Auto Signal Quiz
Auto Signal Quiz
A 120m B 180m
C 150m D None of these
2.As per SR 9.02.01, after passing Auto Stop
Signal at ON position if there is any train
ahead, distance between two train shall be
A 120m B 180m
A 120m
B 180m
D None of these
4.As per GR 9.01, mid section Modified
Semi-Automatic Stop Signal is controlled
by
Station in
A rear
B Station ahead
C 00 D ____ ____00
8.As per GR 9.01, Adequate distance
beyond Auto Stop Signal in S/L
section_________
A 120m B 180m
A (600+600+10+10)m B (250+250+10)m
A T/A-912 B T/B-912
C T/C-912 D T/D-912
12.As per SR 9.12.01, during failure of all series of
signals in the automatic block System(D/L) but
communications are available. Train is sent to block
section.
A (600+600+10+10)m B (250+250+10)m
A 25 kmph for first train & normal speed for subsequent train.
A T-509
A Pilot in
A (600+600+10+10)m B (250+250+10)m
A T/A-912
B T/D-912
C Taking off Signal & Caution Order with a list of train
waiting in the section
D None of these
28.As per SR 9.12.05, working of train under Auto
Block System(D/L) during failure of the means of
communication when signals are operative, train will be
received by
A T/A-912
C T-369(3b)
A 15/10 kmph
B 15/8 kmph
C 25/10 kmph
A 5 B 3
C 2 D 4
35.What will be written authority in Automatic Block
System to receive a train?
A T/D-912 B T/369(3b)
C T/A-912 D T/D-602
36.What will be speed to be maintained by LP in
Automatic Block System during pilot in?
B 15/8 kmph
C 25/10 kmph
A T/D-912 B T/369(3b)
C T/A-912 D T/D-602
38.What will be speed to be maintained by LP in
Automatic Block System during pilot out?
B 15/8 kmph
C 25/10 kmph
D a),b) & c)
40.As per GR 9.15, during passing Gate Stop Signal at
ON position with 'A' marker illuminated previously, LP
pass the signal at 'ON'
B Stop the train before Gate Signal wait 01min by day & 02 min
at night & then proceed with normal speed
C Stop the train before Gate Signal, wait 01 in by day &02 min
at night & then proceed with 15/10 kmph
B Stop the train before Gate Signal wait 01 min by day & 02min
at night & then proceed with normal speed
C Stop the train before Gate Signal, wait 01min by day & 02min
at night & then proceed with 15/10 kmph upto level crossing
C T/369(3b)
D None of these
45.What is the authority to pass Starter Signal( Not LSS) at
ON position in Auto Block System
A 1.Written Authority(T/A-912)
2)Calling On Signal
3)Illuminated ‘A’ marker
B 1)Written Authority(T/369(3b))
2)Calling On Signal
3)Illuminated ‘A’ marker
D 1)Calling On Signal
2)Illuminated ‘A’ marker
46.What is the authority to pass Advance Signal (LSS)
at ON position in Auto Block System where intervening
signals are provided.
A 1.Written Authority(T/A-912)
2)Illuminated ‘A’ marker
B 1)Written Authority(T/369(3b))
2)Illuminated ‘A’ marker
B 1)Written Authority(T/369(3b))
2)Taking OFF Shunt Signal
C 1)Written Authority/369(3b))
2)Obtaining Pvt no over Signal Post Telephone
3)Calling on signal
4) Advanced Authority (T/369(1))
D None of these
49.What is the authority to pass Starter Signal (Not
LSS) at ON position in auto Block System
A 1) Written Authority(TA/912)
2)Calling On Signal
3) Illuminated marker
B 1)Written Authority(T/369(3b))
2)Taking off Shunt Signal
D Calling On Signal
50.What is the authority to pass starter Signal (Not
LSS) at ON position in Auto Block System
A 1)Written Authority(TA/912)
2)Calling On Signal
3) Illuminated marker
B 1)Written Authority(T/369(3b))
2)Taking off Shunt Signal
D Shunt Signal
51.As per SR 9.12.07, during working of trains on
Automatic Block System(S/L) during panel suspension
& direction of traffic cannot be established but
communication is available, LP will get authorities
A 25 KMPH for first train & normal speed for subsequent train