Heat Load Calculation 2

The document discusses heat load calculations, including calculating solar gain through glass, transmission gain through walls and roofs, internal loads from people, lights, appliances, and other factors. It also covers estimating supply air duct losses, calculating effective room sensible heat, and latent load. Formulas and tables are provided to estimate various heat load components.
Copyright
© © All Rights Reserved
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views

Heat Load Calculation 2

The document discusses heat load calculations, including calculating solar gain through glass, transmission gain through walls and roofs, internal loads from people, lights, appliances, and other factors. It also covers estimating supply air duct losses, calculating effective room sensible heat, and latent load. Formulas and tables are provided to estimate various heat load components.
Copyright
© © All Rights Reserved
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 44

HEAT LOAD

CALCULATION 2

HEAT LOAD 2

1
home back next
TOPICS COVERED

 LOAD CALCULATIONS
– FORMS
– FORMULAS
– TABLES
– FACTORS
– AIR SIDE
– PSYCHROMETRY

HEAT LOAD 2

2
home back next
HEAT LOAD 2 3
HEAT LOAD FORM

 SEE TRANSPARENCY

HEAT LOAD 2

4
home back next
HEAT LOAD ESTIMATE
PROBLEM
 General office
 Ceiling 10’
 Wall 4 ½” brick, plastered both side
 Window- ordinary ¼” single glass internal
shade
 Door- plywood sandwich air space
 Occupants - 35 person
 Lighting - Fluorescent
HEAT LOAD 2

5
home back next
DESIGN CONDITIONS

 Outdoor design conditions


– 92°F db / 80°F wb or 95db/83wb
– Overestimating effect
– Night time temp. & rh different
– 76°F db/ 75°F wb / 95% rh

HEAT LOAD 2

6
home back next
DESIGN CONDITIONS

 Indoor design conditions


– Base on requirement and standards
– 75°F db / 55% rh
– 72°F db / 55% rh
– 71°F db / 50% rh
 Peak time at
– 4.00 pm

HEAT LOAD 2

7
home back next
CURRENT AIR-CONDITIONING DESIGN DATA
COMPARISON
JKR ASHRAE 95 CIBSE
INDOOR
24 23-26 22+/-2
TEMP.(o C)
LIGHTING LOAD
4-6 (2) 1.85-4.65 1.4
(w/ft2)
OFFICE EQUIP.
- 0.8-2 1.4
(w/ft2)
OUTLET
VELOCITY 25-50* 40-150 -
(ft/min.)
FRESH AIR
20 20 20
(cfm/person)
*-Carrier Handbook

HEAT LOAD 2 8
QUESTION

 Fill in the table other information


for the following conditions
– Outdoor air 92db/80wb
– Indoor 75db/55%rh

HEAT LOAD 2

9
home back next
SOLAR GAIN THROUGH
GLASS
 Cooling Load = Window Area x
Peak solar heat gain (Table 4) x
Storage Factor (Table 5) x Shade
Factor (Table 6)
 Refer to Table 4, Table 5 and
Table 6
HEAT LOAD 2

10
home back next
SOLAR AND TRANSMISSION
GAIN
 Heat Gain Through Walls &
Roofs = Area x Equivalent
Temp. Difference (Table 7 for wall &
Table 8 for roof) x Transmission
Coefficient (U) (Table 9)

HEAT LOAD 2

11
home back next
TRANSMISSION GAIN (EXCEPT
WALLS AND ROOFS)
 Heat gain through all glass = Area x
Temp. Difference (OA - RA) x
Transmission coefficient (U) (Table 9)
 Heat gain through shade wall, partition
= Area x Temp. Difference (OA - RA -
5°F) x Transmission coefficient (U)
(Table 9)

HEAT LOAD 2

12
home back next
TRANSMISSION GAIN (EXCEPT
WALLS AND ROOFS) (2)
 Heat gain through wall, partition
(adjacent to Kitchen,Boiler Room) =
Area x Temp. Difference (OA - RA +
15°F to 25°F) x Transmission
coefficient (U) (Table 9)

HEAT LOAD 2

13
home back next
INFILTRATION

 When ventilation exceeds


infiltration (+ve pressure), then
 infiltration = 0
 When rooms are design at -ve
pressure, have to consider

HEAT LOAD 2

14
home back next
INTERNAL LOADS

 People
– No. of people from no. of chairs or
base on per floor area
– Table 10 - Heat gain from people
 No. of people x Table 10
 Activity, Sensible & Latent

HEAT LOAD 2

15
home back next
INTERNAL LOADS

 Power
– Table 53 - Heat gain from electric
motors
– Electric motors contribute only
sensible heat to space

HEAT LOAD 2

16
home back next
INTERNAL LOADS

 Lights - Estimate (w/ft2)


 Lights - Type
– Incandescent
 rated lamp watt x 3.413
– Fluorescent lamp
 rated lamp watt x 1.25 x 3.413

HEAT LOAD 2

17
home back next
INTERNAL LOADS

 Appliances
– most appliances contributes both
sensible and latent heat load.
– They contribute latent heat by virtue of
their function ex. drying, cooking
– Hood to remove this is most effective
– Table 50 & 51- Heat Gain from
Restaurant
HEAT LOAD 2

18
home back next
SAFETY FACTOR

 Safety factor added for possible


error in the survey
 Over estimating safety factor will
cause oversized air conditioning
equipment - difficult to maintain
space conditions
 < 5%
HEAT LOAD 2

19
home back next
ROOM SENSIBLE HEAT (RSH)

 Now all the load components


contributing to sensible load can be
added

HEAT LOAD 2

20
home back next
SUPPLY AIR DUCT LOSSES

 In transferring air from system


cooling coil to space, four losses
must be considered;
– Supply duct heat gain
– supply duct leakage loss
– fan heat
– bypassed outdoor air
HEAT LOAD 2

