Bandra Worli Sea Link: Mumbai'S Link To Future

The Bandra Worli Sea Link is a major cable-stayed bridge that connects the cities of Bandra and Worli in Mumbai, India. It spans over the Mahim Bay and Arabian Sea. The 5.6 km long bridge features a 850m central section supported by large towers. It was built to reduce traffic congestion and reduce travel time between Western suburbs and South Mumbai. Over 120,000 vehicles now use the bridge daily. Its construction involved innovative techniques like pre-casting concrete segments weighing over 120 tons and installing them using large floating cranes.

Uploaded by

Patel Hitesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views59 pages

Bandra Worli Sea Link: Mumbai'S Link To Future

The Bandra Worli Sea Link is a major cable-stayed bridge that connects the cities of Bandra and Worli in Mumbai, India. It spans over the Mahim Bay and Arabian Sea. The 5.6 km long bridge features a 850m central section supported by large towers. It was built to reduce traffic congestion and reduce travel time between Western suburbs and South Mumbai. Over 120,000 vehicles now use the bridge daily. Its construction involved innovative techniques like pre-casting concrete segments weighing over 120 tons and installing them using large floating cranes.

Uploaded by

Patel Hitesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 59

BANDRA WORLI SEA LINK

MUMBAI’S LINK TO FUTURE

PRESENTED BY:-
SIDDHI SHETH.
G.E.C.D.
PROJECT BACKGROUND
BANDRA
T H E
A TS ? ? ?
WH O N?
U TI
SOL
?

8 KM RUN

23 SIGNALS
WORLI
BOTTLENECK CHOKED TRAFFIC

1,20,000 VEHICLES PASSING IN PEAK HOURS


MSRDA PRESENTING THE MODEL
CASE STUDY ON BANDRA WORLI SEA LINK

BANDRA WORLI SEA LINK


PROJECT IS A MAJOR PRECAST
SEGMENTAL CONCRETE BRIDGE
TRAVERSING THE MAHIM BAY
AND ARABIAN SEA TO CONNECT
THE CITY AND THE WESTERN
SUBURBS OF MUMBAI,INDIA.

WESTERN FREEWAY ISLAND PROJECT


TECHNICAL DETAILS

Length of bridge 5.6Km


Length of cable stayed bridge 850m
Cost of project Rs.1306cr
No. of Piers 147
Spacing of Piers 50m
Concrete Used Grade M60
Admixtures Micro silica slurry
SALIENT FEATURES
An 8-lane bridge with 2 lanes dedicated for buses.

A Minimum clearance of 20m will be provided for


marine traffic.

850m cable stay bridge.

Modern toll plaza of 16 lanes with automated toll


collection system.

An intelligent bridge with state - of - art systems for


traffic monitoring, surveillance, emergency support etc.

Development of promenade and landscaping to


enhance the environment. 
CABLE STAYED BRIDGE
WHAT IS CABLE STAYED BRIDGE ???????

A TYPICAL CABLE STAYED BRIDGE IS A


CONTINUOUS GIRDER WITH ONE OR MORE TOWER
ERRECTED ABOVE PIERS IN THE MIDDLE OF THE SPAN.FROM
THESE TOWERS CABLES STRETCH DOWN DIAGONALLY AND
SUPPORT THE GIRDER.
HOW IT WORKS??

• HAND AND HEAD


CONCEPT
• CABLE STAYED BRIDGE BUILT BY BALANCED CANTILEVER METHOD.

