1 V
COST
SYNTHETIS
GROUP 1
CUSHION,
INTRODUCTIO RAFT AND
N BEAM
FOUNDATION
STRUCTURAL
COLUMN AND
COLUMN AND
BEAM
LINTEL
Program
STAIRS AND CONCLUSION
SLAB
Titre de la présentation
Titre de la présentation 2
Introduction
The objective of this group project is to
carry out practical training on the
calculation of the overall cost of a
construction project. Under the direction
of the group leader, Ouattara Kouamé
Alan, the different tasks were divided
among the members of the team in order
to carry out this project.The realization of
the Excel file will be supported by Soro
Nicanor, while Ouattara Kouamé will make
the PowerPoint presentation and assume
the role of group leader. Coulibaly
Vamoussa and Kouamé Kouadio will be
responsible for the design of the
construction project on the Glodon
software.The specific calculations will be
distributed as follows:- Calculation of the
volume of cleanliness concrete, floor and
foundation beams: Soro Nicanor-
Calculation of the reinforcement of the
foundation beams and the floor: Soro
Nicanor-
Titre de laCalculation
présentation of the reinforcement 3
of the floor and foundation beams:
Introduction
Sullivan- Calculation of the reinforcement
of beams and poles: Ouattara Kouamé,
Gakpa Serge and Sullivan- Calculation of
the reinforcement and volume of concrete
of structural columns: Coulibaly-
Calculation of the volume and
reinforcement of the lintels: Coulibaly-
Calculation of the volume and
reinforcement of the staircase: Yamontché
Aristide and Kouamé Kouadio- Calculation
of the volume and reinforcement of the
slabs of the first and second floors:
Coulibaly Vamoussa, Kouamé KouadioThis
project will allow students to gain
practical experience in calculating the
overall cost of a construction project,
using the appropriate tools and methods.3
Titre de la présentation 4
CUSHION
CONCRETE
It’s a layer of lean concrete spread at
the bottom of the excavations in order
to obtain a clean work surface.
7
13600 18
8 0,2
0,2 8
18
13900
X TOP Number=((6800+200+180,28*2)/150)+1=51
Y TOP Number=((13400+200+180,28*2)/150)+1= 95
13600 18
8 0,2
0,2 8
18
13900
X BOTTOM Number=((6800+200+300)/150)+1= 50
Y BOTTOM Number=((13400+200+300)/150)+1= 94
13600 18
8 0,2
0,2 8
18
13900
X NEGATIVE Number=((6800+200+300-80)/150)+1= 50
Y NEGATIVE Number=((13400+200+300)/150)+1= 94
BEAM FOUNDATION
CONCRETE
12
500 2850 400 5900 400 2850 500
6 25
A A
2 25 2 25
B Ln/3 Ln/3
B Ln/3 Ln/3
C 6 25 C
JZL1
500 2850 400 5900 400 2850 500
6 25
A A
2 25 2 25
B Ln/3 Ln/3
B Ln/3 Ln/3
C 6 25 C
13320 x
13400 - 2*40
A 375 375 6
3316,6 x JZL1
B (2850/3)+400+(5900/3)
7 4
14 6 20 21 8 20 6 14
2 25 2 25
B Ln/3 Ln/3
B Ln/3 Ln/3
2 25
