Evans - Analytics2e - PPT - 14 Final
Evans - Analytics2e - PPT - 14 Final
Applications of
Linear Optimization
◦ Fabric 1: D1 + P1 = 45,000
◦ Fabric 2: D2 + R2 + P2 = 76,500
◦ Fabric 3: D3 + R3 + P3 = 10,000
Example 14.1: Continued
Loom capacity limitation constraints
First convert yards/hour into hours/yard.
E.g., for fabric 1 on the dobbie loom:
hours/yard = 1/(4.7 yards/hour) = 0.213 hours/yard
Decision variables
Objective
Solver Model
1st Scenario:
Fat requirement is lowered from
15% to 14.5%.
2nd Scenario:
Fiber limitation is raised from
14% to 14.5%.