Understanding 6 Sigma
Understanding 6 Sigma
Contents
6s
What is 6s activity? Why should we do 6s? How to Launch 6s ? 6s Project Road Map
6s
USL
(Upper Spec Limit)
Measure 10 samples
(Spec. : 1004) LSL
Total inspection is impossible !
(Lower Spec Limit)
Population
N 1,000
Sample
Statistical variables (mean, variance) estimate population 96
97 98
You may say This Population is Good because all the samples data are located between LSL & USL. BUT, If you estimate the defect rate using statistical analysis, this population has the probability of 2.8% defects per unit. Then this is - we call - An epidemic quality defect level. Measuring defect rate on process through an expanding statistical concept, we can use measuring process capability.
6s
Object of 6s is
Shift to Target
T
USL USL
USL
USL
Shift to Target
Reducing variation
Reducing Variation
6s
Target
USL
3s
-3s
+3s
6s Quality means that area of the estimated normal distribution is located between USL&LSL with 6 s.
In that case area of the outlier spec. (In other words estimated defects) is just 3.4 PPM.
3.4ppm
6s
-6s
+6s
* s : Standard Deviation Statistic index measures how much is data apart from target value
6s
s 6 5 4 3 2
1 misspelled word in all of the books contained in a small library $340 indebtedness per $100 millions assets 1.8 minutes per year
66,807 308,537
$6.7 millions indebtedness per $100 millions assets 24 days per year
6s
6s as the Activity
What is 6s activity?
In all Design, Manufacturing, and SVC processes
Applying for 6s statistic Tools & Processes To find factors causing defects Acting the Analysis and Improvement Through the Defect Reduction, Increase Yield & Total Customer Satisfaction Management Innovation Tool contributes to Management Output
6s
Wall of 5s
Bulk of Fruit Process Characterization and Optimization
Wall of 4s
Low Hanging Fruit Seven Basic Tools
Wall of 3s
Ground Fruit Logic and Intuition
6s
6s is a tool that applies to all business systems - Design, Manufacturing, Sales and SVC
Design Design 6s Mfg.
Sales &SVC
R&D 6s
Mfg.
Transaction 6s
6s
**
1. Who are your customers? - Internal / External 2. What do you provide your customers? 3. What is critical to quality for your customers? 1. What are your internal processes for providing your product or service CTQs to your customers? 2. Where do defects occur in these processes? Practical Problem Measurement System Yield Calculation Process Mapping s Calculation
M A
Benchmarking Cause & Effect Diagram Hypothesis Testing DOE Brainstorming Action Workout Techniques Piloting
I C
Procedures
* CTQ(Critical To Quality) : Your customers feel that characteristic of product, service or process is critical. ** D : Define
6s
By Improvement Process
Measure Others
- Symptoms - Frequency
Analysis
Improvement
Control
- Control by control chart - Process 4M control
- Present con- - Improved dition Analysis by experts Idea Focusing experience/ technology
6s
- Define/ - Analysis for - Optimizing - Control by Measurement statistics condition by PTS * - Variance of - Effect analysis statistical (CTQ, CTQ caused factors analysis Benefits)
- Discrete+Continuous
data
- Easy to apply because of supporting statistical software.
6s
100ppm / 6s Application Selecting Line Do process FMEA
- Selecting Cost issue process view of customer
100ppm / 6s
100ppm
Detecting process defects
Managing Tool Product managing compare with spec. Judging each persons Know-How Manual Data gathering & analysis
6s
Control process variation
Improvement Tool Prevention Control vital few factors Judging the statistic Data Simple & Effective analysis using the S/W
6s
Focusing Point
Y
Dependent Output Effect Symptom Monitor
X
Independent Input-process Cause Problem Control
problem on some system in view of customer. This is we called CTQ and We achieved 6s target through the 6s process just selecting CTQ
Also, 6s activity is focusing
X factor effects on CTQ(Y) has the vital few 20% & trivial many 80%.
6s
6s
Generally controlled F-Cost has small portion considering of Hidden Loss Inspection SVC Scrap Reject Design Change Long cycle time Over Rework Office Loss Rework Potential(Additional) F-Cost
(Difficult to measure)
6s
New Belief
Internal & External Failure Costs Appraisal & Prevention Costs
$ $
4s
5s
6s
Quality Improves
Quality Improves
The high quality producer is the low cost producer not expensive.
