Devised Log (Week 6)
Devised Log (Week 6)
Devising Log
An area of our performance we worked We worked on and improved by:
on today was: First thing in the morning, we came to drama and
immediately started working. One of our group members
We tried to use a script to finalize the gave us scripts to work off of. We had to use them more as
performance and have it become more a guide rather than a full script due to the fact there was
organized, but we ended up having to too much on the scripts and our practice performance
ended up being under rehearsed and we had to remove a
scrap the scripts. We finalized every bunch of stuff. Throughout the entire day, we mostly spent
single scene with props for our rehearsing and just removing/changing something we
performance in the afternoon. We also didn’t like. We depended a lot on feedback from our group
and would help our members deliver their lines properly.
did a practice performance but ended We worked on lights for each scene and the music we’d
up having to remove a bunch of it due use. We perfected our chair duets and was ready to
to it being under rehearsed. perform by the end of the day.
This this is a change from our original idea because: During the rehearsal process, we
ended scrapping our scripts and just using them as a guide instead. This was a good change
as the scripts were a last minute thing and it would’ve ended up being way more messy
than if we just got rid of them.