The erection proceeds from either side of the pylon in the form
of two cantilever which balance each other. This is the latest
and the most commonly used. The main advantage is that the
traffic below the bridge is not hindered during erection.
CONSTRUCTION TECHNIQUES
CONSTRUCTION OF PIERS
CONCRETING FOR PIER BASE
REINFORCEMENT FOR PIER
PIER SUPPORTING THE DECK

20 M CLEARANCE EVEN
AFTER HIGH TIDE

EPOXY PAINTED TILL


WATER SPLASH LEVEL IN
HIGH TIDE
CONSTRUCTION OF SEGMENTS
VITAL STATISTICS OF SEGMENTS
2.5m 22m

3m

Each Structure Consists Of THREE CELL BOX


Girder with a FISH BELLY CROSS-SECTIONAL
SHAPE. A typical pre-cast segment is 22 meters
wide, 3m deep, 2.5m long and weighs about
120t.
SHIFTING THE CAGE WITH SPREADER BEAM
CONCRETING OF SEGMENTS
STAKING YARD
TRANSPORTING THE SEGMENTS
TRANSPORTING THE SEGMENTS
SEGMENTS ARE TRANSPORTED THROUGH BARGES
CONSTRUCTION OF BRIDGE
LAUNCHING GIRDER CARRIES THE SEGMENT
SEGMENTS ARE HANGED FROM GIRDER BEFORE GLUING
PLACING THE SEGMENTS IN POSITION AND GLUING
THEM AFTER LEVELLING
TOP VIEW
PT CABLES ARE STRESSED WITH THE HELP OF MOBILE CRANE
POST TENSIONING THE CABLES WITH THE JACK
SHIFTING THE GIRDER WITH CRANE
CONSTRUCTION OF TOWER
JACK UP PALTFORM WITH RCD DRILL BIT.
REINFORCEMENT FOR FOUNDATION OF TOWER
COFFER DAM ON TOWER LOCATION
CONSTRUCTION OF V SHAPED COLUMN FOR TOWER
DOKA SELF CLIMBING FORM WORK USED FOR TOWER
CONSTRUCTION OF TOWER
CABLE DETAILS
CABLES STRESSED FROM TOWER
ANCHORAGE
ANCHORS CONNECTING THE CABLE WITH SEGMENT
EQUIPMENTS USED
LAUNCHING GIRDER
ASIAN HERCULES SHEAR LEG CRANE
INTRODUCTION TO THIS MONSTER
ONLY 6 OF THESE PREVAIL IN THIS WORLD.

CAN CARRY 6 SEGMENTS (120T EACH) AT A TIME.

SUBJECTED ON BARGE.

HIRED BY HCC LTD. FROM SINGAPORE

RENT: RS.12,00,00,000 (12CR.)/2 MONTHS.

RENT STARTED SINCE THE DAY IT DEPARTED


FROM SINGAPORE.
SOME PICTURES
VIEW FROM BANDRA END
TEMPRORY BRIDGE CONSTRUCTED TO HAVE ACCESS TO TOWER
DRIVERS VIEW
BENIFITS
Speedy passage to handle 1,20,000 vehicles per day.

Estimated saving in vehicle operating cost -


Rs.100cr / Year

Considerable saving of 30-40 min in travel time.


(23 signals avoided)

Reduction in pollution

Reduction in traffic on existing roads


TOLL PLAZA
16-LANE STATE-OF-ART TOLL PLAZA
FULLY AUTOMATIC, SEMI AUTOMATIC & MANUAL
TOLL COLLECTION.
VIDEO SURVILLANCE
TOLL CHARGES:
4-WHEELERS Rs.30
OTHERS Rs.60
(TWO/THREE WHEELERS NOT ALLOWED)
AMAZING FACTS
Length of the steel Circumference of the
wires used earth
Weight of the Sea link weight of 50,000
Bridge African elephants
Height of the cable- 43 storied building
stay towers
Length of the Sea link 63 times the height of
Bridge the Qutub Minar
CONCLUSIONS
THIS MEGA-PROJECT WILL CHANGE ENTIRE
SCENARIO OF MUMBAI’S TRAFFIC .

THIS IS JUST THE BEGINNING OF WESTERN


FREEWAY ISLAND PROJECT WHICH WILL SOLVE
THE TRAFFIC PROBLEM FOR NEXT 100YEARS.
COMPANY WORKING ON THIS PROJECT

CONSULTANT: DAR CONSULTANTS (UK)

CONTRACTOR: HINDUSTAN CONSTRUCTION


COMPANY LTD. (HCC LTD.)