Isb-Iba1-P01-N9k DR Drill Cab Meeting

The document outlines a planned DR drill activity to test business continuity for a provisioning system. The drill involves shutting down the primary uplinks from aggregation nodes to the ISB-IBA1-P01-N9K core router and verifying traffic is served by the redundant ISB-IBA2-P01-N9K router. An activity plan is provided with steps to backup current configurations, collect statistics, perform the shutdown, verify service, and revert changes. Stakeholders are notified and contingency options are described in case of any instability during the drill.

Uploaded by

muhammad farooq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views10 pages

Isb-Iba1-P01-N9k DR Drill Cab Meeting

The document outlines a planned DR drill activity to test business continuity for a provisioning system. The drill involves shutting down the primary uplinks from aggregation nodes to the ISB-IBA1-P01-N9K core router and verifying traffic is served by the redundant ISB-IBA2-P01-N9K router. An activity plan is provided with steps to backup current configurations, collect statistics, perform the shutdown, verify service, and revert changes. Stakeholders are notified and contingency options are described in case of any instability during the drill.

Uploaded by

muhammad farooq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 10

DR Drill ISB-IBA1-P01-N9K | NE9000

Umair Asghar

14 July 2022
Agenda

 Purpose
 Technical Services
 Implementation Approach
 Activity Plan
 Stakeholders
 Contingency Options
Purpose
 In order to ensure business continuity for Provisioning System, we need to
perform DR drill activity
 Core Provider Routers (P) are backbone of our Infrastructure. They provide
Intra/Inter Region Core, Aggregations & IP EDGE connectivity.

 Impact:

 During Drill, traffic of all aggregation uplinks & RRs from ISB-IBA1-P01-N9K will be
served from ISB-IBA2-P01-N9K.
 There will be no service impact if connectivity remains stable between AGGs & ISB-
IBA2-P01-N9K.
Technical Services
 From AGGs, Ps & RRs, connectivity extends to ISB-IBA1-P01-N9K through IS-IS.
 Services include MPLS L2/L3 VPNs, MPLS TE Tunnels, & Internet links.
 IS-IS neighbors are:
Topology
ISB-IBA1-P01-N9K Redundancy Check: Stepwise Process:

 1. Make sure IBA1-P router Interfaces are connected with all respective P router uplinks.

 2. Shutdown link between AGGs & ISB-IBA1-P01-N9K.

 3. See ISB-IBA2-P01-N9K will serve as uplink for all customers connected on AGGs.

 4. Monitor the interface utilization, Routes, memory and CPU for both Routers.

 5. Revert the changes and see if all customer are served as before.

 6. Service Verification by POC: interface utilization, Routes, memory and CPU for both Routers.
Activity plan

STEP Details Time


Step 1 Current Configuration Backup, BGP peer Status and L2/L3 VPNs 01:30 AM

Collection of Statistics including traffic utilization stats on


Step 2 Aggregation nodes
02:00 AM

02:10 AM
Step 3 Shutdown Primary uplinks from Production network

Service verification ISB-IBA2-P01-N9K will serve as primary node.


Step 5 Check all BGP peer & L2/L3 VPNs.
02:15 AM

Step 6 Revert Changes and Service verification and Close the Activity 04:00 AM
Stakeholders
[email protected]
 Ali Asim/SM (IP Core) Islamabad/PTCL
 M Umair, Danial Zaidi / Huawei CS Support
Contingency Options
 Before activity, traffic stats of customers will be monitored through graphs
& CLI.
 Current good known configurations will be preserved
 In case of any instability observed on the ISB-IBA2-P01-N9K downlink,
traffic will be reverted into production network immediately.