0% found this document useful (0 votes)
50 views10 pages

SQM - WC - Koeberg Dassenberg 132kV - Cat 2

Uploaded by

Tiaan Esterhuyse
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views10 pages

SQM - WC - Koeberg Dassenberg 132kV - Cat 2

Uploaded by

Tiaan Esterhuyse
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 10

QM 58 Clarification Meeting Category 2

Partially supply & construction of 10.5km


double circuit Koeberg / Dassenberg 132kV HV
Line in the Western Cape Operating Unit
Tender No.

Date: 2021/12/07

03/28/24
1
Contents
Copy of the Category 2 Quality requirement

1.Category2 Quality Requirement - Explanation

2.Completion of : C: Contract Quality Plan (CQP/PQP); D: Quality Control


Plan ( ITP /QCP) and E:Form A

3.Templates: C: Contract Quality Plan (CQP/PQP); D: Quality Control Plan


(QCP/ITP) and E; Form A

03/28/24 2
Copy of requirement
Category 2: Quality Requirements Deliverables to be evaluated indicator = 1 Weights
SECTION A : Quality Management System Requirements ISO 9001
(Option 1) Valid certification of Quality Management System by an ISO accredited body
Apply (Yes=1)
A.1 Product / Service Scoping on ISO 9001 certificate is defined and relevant 1
A.2 Certificate by Approved and Authorized certification authority 1
A.3 Certification Authority has Recognized International Accreditation 1
A.4 Validity (expiry date) of certificate 1
Section A Score 4
SECTION A : Quality Management System Requirements ISO 9001
(Option 2) Objective evidence of documented QMS that is not certified but complies with ISO 9001
Apply (Yes=1)
A.1 QMS Manual or a document that defines and describes the QMS and its scope 25%
1
A.2 Quality Policy Approved by top management. 1
A.3 Quality Objectives Approved by top management. 1
A.4 Control of documented information 1
A.5 Documented information for Control of nonconforming outputs 1
A.6 Documented information for Nonconformity and Corrective action 1
A.7 Documented information for Internal audit 1
Sub-Section A Score Option 2 7

SECTION B :
•Planning
Evidence of QMS in operation (Tender Quality Requirements -Ref 240-105658000)
Apply (Yes=1)
B.1 Documented information for defined roles, responsibilities and authorities 1
B.2 Documented information for Control of Externally Provided Processes, Products and Services
1
B.3 Latest copy of an internal management system audit report (with Nonconformity, Correction 25%
and/ or Corrective Action Reports) 1
B.5 Records of Management Review meetings (minutes, attendance registers etc)
1
Section B Score 4

SECTION C: Contract Quality Plan Requirements (Ref 240-105658000 and 240-109253698).

Draft Contract Quality Plan specific to the scope of work as described in the tender documents (Ref ISO 10005)
20%
NB! Draft Contract/Project Quality Plan has important QA deliverables Apply (Yes=1)
Section C Score 1

SECTION D: Quality Control Plan Requirements (Ref 240-105658000 or 240-109253302)


QCP /Checklist/ ITP (Quality Control Plans) as per Scope of Works (Ref ISO 10005 & 240-105658000)
NB! Draft/ Example of an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) on similar and/ or
Apply (Yes=1)
previous work done 20%
1
Section D Score 1

SECTION E: User defined additional Requirements & miscellaneous (Ref 240-105658000)


Customer specific requirements & other standards and required can be listed and evaluated here
Apply (Yes=1)
E.1 Form A is completed and signed. 1 10%
Section E Score 1

03/28/24 3
1- Quality Requirement - Category 2
•SECTION A:
• OPTION 1 :A.1 Valid ISO 9001 Certificate
OR
• OPTION 2:
• A.1 QMS Manual or a document that defines and describes the QMS and its scope- Must be aligned to
ISO9001:2015 (include but not limited to 4-Context of the organization, 6 - •Planning , etc.)
• A.2 Quality Policy Approved by top management.
• A.3 Quality Objectives (Company Goals / KPA/ Focus )Approved by top management.
• A.4 Control of documented information (both document s and records)
• A.5 Documented information for Control of nonconforming outputs
• A.6 Documented information for Nonconformity and Corrective action
• A.7 Documented information for Internal audit

•SECTION B:
• B.1 Documented information for defined roles, responsibilities and authorities ( e.g Organogram
or Job Profile , Responsibility Matrix etc.)
• B.2 Documented information for Control of Externally Provided Processes, Products and Services
• B.3 Copy of completed Audit Report including (NCR and CAR)
• B.5 Records of Management Review meetings (minutes, attendance registers etc)

•SECTION C: Contract Quality Plan as per Scope of Works (Ref ISO 10005)- Completed + Project Specific:
•SECTION D: SECTION D: Quality Control Plan / Inspection and Test Plan (QCP/ITP) – Completed + Project Specific:

•SECTION E: To Complete and Sign Form A

03/28/24 4
2- C: Contract Quality Plan

SUPPLIER / CONTRACT NAME


ESKOM ENQUIRY / CONTRACT
NO.
COMMENCEMENT DATE
COMPLETION DATE

ed
et
SUPPLIER /
CONTRACTOR
Name Designation
p lSignature Revision

Compiled by
o m
c
Approved by

b e
ESKOM
APPROVAL
Name
To
Designation Signature Revision

Reviewed by

Accepted by

03/28/24 5
2- C: Contract Quality Plan …

1. SCOPE OF WORK
(Full description of the Works Information)
2. \COMMUNICATION CHANNELS BETWEEN CONTRACTOR & ESKOM including
Preliminary Management authority & responsibility Matrix submitted
(Communication regarding all quality related issues i.e.
Documentation/ E-mails/Minutes of Meetings/Fixed Contract Meetings/Weekly
Progress Meetings All documentation will be submitted per transmittal).

3. ORGANOGRAM
Resources- Quality department organogram of all QA & QC resources. (Include
organogram showing structure of Contractor, which shall show the Quality

activities/processes)
ed
Management representative and all other personnel responsible for control of Quality

et
l
4. INDEX OF INTERFACING DOCUMENTS
Submit the company’s documentation Index Matrix and proof of implementation of how

p
Documents generated during the contract are controlled/filed in terms of the

m
company’s QMS- Document control and Index of Documentation to be loaded to the
QMS Databook

5.
co
INDEX OF DOCUMENTS /RECORDS THAT SHALL BE SUBMITTED TO ESKOM

e
DURING PROJECT
(Example):
o TITLE
b
o NUMBER

To
Submitted to Eskom during the contract
Method statements
QCP / ITP

Captured in the QMS of the Contractor / supplier


Quality Manual
Quality Policy
QCP / ITP

03/28/24 6
2 - D: Quality Control Plan (QCP /
ITP)
•EXAMPLE: Maintenance of Lifts, Escalators and Passenger Conveyors
Axtivities

03/28/24 7
2 –E Form A completion and signing

Complete here

Complete and sign here

03/28/24 8
3-Templates

Templates Attachments

Category 2 requirement As per Portal

C: Contract Quality Plan (CQP/PQP)


Document

D: Quality Control Plan / Inspection and


Test Plan (QCP / ITP) Microsoft Word
Document

E.1: Form A
As per Portal

9
03/28/24 10

You might also like