Internal Failure : Scrap / Remake / Supplier Rework External Failure : Cost to Customer / Warranty Cost / Compliant Adjustments / Returned Material Appraisal : Inspection / Test / Quality Audits / Test Equipment Prevention : Quality Planning / Process Planning / Process Control / Training
6s
20,000 lost articles in mail per hour. Unsafe drinking water almost 15 minutes each day
6s
6s Approach
Traditional Approach
%(Defect Rate) Discrete Data Satisfaction for Mfg Process Spec Outlier Experience + Job Bottom Up Mfg Process s
Discrete + Continuous Data Customer Satisfaction Variation Improvement Experience + Job + Statistical Ability Top Down Design, Mfg, Sales, SVC
6s
Prosperity :GE
At the beginning of 80s, In the Japanese market, Motorolas beeper lost its name value because of the quality difference compared to Japans In 1981 they tried to meet a challenge to improve quality 5 times in 5 years and they couldnt. They developed a consistent process base on statistical knowledge. In 1987, they established 6 goal as a key initiative.
In 1995 GE launched 6 process to overcome a difficult business environment and to challenge World Class Quality. They made new processes such as Productivity,Inventory Return and NPI, but improvement was delayed because of defects in processes. GE thinks World Class Quality is big challenge. GE will focus on 6 process for next generation .
6s
G E SONY
Introduce
Outcome
1987
Q. Cost Down $3.2billion
1988
Q. Cost Down 1988:30% 1993:7.4%
1995
Q. Cost Down $3.8billion
1997
By 2000 years Train 2,000 Black Belts
First in Japan
Remarks
6s
Qualitative output
Costs Benefits
6s do the role of Boundaryless Behavior. Organization become learning & logical Use 6s as worldwide common language. GE believes that 6s would take part central role in the future.
600
400 200 0 96 97 98
6s
6s
System requirement
Methodology
CTQs from Customers voice, Improve the item which has big impact first!
Construct Infra
Need successful case study project. Resource reformation for organization and system. Reasonable appraisal and reward system.
6s
Champion
- 6s Operating
Champion Review
Project Team
- Operating Project - Achieving 6s level for CTQ
* Champion Review : Decision making meeting that controls progress by project steps(Selecting theme Output review)
6s
- Drive 6s Activity
Chief of 6s operating
Continuously lead Activity through strong commitment Evaluate Output and Share best practice with MBB
- Involvement
Monitor and support through Champion Review Directly support to settle bottleneck for 6activity
- Support Project
Lead supporting all department in improvement and control step for 6s Project team Deciding Investment and allocate resources Generate motives
It very important that the Champion gets involved in project and take ownership for 6s is
6s
Role
6s Technical Leader Full Time Job for 6s Complete MBB Course or acquire MBB Cert.
- Support Projects
Mentor BB / GB and Train individuals in tools Support settlement for 6sActivity Barrier continuous management and control for improved process
6s
Role
Leading BB/GB Project Drive Verity Output Training Execute Project Leader of Pjt. team Team member training Execute Project Team Leader or Member
Belt
Master BlackBelt
Main Job
6 Technical Leader Needs Stat. Skill Propagate
Requirements
More than 4 Projects & Consulting More than 5 Projects a year
BlackBelt
GreenBelt
2 Projects
6s
All Projects
PTS
Belt
Champion, Owners
Project Reviews
- Update and control CTQ of Closed Project - Easily manage and report for Project status - Evaluate reduction cost of 6sProject - Share Project information - Monitor 6s Project status Project Theme/Z value/Reduction cost Amount By Division/OBU/Product/Model
6s
Training For All Employees
- Training for Employees - Training for Boards Project Review - MBB & BB : 80/Year - Training : 2,400 person
Organizing 6sTeam
Planning 6sStrategy
6sTraining Material
- Intoduce 6s : All Employee - 6s GB Training Prg. : Engineer, Staff - 6s WB Training Prg. : Supervisor
Construct IT System
- Impove Chronic Defects : Minitab S/W - Optimize Process IT : Real Time Monitoring : Data Base For CTQs
Case Study
- 6s Team - Case Study : 1 / OBU
- Due part - Briefing 6s MFG : QA Team Process Leader R&D : Chief of - Planning 6s Lab. Strategy/Goal - Organize 6s Surport Part :2~3 person/OBU Organize 6s Team
6s
for pursuing
continuous improvement by reducing process variability. It requires a thorough process and product understanding and is clearly focused on customer driven expectations.
