The document discusses FMEA (Failure Mode and Effects Analysis) and outlines the 7 step approach to FMEA according to AIAG-VDA standards. It describes the steps as Planning and Preparation, Structure Analysis, Function analysis, Failure Analysis, Risk Analysis, Optimization, and Result Documentation. The acronym PS2FROR is provided to help remember the 7 steps. Examples of PM, skill matrix, training reports, Q alerts, and process qualification are also mentioned.

Uploaded by

mahesh Khatal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views12 pages

Aiag-: Electrica India 1

The document discusses FMEA (Failure Mode and Effects Analysis) and outlines the 7 step approach to FMEA according to AIAG-VDA standards. It describes the steps as Planning and Preparation, Structure Analysis, Function analysis, Failure Analysis, Risk Analysis, Optimization, and Result Documentation. The acronym PS2FROR is provided to help remember the 7 steps. Examples of PM, skill matrix, training reports, Q alerts, and process qualification are also mentioned.

Uploaded by

mahesh Khatal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 12

ELECTRICA ENGINEERS (INDIA) PVT. LTD.

AIAG-VDA-FMEA

ELECTRICA INDIA 1
5 CORE TOOLS QUALITY

CORE QUALITY TOOLS

• APQP
• FMEA
• PPAP
• SPC
• MSA
FMEA-FAILURE MODE AND EFFECTS ANALYSIS

FMEA-FAILURE MODE AND EFFECTS ANALYSIS


7 STEPS APPROACH IN AIAG-VDA FMEA

Seven step Approach in AIAG-VDA FMEA


How to Remember 7 step Approach :- PS 2F ROR

P-Planning and Preparation


S-Structure Analysis
F-Function analysis
F-Failure Analysis
R-Risk Analysis
O-Optimization
R-Result Documentation.
7 STEPS APPROACH IN AIAG-VDA FMEA
PM done of end of line fixture
Skill Matrix Displayed

Date::04.07.2015 ELECTRICA INDIA 7


Training Report

Date::04.07.2015 ELECTRICA INDIA 8


Q alert

Date::04.07.2015 ELECTRICA INDIA 9


Flypress Stroke length Process Qualification

Date::04.07.2015 ELECTRICA INDIA 10


SOP
THANK YOU