ADITYA ENGINEERING COLLEGE (A)
NBA
Criteria 6
Facilities and Technical Support (80)
Dr. A. Saravanan
Professor/ Mechanical
6. Facilities and Technical Support (80)
6.1. Adequate and well equipped laboratories, and technical manpower (40)
6.2. Laboratories: Maintenance and overall ambience. (10)
6.3. Safety measures in laboratories (10)
6.4. Project laboratory/Facilities (20)
Thursday, September 15, 2022 Dr. A. Saravanan 2
6.1. Adequate and well equipped laboratories, and
technical manpower (40)
6.1.1. Adequate well-equipped laboratories to run all the program-specific curriculum
(25)
6.1.2. Availability of adequate and qualified technical supporting staff (15)
Thursday, September 15, 2022 Dr. A. Saravanan 3
6.1 Adequate and well equipped laboratories, and technical manpower
(40)
6.1.1. Adequate well-equipped laboratories to run all the program-specific curriculum
(25)
Self Explanation
1. Additional facilities created for improving the quality of learning experience in
Laboratories.
Thursday, September 15, 2022 Dr. A. Saravanan 4
6.1.1. Adequate well-equipped laboratories to run all the program-specific curriculum
(25)
2. Acoustics, classroom, conditions of chairs/benches, air circulation, lighting
exits, ambiance, and such other amenities/facilities.
3. Availability of individual faculty rooms.
4. Additional facilities created for the students.
Internet Facility
Department Library
Ramp/wash rooms/ wheel Chair
Television
Surveillance Cameras
Digital Library etc.,
Thursday, September 15, 2022 Dr. A. Saravanan 5
6.1.2. Availability of adequate and qualified technical supporting staff (15)
Well Qualified technical supporting staff required.
Self Explanation
Files Required
C6_1. List of non teaching staff with their appointment letters etc.
C6_2. Lab utilization file.
C6_3. Equipment/Software details. (Bills with invoice & Quotation details )
* Lab layout, Lab - Attendance register with Internal mark details
Flex board: List of Equipment and experiment (updated), Vision and Mission
statement, Do’s and Don’ts, Display board etc.,
Thursday, September 15, 2022 Lab Manual with sample reading & 3 sample record note book.
Dr. A. Saravanan 6
6.2. Laboratories: Maintenance and overall ambience. (10)
Self Explanation – Lab wise
Note : Laboratory manuals contains information on vision, mission, PEO, PO,
PSO, safety precautions, equipment handling instructions along with
the details of the experiments.
Required • C6_4. Stock register with yearly stock verification details.
Files • C6_5. Maintenance Register & Consumable register.
Thursday, September 15, 2022 Dr. A. Saravanan 7
6.2. Laboratories: Maintenance
Thursday, September 15, 2022 Dr. A. Saravanan 8
6.3. Safety measures in laboratories (10)
Self Explanation – Lab wise
6.4. Project laboratory/Facilities (20)
Hardware Facilities & Software Facilities
Self Explanation
Required • C6_6. Project lab utilization register. (Student signature)
• C6_7. List of equipment / software used for project purpose.
Files
Thursday, September 15, 2022 Dr. A. Saravanan 9
Next Review meeting for Criteria 6: 24.7.2021
Department wise review
Discussion about all files
Thursday, September 15, 2022 Dr. A. Saravanan 10