6s
6s
Wing to Wing !
6s
6s
Squares: 4 units
A characteristic you inspect or test. Circles: 5 opportunities per unit Anything that results in customer dissatisfaction. Anything that results in a non-conformance. Black circles: 9 defects Customer cares about it. Independent Can actually happen
Opportunity (OP)
Defect (D)
6s
Formulas Defects per Unit DPU = D/U 9/4 = 2.25 TOP = U*OP 4*5 = 20 DPO = D/TOP 9/20 = .45 DPMO = DPO*1,000,000 .45*1,000,000 = 450,000
Total Opportunities
Define Phase
6s
Define your customers & their expectations, team goals, project boundaries, what you will focus on, and what you wont. Define the process you are striving to improve by mapping the process.
The key deliverables for the Define phase are: Customer CTQs derived and documented Team charter documented and reviewed with Champion Validated process map completed
Team Charter
6s
Purpose of the Charter Clarifies what is expected of the project Keeps the Team focused Keeps the Team aligned with organizational priorities Transfers the Project from the Champion to the Project Team
6s
The Project Charter contains : Business Case Explains Why is the project important to be done Describes the pain in clear, concise and measurable terms. Problem & Goal Statement Project Scope Milestones / Project Plan Roles / Responsibilities
6s
Example
Business Case
Financial (loss/gain) from (current/goal) : Rs.2.1 million
Problem Statement
Measure
Current Defect Rate Period Where New Defect Rate Rationale Period
Goal Statement
Project Scope
6s
What process will the team focus on ? What are the boundaries of the process we are to improve ? Start point ?
Stop point ?
What resources are available to the team ? What (if anything) is out-of-bounds for the team ? Under what (if any) constraints must the team work ? What is the time commitment expected of team members ? What are the advantages to each team member for the time commitment ?
6s
6s
6s
What and how do you want to inform the Champion about the teams progress?
What is the role of the Team Leader (Black Belt / Green Belt) and the Team Coach ( Master Black Belt) ? Are the right members on the team ? Functionally ? Hierarchically ?
6s
Customer Whoever receives the output of your process (Internal Customers / External Customers) Output
Input
The material or data that a process does something to or with Supplier Whoever provides the input to your process
6s
Process Definition A process is defined as a collection of activities that takes one or more kinds of input and creates output that is of value to the customer.
Business Process Mapping The model is applicable to both product and service organizations. Everyone receives inputs from suppliers, adds value through their process, and provides an output or output that, at a minimum, meets the customers needs and related requirements while trying to exceed them.
It is important to recognize that the end product for the customer and the output of the process, for the purpose of this model, are the same.
6s
6s
An ability to see that changes are not made in a vacuum and will carry through, affecting the entire process down the line.
The magnification of non value-added areas or steps. The ability to identify cycle times for each step in the process.
6s
Deliverables of Measure
6s
Measure Deliverables 1. 2. 3. Identify the Measurable Customer CTQ Define and Confirm Specifications for the Y Ensure Measurement System is Adequate to Measure Y
6s
Measure Objectives Identify the project Y Define the performance standards for Y including specification limits and defect and opportunity definitions Validate the measurement system (Audit it for correctness / reliability; from which register / database, what field, what formula etc. would be used as a basis) Develop a common reference document for all team members to promote clear communication about the purpose and methods for data collection and provide the link between the data collection effort and the project goals Collect the data Characterize the data using mean and standard deviation
Segmentation
Segmentation
6s
An analysis technique that involves temporarily dividing a large group of data into smaller logical categories to look for areas of very good vs. very poor performance Can be used to understand which Xs drive variation of the Project Y Collect segmentation factor data to be used for later analysis Common Segmentation Factors
Common Segmentation Factors : What type When Where Who : Complaints, defects, problems : Year, month, week, day : Country, region, city, work site : Business, department, individual, customer type, market segment
6s
Identify the factors for segmentation before you start collecting data Make sure the segmentation factors can be measured reliably Record the segmentation factors for each Y data point collected Segmentation factors are typically easy to collect, so collect more segmentation factors rather than fewer A proper segmentation done will ensure that when you want to use data for further analysis, it can be massaged / stratified in various ways.
6s
6s
CTQs Are The Bridge Between Our Process Output And Customer Satisfaction.
6s
A Performance Standard is the requirement(s) or specification(s) imposed by the customer on a specific CTQ.