6 25
Number: 14+6+20+21+20+6+14=101
Unit mass: 0,888 kg/m
Unit mass: 2*4,71*101*0,888= 844,7892 kg
Column
16
KZ1 , KZ2 and KZ3
CONCRETE
• Section : kz1 : 500 *500 mm ; kz2 : 400*500 mm : kz3 : 400*400 mm
• Lengh : to find the heigth , we subtract from the foundation slope (-1500) the thickness of the
cushion form wich is 500 and we obtain -1000 ; taking account the heigth of the first floor wich is
3550 mm we end up with the height of column :
• 3550-(-1000)=4550mm = 4,5 m
• Volume kz1 = (0,5 *0,5*4,5 )*4= 4,5 m³
• Volume KZ2 = ( 0,4*0,5*4,5)*4 = 3,64 m³
• Volume KZ3 = ( 0,4*0,4*4,5)*2= 1,456 m³
Calcul of
reinforcem
ent of the
column
A R I S T I D E YA M O N TC H E
Longitudinal
es bars
• KZ3
• Length(m): 2x12x0,018+(-
0,02)+0,46+12x2x0,018
• Number: 12
Length:
((360x2x2)+2x11,9
x8+2x((142,7+360)
x2+2x11,9x8))
Nombres 66
Theoretical mass :
0,395
STIRRUP
BEAM
Titre de la présentation 21
500 2850 400 5900 400 2850 500
2 25
150 2 12 150
2 25 2 25
Ln/3 Ln/3
2 25 2 25
Ln/4 Ln/4 Ln/4 Ln/4
2 25
4 25
KL3
500 2850 400 5900 400 2850 500
2 25
A 2 25
150 2 12 150 2 25 A
B B
C Ln/3 Ln/3 C
2 25 2 25 D
D Ln/4 Ln/4 Ln/4 Ln/4
E 2 25
E
F 4 25 F
13360 x
13400 - 2*20
A 375 375 2 KL3
2266,6 5900-2*(5900/3)+2*150
x
B 7 2
5696,6
7 500+2850+400+(5900/3)-20 x
C 375
4
2587,5 (2850/4)+400+(5900/4)
D x
6660 400+5900+400-2*40 4
E x
2
F 375 13360 375
13400 - 2*20 x
4
500 2850 400 5900 400 2850 500
8 6 8 8 21 8 8 6 8
Number: 8+6+8+8+21+8+8+6+8=81
Unit mass: 0,395 kg/m
Unit mass: 3,155*81*0,395= 100,95 kg
STRUCTURAL
COLUMN
Titre de la présentation 25
• Elément: GZ1 240x370 ( first floor)
• Grade: C20
• Couche protectrice : 15 mm
• Steel:
CONCRETE :
• Surface = 240x370+(240+2x370)+0,03
=0,1182 m2
• Volume= 0,47871 m3
STEEL:
o Longitudinal bars:
- Number = 4
- Unit length = 4050 + 10 x 12 = 16,68 m
- Mass = 4 x 16,68 x 0,888
= 59,24736 kg
o Stirrups:
- Number = = 21,25 ≈ 21
- Unit length = 2 x (240+370) – 8 x 15 + 2 x 11,9 x 6 = 1,24 m
o Total mass:
= 59,24736 + 5,78088
= 65,02824 kg
LINTEL
EXAMPLE : GL2
29
GL2 Lintel
• SECTION :370*180 mm
CONCRETE
L = width of window opening + 250 on each side
L1 = Lc1 +250*2=1500+500= 2000 mm
L2 = Lc2 +250*2=1800+500 = 2300 mm
• V = Section * Lenght
• V1=(0,37*0,18*2)*4= 0,532 mm3
• V2=( 0,37*0,18*2,3)= 0,153 mm3
• V=V1+V2= 0,532+0,153 =0,685 mm
GL2 Lintel
REINFORCEMENT
• Calcution for stirrup : Ø6
L = (370-20*2 +180-20*2)*2+ 11,9*2*6 = 1,08 m
FOR C1
Number : (2000/150)+1 =14,33 = 15
Unit Mass = 0,222 kg/m
Mass = (1,08*15*0,222)*4 =14,39 Kg
FOR C2
Number : ( 2300/150) +1 = 16,33 =17
Unit Mass = 0,222 kg/m
Mass =( 1,08*17*0,222) = 4,08 kg
GL2 Lintel
• Longitudinal Bar :
• FOR C1
• Ø12
• L = 2000-20*2 = 1,96 m
