Metering Deficiency HT
Metering Deficiency HT
By M. C. Gurani
[email protected]
Power Calculation
Three Phase
Vr
Ir
Ib
Vb Iy Vy
W1
Vp X Ip X cos Ф
R
W2
Vp X Ip X cos Ф
Y
W3
B Vp X Ip X cos Ф
N 3 Vp X Ip X cos Ф
Three Phase Three Wire meter
(Two Watt meter method)
Vry
Vr
Ф
Ir
Vby
Ф
Ib
W1 Vb Iy Vy
VL X IL X cos(30* + Ф)
W2
VL X IL X cos(30*- Ф)
√3 x VL X IL X cos Ф
HT Energy Meter (3Phase 3Wire)
LT CT Meter (3Phase 4Wire)
Poly Phase Meter (3Phase 4Wire)
Multiply Factor (LT)
= Mains Capacity / Meter capacity
Reading X 1
Multiply Factor (HT)
= Mains Capacity / Meter capacity
30/5 X 11000/110
5/5 X 11000/110
4. Ф = 0˚ √3/2 VI √3/2 VI √3 VI
P.F. = 1 (50%) (50%) (100%)
Tamper Analysis
1. Red Phase CT not connected
2. Blue Phase CT not connected
3. Red phase CT polarity reversed
4. Blue Phase CT Polarity reversed
5. ‘R’ & ‘B’ phase CT interchanged
6. ‘R’ phase PT missing
7. ‘Y’ phase PT missing
8. ‘B’ phase PT missing
9. ‘R’ & ‘Y’ PT lead interchanged
10.‘Y’ & ‘B’ PT lead interchanged
11.‘B’ & ‘R’ PT lead interchanged
Tamper Analysis (Practical)
Percentage of Energy Registered to Actual Flow of Energy
S. Type of defect Power PF PF PF PF PF
No factor 0.9 0.8 0.7 0.6 0.5
. 1.0
1. Red Phase CT not connected 50% 63% 60% 75% 82% 100%
2. Blue Phase CT not connected 50% 33% 25% 17% 15% Nil
3. Red phase CT polarity reversed Nil 25% 39.2% 52% 75% 100%
4. Blue Phase CT Polarity Nil -25% -39.2% -52% -75% -100%
reversed
5. ‘R’ & ‘B’ phase CT interchanged Nil Nil Nil Nil Nil Nil
6. ‘R’ phase PT missing 50% 55% 65% 75% 82% 100%
7. ‘Y’ phase PT missing 50% 50% 50% 44% 47% 40%
8. ‘B’ phase PT missing 50% 42% 31% 20% 15% Nil
9. ‘R’ & ‘Y’ PT lead interchanged Nil Creep Creep Creep Creep Creep
forward forward forwar forwar forward
d d
10. ‘Y’ & ‘B’ PT lead interchanged Nil Creep Creep Creep Creep Creep
back back back back back
11. ‘B’ & ‘R’ PT leads interchange Nil Creep Creep Creep Creep Creep
forward forward forwar forwar forward
d d
‘B’ phase CT Reverse
Net Registration
Vry Ir Cos (30˚ + Ф) +
Vby Ib Cos (150˚ + Ф)
= - V I SinФ