Example :
Contracts : Terms of Loan, due diligence standards, time of delivery, warranty information
6s
Actual Variation MSV MSV = Measurement System Variation MSV is attributable to : a) b) c) Person to Person (data collector) Variation Measurement Equipment Variation Variation due to Method of Collection or Environmental conditions Total Observed Variation MSV
6s
Outcome
Step 1. Collect Data against Y and seg mentation factors 2. Study Shape ; Check normality
Tool Used Segmentation, Data collection sheet/pla n, Measurement System Analysis (Audit of Measurement System) Histograms, Normality Test (Anderson D arling) Run Chart
Validated Data for Y against vari ous Xs Inference about the shape of th e process output and closeness to normal distribution Presence of Clusters, Mixtures, T rends, Oscillation if any. for furt her segmentation. Mean, Median, Std. Dev., Norma lity, Quartiles ZST, ZLT, ZShift, Zbench, In Case data not normal,and un stable, convert into DPMO to us e the product Report.
Normal Curve
6s
The Normal Curve is a graphical representation of the mathematical expression used to describe a Normal Distribution. This distribution is the result of a process. The mean is the average of the data points.
6s
Whats the probability of being: greater than (less than) the mean ? greater than (less than) 3 standard deviations ? greater than (less than) -1 standard deviation ?
A randomly selected item has a 99.73% chance of being between -3 and 3 standard deviations from the mean.
6s
The probability areas remain the same for any given region under the normal curve regardless of differences in variation.
6s
6s
Concept of Stability
6s
A process is said to be stable if the process settings do not change significantly over a period of time. A stable process does not have presence of :
a)
Trends
c)
Mixtures
1 3
1
3 1
3 3
Visually distinct groups of data points A Process can be checked for Stability by studying a Run Chart
6s
Analyze Deliverables
6s
Deliverable: List of Statistically Significant Xs, Chosen Based on Analysis of Historical Data Tools: Process Analysis Graphical Analysis Hypothesis Testing Regression Analysis
Tools: Basic Statistics Graphical Analysis Sampling Continuous ZST, ZLT Normality Discrete ZST, ZLT
6s
Types of Variation
Common / Chance Cause Variation Consists of many individual causes Any one cause results in only a minute amount of variation Example : Slight variation in raw material Lack of human perfection in reading instruments & setting controls
6s
Special / Assignable Cause Variation Consists of just one or few individual causes
Cannot be economically eliminated Process follows a predictable (statistical) pattern GOK (God only knows)
6s
Pareto Analysis
Used by Italian Economist Pareto as 80:20 Rule.
6s
Pareto Diagram
6s
100 80 60
1000000
500000
40 20
0
USA 293016 2 7 .2 2 7 .2 UAE 262150 2 4 .4 5 1 .6 UK 224123 2 0 .8 7 2 .4 Singapore 110154 1 0 .2 8 2 .7 GER 65311 6 .1 8 8 .7 Malaysia 45035 4 .2 9 2 .9 Hongkong 38614 3 .6 9 6 .5 others 37633 3 .5 1 0 0 .0
D e fe c t
C ount P e rc e n t C um %
Many destinations
P e rc e n t
C o u nt
6s
6s
Fishbone Diagram
6s
Delay in Splicing
Delay in Mobilisation
Availability of EOW
OTDR Correctness
Availability of RoW
Localisation of Fault
FMEA Model
6s
Types of Controls
6s
TYPE-1 CONTROL (P-TYPE) Controls which PREVENT the cause/failure mode from occurring, or reduce their rate of occurrence.
TYPE-2 CONTROL (D-1 TYPE) Controls which DETECT the CAUSE of failure mode. TYPE-3 CONTROL (D-2 TYPE) Controls which DETECT the FAILURE MODE. EXAMPLE
Take a stage of heat treatment process. The failure mode identified is : Hardness Not OK. So lab tests to check the hardness are TYPE-3 controls. Suppose the causes identified are improper temperature (less or more than allowable) and time. A buzzer which blows when temperature is above or below the allowable value is a TYPE-2 control. Patrol inspection to monitor the temperature is still TYPE-2 control. A feed back control system to regulate temperature when it goes above and below the allowable value is a TYPE-1 control.
What is FMEA
6s
FMEA (Failure Mode Effects Analysis) A structured approach to: Identify the ways in which a process can fail to meet critical customer requirements Estimate the risk of specific causes with regard to these failures Evaluate the current control plan for preventing these failures from occurring Prioritize the actions that should be taken to improve the process
Identify ways the product or process can fail. Then plan to prevent those failures.
