INTRODUCTION
M/s SCC Builders Pvt Ltd has to develop a Affordable Housing Project under Uttar Pradesh Pradan Mantri Awas
Yojana Partnership namely “SCC Blossom” located at Khasra No. 1179 & 1180, Village: Noor Nagar, District:
Ghaziabad, Uttar Pradesh.
Project is spread over area of 16,800.00 m2 (4.151 acres) and will have a built-up area of 84,920.48 m2.
Project is classified as Category 8(a) as per EIA Notification.
Project have 5 residential blocks namely Block A (2B+ ST+ 19F), Block B (2B+ ST+ 19F), Block C (2B+ ST+ 19F),
Block D (2B+ ST+ 19F) including one EWS block “Block X” (GF+ 10F). Apart from these structures, there will be
two separate buildings; (1B+ GF+ 7F) for Commercial Shops & Nursing Home and (2B+ GF+ 3F) for Nursery
School respectively.
3
SALIENT FEATURES OF THE PROJECT
Description Proposed
Net Plot Area 16,800.00 m2
Built-up Area 84,920.48 m2
Expected Built-up Area after
Compounding 89,200.48 m2
Green Area 1,680.00 m2 @ 10 % of Net Plot Area
Total Water Requirement 488 KLD
Total Fresh Water Requirement 345 KLD
Total Wastewater Generation 408 KLD
Capacity of STP 250 KLD
Capacity of ETP 27 KLD
Municipal Waste Generation 2,838 kg/day
Bio-Medical Waste Generation 37 kg/day
Parking Required & Provided 438 ECS & 444 ECS
Power Demand & Source 3,294 kVA (PVVNL)
Back up 1,700 kVA (3 x 500 kVA + 1 x 200 kVA)
RWH Pits 4 pits
Project Cost 255 Crores
4
PROJECT LOCATION AND CONNECTIVITY
DISTANCE &
S. No. FEATURES DESCRIPTION
DIRECTION
Khasra No. 1179 & 1180, Village: Noor Nagar,
1. Location
District: Ghaziabad, Uttar Pradesh.
2. Geographical Co- Latitude: 28°42'17.14"N
ordinates Longitude: 77°26'08.52"E
3. Connecting road 5 Number Bhatta Road 210 m, NE
4. Nearest Highway NH - 58 1.09 km; SE
Nearest Railway
5. Guldhar Railway Station 1.93 km; East
Station
Nearest Eco-Sensitive
6. Okhla Bird Sanctuary 20.42 km; SW
Area
Nearest Operational
6. Vaishali Metro Station 11.10 km, SW
Metro Station
Indira Gandhi International
7. Airport 34.67 km, WSW
Airport 5
SITE AND SURRPOUNDINGS WITHIN 30 M
6
SITE AND SURRPOUNDINGS WITHIN 500 M
7
SITE AND SURRPOUNDINGS WITHIN 10 & 15 KM
8
AREA STATMENT
S. No. Particulars Area(in m2)
1. Total Plot Area 17,330.00
2. Road Widening Area 530.00
3. Net Plot Area (1-2) 16,800.00
4. Permissible Ground Coverage (@ 50% of Net Plot Area) 8,400.00
5. Proposed Ground Coverage (@ 31.94% of Net Plot Area) 5,366.21
6. Total Permissible F.A.R Area – 58,800.00
Permissible F.A.R. @ 2.50 -
42,000.00
Additional T.D.R. F.A.R @ 1.00 -
16,800.00
7. Total Proposed F.A.R Area – 58,316.22
Total Residential F.A.R. Area - 52,583.26
a. Normal Scheme F.A.R - 44,687.65
b. E.W.S F.A.R. - 7,895.61
Commercial/Nursing Home F.A.R. Area - 5,132.96
Nursery School F.A.R. Area - 9
600.00
AREA STATMENT
8. Total Non F.A.R Area – 24,027.31
Upper Basement Area -
8,167.28
Lower Basement Area -
9,579.17
Stilt Area -
3,373.45
Fire Staircase (Residential) -
1,304.35
Fire Staircase (Commercial) - 259.60
Fire Staircase (E.W.S. Blocks) -
143.99
Fire Staircase (Nursery School) -
66.20
Mumty Area of School & Commercial -
90.10
Machine Room of Commercial Area - 38.00
Service floor Area between 4th & 6th floor - 730.17
Garbage Collection Chamber Area - 150.00
KIOSK Area -
75.00 10
AREA STATMENT
11. Proposed Landscape Area @10 % of Net Plot Area 1,680.00
12. Total No. of Units Proposed
Normal Scheme Units - 684 936 Units
E.W.S. Units - 252
13. Maximum Height of the Building 90 m
11
ZONING
7.5 m
7.5m
EXIT
ENTRY 24m WIDE ROAD
BLOCK X (EWS) (GF + 10F)
GARBAGE
COLLECTION
CENTRE
BLOCK C
(2B+ ST+ 19F)
BLOCK B GARBAGE
(2B+ ST+ 19F) COLLECTION
CENTRE
BLOCK D
(2B+ ST+ 19F)
BLOCK A
GARBAGE (2B+ ST+ 19F)
COLLECTION
CENTRE
SCHOOL COMMERCIAL/NURSING HOME
(2B+ GF+ 3F) (B+ GF + 7F)
STP
BELOW
ETP
BELOW EXIT/ENTRY
30m WIDE ROAD COMMERCIAL
6m 7.5 m
ENTRY EXIT 12
OPEN/STILT PARKING & TRAFFIC CIRCULATION PLAN
7.5m 24m WIDE ROAD 7.5 m
ENTRY EXIT
STILT PARKING
Scooter Parking OPEN PARKING
for EWS
OPEN PARKING FOR
COMMERCIAL
6m DRIVEWAY 7.5m DRIVEWAY
Ramp Down to Basement
Ramp Down to Basement
Ramp Up from Basement
EXIT/ENTRY
COMMERCIAL
6m
ENTRY 30m WIDE ROAD 7.5 m
EXIT 13
UPPER BASEMENT PARKING PLAN
UNEXCAVATED AREA
ENTRY TO UPPER
BASEMENT
EXIT FROM UPPER
BASEMENT
ENTRY TO LOWER
BASEMENT
EXIT FROM LOWER
BASEMENT
CAR PARKING SPACE
RAMP UP/DOWN to LB
FOR COMMERCIAL
BUILDING PARKING
14
LOWER BASEMENT PARKING PLAN
UNEXCAVATED AREA
ENTRY TO UPPER
MECHANICAL BASEMENT
CAR PARKING
NORMAL CAR
PARKING
EXIT FROM UPPER
BASEMENT
RAMP UP/DOWN to LB
FOR COMMERCIAL
BUILDING PARKING
15
UNIT ANALYSIS
16
UNIT ANALYSIS
17
UNIT ANALYSIS
18
UNIT ANALYSIS
19
CLUSTER ANALYSIS
20
CLUSTER ANALYSIS
21
CLUSTER ANALYSIS
22
CLUSTER ANALYSIS
23
COLOUMN DETAILS
24
COLOUMN DETAILS
25
RAFT FOUNDATION DETAILS
26
DETAILS
27
DETAILS DELEVOPED BY ME
28
29
MATERIAL STUDY
M.S PERGOLA
WITH GLASS
FITTING
TOUGHENED
GLASS GLAZING
M.S TUBES
RCC BAND
TOUGHENED
GLASS RAILING
30
THANK YOU FOR YOUR CONSIDERATION
31