4. To know how the construction projects are executed based on the design and
its specifications.
COMPANY PROFILE
NSL CONSTRUCTIONS.PVT.LTD.
Company name: NSL CONSTRUCTIONS .PVT.LTD.
Address: No-93, 4th Floor, Sai complex, 1st Phase, Sector A, Yelahanka new
town, Bangalore-560062
Mobile:+91 80 28462613
ABOUT THE PROJECT
Project Name: Proposed Group ‘A’ Officers Quarters.
Area Details:
• Total area of the land- 2675sqmts
• Built up area- 1985sqmts
• Total open area-690 sqmts
Cost Details:
• Construction Cost: Rs 76,45,10,469/-
Flat Details:
• Total Number of Flats- 72
• 48 Flats with 172 sqmts area.
• 24 Flats with 221 sqmts area.
Floor Details : G+12 Floors.
• With a multipurpose hall.
Height Details:
• Ground Floor/ Mechanical Parking- 5.1M
• Floor to Floor Height: 3.05M
• Total Height of The Building- 41.7M
Project Location:
• Shoes
• Safety nets.
MATERIALS USED
SHUTTERING AND SCAFFOLDING WORKS
1. SHUTTERING WORK
• Shuttering work includes both formwork and false work. Formwork is a mould or
open box, like container into which fresh concrete is poured and compacted.
• When the concrete is set, the formwork is removed, and a solid mass is produced
in the shape of the inner face of the formwork.
• False work is the necessary support system that holds the formwork in the correct
position.
• The top of the formwork is normally left open.
• Generally shuttering involves three major stages, i.e. column shuttering, beam
shuttering and slab shuttering.
• In column shuttering, plywood is used as the moulding material and in beam
shuttering plywood and supporting jacks are used.
Shuttering for Column Shuttering for Beam & Slab Shuttering for Staircase
2. REINFORCEMENT & CONCRETING
• It involves arranging steel bars within the column, Beam & Slab formwork
according to structural drawings and specifications.
• This ensures proper reinforcement to withstand the anticipated loads and provide
structural integrity to the Building.
• Concrete of M25 Grade is used in Slabs & Beams and M30 Grade is used in
columns
• De-shuttering refers to the removal of formwork from around the cured concrete slab
after it has achieved sufficient strength
Deshuttering
THANK YOU