6s
See the effect of failure on : Next Operation Subsequent Operation Part Vehicle Customer Government Regulations SEVERITY Seriousness of effect (5 to 8 rating Significant) (9 to 10 rating Critical)
6s
Identify process deficiencies at that particular stage which results in that failure mode.
As far as possible assume incoming part/material to an operation are correct. If non there, then only see whether there is some failure mode of previous operation.
Treat design to perfectly O.K.
OCCURRENCE Probability that A particular cause will occur & And will lead to that particular failure (Cpk can be used).
6s
Consider only those controls that will be used to detect the failure mode (Assumption Failure has occurred). Note : Controls intended to prevent or reduce the occurrence of a cause of failure mode are considered for occurrence rating.
DETECTION Probability that present controls will detect a failure mode or detect cause (Assume failure has occurred) Example of 1000 sheep (low occurrence not necessarily means low detection) D D Effects D D P Effects O
FMEA Calculations
6s
Risk Ratings Severity (SEV) How significant is the impact of the Effect to the customer (internal or external)? Occurrence (OCC) How likely is the Cause of the Failure Mode to occur? Detection (DET) How likely will the current system detect the Cause or Failure Mode if it occurs? Risk Priority Number A numerical calculation of the relative risk of a particular Failure Mode
RPN = SEV x OCC x DET This number is used to place priority on which items need additional quality planning
FMEA Template
6s
6s
FMEA Template
6s
6s
Population B
Population A
Sample A
Sample B
6s
1.
Once we have identified these factors and made adjustments for improvement, we need to validate actual improvements in our processes. Sometimes we cannot decide graphically or by using calculated statistics (sample mean and standard deviation) if there is a statistically significant difference between processes. In such cases, the decision will be subjective. We perform a formal statistical hypothesis test to decide objectively whether there is a difference.
2.
3. 4.
6s
Innocent
Verdict / Inference
(From Sample)
Guilty
6s
:The height of citizens in country A is greater than or equal to the height of citizens in country B (A B).
3.
State your Alternative Hypothesis (Ha) , which is a negation of null hypothesis Ha :The height of citizens in country A is less than the height of citizens in country B (A < B).
4. 5.
Test Alternative Hypothesis with Statistical Test Based on the test result, we reject or fail to reject the null hypothesis Ho Ho
p
Reject
Accept
Ho
0.05
1.00
6s
6s
Two-Sample Hypotheses 3. Ho Ha : 1 = 2 : 1 2
4.
Ho Ha
: 1 2 : 1 > 2
5.
Ho
Ha
: s12 = s22
: s12 s22
6s
Multi-Sample Hypotheses
6. Ho Ha : 1 = 2 = . . . = n : at least one not equal
7.
Ho Ha
6s
Continuous (Continuous)
Simple Regression
6s
Improve
6s
Improve
6s
Objectives To take action for eliminating main causes. Prioritise action points, responsibility & time schedule.
1.
2. 3.
4.
6s
4.
High
CONTROL Medium
Low
Hatched Area is Immediately Actionable Countermeasure 5. 6. Check the cost of countermeasure v/s impact. Also check the timelines.
6s
6.
Get the actionable agreed on by sponsor of the area which is in question (Has the person und erstood the action).
7.
8.
CONTROL
6s
Deliverable: Determine post-improvement capability and Performance. Confirm the improvement goal has been realized
Deliverable: Develop and Implement Process Control Plan Tools: Control charts Mistake Proofing FMEA
Control Objectives
6s
Processes will tend to degrade over time, losing the gains achieved by design and improvement activities. To make sure that our process stays in control after the solution has been implemented To quickly detect the out-of-control state To determine the associated special causes To ensure that appropriate actions can taken to correct the problem before a defect is produced
Control Mechanism
Various Control Mechanisms
6s
Problems
Mistake Proofing
Avoid Potential
SPC
Control Potential
Problems
I&MR Chart
6s
UCL=2.852 Mean=2.800
2.80
2.75 0 10 20 30 40 50
LCL=2.748
Moving Range
UCL=0.06397
R=0.01958 LCL=0
6s
UCL=2.835 Mean=2.800
Sample Mean
LCL=2.765
Subgroup 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00
Sample Range
UCL=0.06091
R=0.01864 LCL=0