• Number : 2
• Unit Mass =0,888 kg/m
• Mass =( 1,96*2*0,888)*4 = 13,92 kg
Ø14
L= 2000-20*2 = 1,96 m
Number =4
Unit Mass = 1,21 kg/m
Mass = (1,96*4*1,21)*4 =13,92 kg
GL2 Lintel
• FOR C2
• Ø12
• L= 2300-20*2= 2,26 mm
• Number =2
• Unit Mass = 0,888 kg/m
• Mass = 2,26*2*0,888 =4,01 kg
Ø14
L=2300-20*2=2,26 mm
Number = 2
Unit Mass =1,21 kg / m
Mass = 2,26*2*1,21 = 10,94 kg
Part I
Volume: ((3,27x0,1)+
((0,27x0,18x9)/2))x1200
Part II
Volume: ((3,27*0,1)+
((0,27x0,18x9)/2)+(0,3x0,1)
MENT
MASS (2) The stairway
LANDING
LONGITUDINAL BARS:
MENT NUMBER: 6
LENGTH: (2*1020+120) - 2*20 + 2*15*20 = 2760mm
TOTAL LENGTH= 6*2,76= 16,56 m
STIRRUPS:
NUMBER: E(2160 -40)/200 + 1)= 12
LENGTH: ((240- 40)+(400-40))*2+2*11,9*8 = 1,31 m
THEORETICAL MASS= 0,395KG/m
MASS = 12*1,31*0,395 = 6,21KG
LONGITUDINAL BARS:
MENT NUMBER: 6
LENGTH: (2*1020+120) - 2*20 + 2*15*20 = 2760mm
TOTAL LENGTH= 6*2,76= 16,56 m
STIRRUPS:
NUMBER: E(2160 -40)/200 + 1)= 12
LENGTH: ((240- 40)+(400-40))*2+2*11,9*8 = 1,31 m
THEORETICAL MASS= 0,395KG/m
MASS = 12*1,31*0,395 = 6,21KG
LONGITUDINAL BARS:
MENT NUMBER: 6
LENGTH: (2*1020+120) - 2*20 + 2*15*20 = 2760mm
TOTAL LENGTH= 6*2,76= 16,56 m
STIRRUPS:
NUMBER: E(2160 -40)/200 + 1)= 12
LENGTH: ((240- 40)+(400-40))*2+2*11,9*8 = 1,31 m
THEORETICAL MASS= 0,395KG/m
MENT mm
LENGTH: 1020 – 2*15*2 + 15*10 + 100 = 1240
MASS Y:
NUMBER: : E(1020 -2*20)/150 + 1)= 10
LENGTH: 2160 – 2*15*3 + 100*2 = 2270 mm
THEORETICAL MASS= 0,617KG/m
MASS = 0,617*10*2,27 = 14KG
MENT = 3,86 m
THEORETICAL MASS= 0,888KG/m
MASS = 0,888*10*3,86 = 34,28 KG
MASS CROSS-BARS:
NUMBER: : E(9*sqrt(180²+270²)/150 + 1)= 20
LENGTH: 1020 – 2*20 = 980 mm
THEORETICAL MASS= 0,617KG/m
MASS = 0,617*20*0,98= 12,09KG
MENT =3m
THEORETICAL MASS= 0,888KG/m
MASS = 0,888*7*3 = 18,65 KG
MASS CROSS-BARS:
NUMBER: : E(9*sqrt(180²+270²)/150 + 1)= 20
LENGTH: 1020 – 2*20 = 980 mm
THEORETICAL MASS= 0,617KG/m
MASS = 0,617*20*0,98= 12,09KG
MENT
MASS
SLAB In order to calculate the volume (V) of the
VOLUME concrete in a given slab we need two major
datas:
(1) THE AREA OF THE SLAB (A)
(2) THE THICKNESS OF THE SLAB (H)
V=A*H
SLAB
VOLUME
x
SLAB
VOLUME A= (3300 - 2*120)(6300 – 2*120)= 18,54 m²
H=0,1m
V= 0,1*18,54=1,86m³
SLAB
REINFORCEMENT
Titre de la présentation 47
• Elément: LB1 ( first floor)
• Grade: C25
• Couche protectrice : 15 mm
• Steel:
=40,4≈ 41
-unit length = 3300 - 2 x 120 + max(5 x d, ) + max(5 x d, )
= 3300 – 240 + +
= 3,365 m
• Y:
- Number =
=15,3 ≈ 16
-unit length = 6300 - 2 x 120 + 2 x max(5 x d, )
= 6300 – 240 +
=6,43 m
= 185,99 kg
TOP REINFORCEMENTS
( C-A) :
• NEGATIVE REINFORCEMENTS :
- Number =
=38,66≈ 39
• DISTRIBUTION REINFORCEMENTS :
- Number = = 4
= 23,684 kg
THANK YOU