Lecture 19 Operation Process Charts
Lecture 19 Operation Process Charts
1
Charts
These are most extensively used techniques
to record the events for method study.
These are used to show sequence, movement of man/material.
Information Required in the Chart
Name of the product/material with code if any.
Process under review with starting and end point.
Chart reference number and number of sheets if
any.
Name of work study analyst and approver of the
same.
Date of study.
Summary of distance and time etc.
Symbols Used in the Construction of Charts
ASME has recommended FIVE standard method study symbols:
OPERATION
INSPECTION
TRANSPORTATION
http://blog.coursesmba.com/operation-management/
Inspection
An inspection occurs when an object is
examined and compared with standard
for quality and quantity.
Examples:
• Quantity of incoming material
• Checking the dimensions
www.canstockphoto.com/illustration/quality-control
Transportation
Indicates the movement of workers,
materials or equipment from one place
to other place.
Examples:
• Movement of materials from one work
station to another.
http://www.hascallsteel.com/2017/04/07/
Delay or Temporary Storage
It indicates a delay in the sequence of
events.
Examples:
• Work waiting between consecutive
operations.
• Operators waiting for instructions from
supervisor.
www.linkedin.com/pulse/time-delivery
Storage or Permanent Storage
Indicates a controlled storage in
which material is received into or
issued from a store.
Example:
Materials kept in stores to be distributed
to various work centres.
www.familymovers.com/warehouse-storage/
Combined Activities
• A combined activity occurs when two activities occur
simultaneously.
• In such situations, the symbols for the two activities are
combined.