21
home back next
SUPPLY DUCT HEAT GAIN

 Supply air in the duct at 50°F to


60°F passes through surrounding
environment above 90°F - potential
heat gain to supply air
 Insulation reduces this gain
 Typical figure < 2% of RSH

HEAT LOAD 2

22
home back next
SUPPLY DUCT LEAKGE LOSS

 Lost capacity in the supply air duct


depends on duct shape, duct
pressure and workmanship.
 Low pressure (0 - 2”s.p) : <5%
 Medium pressure (2” - 6”s.p) : 2% -
3%
 High pressure (6” & above) : <1%
HEAT LOAD 2

23
home back next
FAN HEAT

 Draw through (draw through the


cooling coil) fan add heat to air
supply. Electrical losses for motor
which lies in the air stream also add
heat
 < 5%

HEAT LOAD 2

24
home back next
BYPASS OUTDOOR AIR

 Some of the air passing through the


coil remain untreated.
 Load equivalent to infiltration load
 Depends on bypass factors use
 Load = cfm x (toa-trm) x bf x 1.09

HEAT LOAD 2

25
home back next
EFFECTIVE ROOM SENSIBLE
HEAT (ERSH)
 This load determine the cfm
required across the cooling coil
 ERSH = RSH + (SUPPLY DUCT
GAIN + SUPPLY DUCT LEAK
LOSS + FAN) + BYPASS
OUTDOOR AIR

HEAT LOAD 2

26
home back next
LATENT LOAD

 The latent counterpart of infiltration,


internal loads, and supply duct load
are also calculated to determine the
Room Latent Heat and Effective
Room Latent Heat
 Vapor Transmission - only for low
or high dew point application.
HEAT LOAD 2

27
home back next
ROOM LATENT HEAT (RLH)

 SUM OF ALL ROOM LATENT LOAD


– INFILTRATION
– PEOPLE
– STEAM
– APPLIANCES
– ADDITIONAL HEAT GAINS
– VAPOUR TRANSMISSION

HEAT LOAD 2

28
home back next
EFFECTIVE ROOM LATENT
LOAD (ERLH)
 ROOM LATENT HEAT (RLH) +
SUPPLY DUCT LEAKAGE LOSS +
BYPASS OUTDOOR AIR

HEAT LOAD 2

29
home back next
OUTDOOR AIR / VENTILATION
RATES
 Outdoor air/ventilation rates from Table
11-Ventilation Std.
 Outdoor air quantity can be determined
either by cfm/person or cfm/ft2 or
airchange rate (ach)
 Air change is defined as the quantity of
changed air every hour
 cfm = vol x ach
60
HEAT LOAD 2

30
home back next
OUTDOOR AIR HEAT

 Outdoor air heat comprised of both


sensible and latent load
 Except for bypassed air, the load
appears on the upstream of the coil
 Requirements of outdoor/fresh air
base on air change rate or cfm/sq.ft
or per person
HEAT LOAD 2

31
home back next
QUESTION

 Calculate the outdoor/fresh air


requirement of the office space, if
the recommended fresh air change
is 2 ach.
Answer : (ach/60) x Vol.
= (2/60) x 32000
= 1067 cfm
HEAT LOAD 2

32
home back next
RETURN DUCT LOSSES

 Return duct are normally shorter


than supply duct
 Temperature of air at about 75°F -
80°F
 Return duct slightly negative
 1% for Return duct heat gain &
 1% for return duct leakage loss
HEAT LOAD 2

33
home back next
RETURN AIR or BLOW THRU’
FAN
 Fan and motor heat appear on the
upstream side of the coil.
 …..hp x 2545

HEAT LOAD 2

34
home back next
GRAND TOTAL HEAT

 Total heat load the coil must


remove from the air passing over it.
 Also known as dehumidifier load

HEAT LOAD 2

35
home back next
REFRIGERATION LOAD

 Introducing two additional loads not


experience by the coil
– Piping sensible heat gain
– Pumping heat gain

HEAT LOAD 2

36
home back next
APPARATUS DEW POINT
(ADP)
 Effective Room Sensible Heat (ERSH)
Effective Room Total Heat (ERTH)
 ADP obtained from plot ESHF line
or Table 65
 Indicated ADP & Selected ADP
 ADP must be > 48°F

HEAT LOAD 2

37
home back next
QUESTION

 ERSH = 115 000


 ERLH = 15 000
 Calculate the ESHF
 Find ADP if room is 75°F/55%rh
from table

HEAT LOAD 2

38
home back next
DEHUMIDIFIED AIR QUANTITY

 Dehumidified rise = (trm-tadp)x(1-BF)

 Cfmda = ERSH
1.09 x (trm-tadp)x(1-BF)

HEAT LOAD 2

39
home back next
SUPPLY AIR QUANTITY (cfmsa)

 Outlet temp. diff = RSH =Fdes.dif


(trm - tgrille) 1.09 x cfmda

 Supply cfm = RSH = cfmsa


1.09 x Fdes. dif

 Bypass cfm = cfmsa - cfmda


HEAT LOAD 2

40
home back next
RESULTING ENTERING AND
LEAVING CONDITIONS AT
APPARATUS
 t = trm + cfm x (t - t )
edb oa oa rm
cfmsa

 tldb = tadp + bf x (tedb - tadp)

 tewb & tlwb read from psych. chart


HEAT LOAD 2

41
home back next
SOME EX. OF COMPUTERISED
HEAT LOAD CALCULATIONS
 See Lotus files

HEAT LOAD 2

42
home back next
HEAT LOAD 2 43
GO TO PSYCHRO 2

HEAT LOAD 2

44
home back next

You might also like