What is work study ???
12/27/2021
2
Why We Need Work Study
1. Improving the Productivity.
Motion study
Time study
Manually PMTS
(GSD)
General Sewing Cycle
Handling Time
Stitching Time
Gamini Wijekoon
What Is Productivity
Productivity is the parameter of measuring the use Of
Resources in an Organization.
The other way, it’s The Ratio of Out put & In put.
12/27/2021
Why we need to go for
the ‘SMV’
= 0 .263
Adding allowance,
Consider the operation carry out in an environment with specific conditions and use SNL
lock stitch machine. An allowance of 18% is added in such a situation.
• SMV = 0 .31
= 60
0.31
•
100% SMV target = 194 pcs
Line Target of a Style.
12.52
= 2760
12.52
= 220 pcs If 70 % eff = 220 X 0.7
= 154pcs
Process Target Calculation
• Target = 60 minutes (1 hour)
SMV
Ex;
- 107 pcs
Ex;
Product - Tee Shirt
Minute value(SMV) - 12.50
Production - 1200 pcs
- 12.50 X 1200 / 60
- 250 Hour
What Is Capacity?
Calculation Of Capacity
• Capacity is the capability of a Manpower. It means how much
production can give by A Manpower.
L-1 Below 4.99 20% 30% 40% 60% 65% 65% 70% 70% 70% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 80%
Over 5.00-
L-2 Below 12.00 20% 30% 40% 60% 60% 65% 65% 70% 70% 70% 75% 75% 75% 75% 75% 75% 75% 75% 75% 80%
Over 12.01 -
L-3 Below 18.00 20% 30% 40% 50% 60% 60% 65% 65% 70% 70% 70% 70% 70% 75% 75% 75% 75% 75% 75% 80%
L-4 Over 18.01 10% 20% 30% 40% 50% 60% 60% 60% 65% 65% 65% 65% 65% 65% 70% 70% 70% 70% 70% 75%
SMV less than two minutes, within the range then
Current to Similar below learning curve will be
applied.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Current to
Similar 30% 50% 60% 65% 65% 70% 70% 70% 75% 75% 75% 75% 80% 80% 80% 80% 80% 80% 80% 80
QCO & THROUGHPUT
TIME
• QCO= QUICK CHANGE OVER. TIME BETWEEN OLD
STYLE LAST OUTPUT & NEW STYLE 1ST OUTPUT.
FEEDING END
FEEDING START TIME TIME TTL TIME TAKEN
Component Operation Type of Basic SMV Target Target THI Act. Op No of No of Attachments
M/c Time 100% 80% Load M/C Help
1 FRONT Sew Front Rise 4TOL 14.856 0.2476 242 194 1.0 1 1
2 Attach Upper Pocket Bag At Body SNLS 27.27 0.4545 132 106 1.8 2 2
3 BackStitch at Pocket Bag. SNLS 12.996 0.2166 277 222 0.9 1 1
4 Mark Lower Pocket Bag HEL 7.638 0.1273 471 377 0.5 0.5
BALANCE
5 Match Pocket & Body HEL 5.814 0.0969 619 495 0.4 0.5
6 Close Pocket Bag 4TOL 26.256 0.4376 137 110 1.8 2 2
7 Tack Lower Pocket Bag At Body SNLS 22.434 0.3739 160 128 1.5 1 2
8 Tack Pocket Bag at Waist Position SNLS 19.842 0.3307 181 145 1.3 1 1
9 Tack At O/L Stitch End - SNLS 13.344 0.2224 270 216 0.9 1 1
10 BACK Sew Back Rise 4TOL 15.15 0.2525 238 190 1.0 1 1
11 ASSEMBLE Match Back and front HEL 6.192 0.1032 581 465 0.4 1
12 Sew Inseam 4TOL 14.34 0.2390 251 201 1.0 1 1
Bartack at Inseam - Only 1 BTK at inseam motion without bundle handling
13 13+38
time(Only balancing process) BTK 3.036 0.0506 1186 949 0.2 0.5 1
14 Sew Bottom Hem 3TFL 33.162 0.5527 109 87 2.2 2 2
15 Cut excess at Bottom. HEL 12.276 0.2046 293 235 0.8 1
16 Measure And Cut Waist Elastic HEL 5.88 0.0980 612 490 0.4 0.5
17 Elastic tack SNLS 9.084 0.1514 396 317 0.6 1 1 BALANCE
18 Mark Waist Elastic. HEL 5.79 0.0965 622 497 0.4 0.5
19 Tack at Bottom Hem SNLS 18.558 0.3093 194 155 1.3 1 1
20 Sew Side Seam 4TOL 20.754 0.3459 173 139 1.4 1.5 2 20+24
21 1/4 Tack at side seam SNLS 15.414 0.2569 234 187 1.0 1 1
22 Make Waist Band Ring SNLS 15.054 0.2509 239 191 1.0 1 1
23 Mark Waist Band for Attach & Tack. HEL 13.38 0.2230 269 215 0.9 1
24 Attach Waist Band At Body 4TOL 38.166 0.6361 94 75 2.6 2.5 3 20+24
25 Top Stitch At Waist Band 3TFL 16.428 0.2738 219 175 1.1 1 1
26 Back/Edge Stitch at waist band SNLS 36.126 0.6021 100 80 2.4 2 2
27 Fold & Tack Waist Elastic SNLS 42.426 0.7071 85 68 2.9 3 3
28 Close Waist Band T/C 42.36 0.7060 85 68 2.9 3 3
29 Remove Tack at Waist Band HEL 15.918 0.2653 226 181 1.1 1
30 Mark Waist Band For Eylet HEL 15.27 0.2545 236 189 1.0 1
31 Eyelet Punch EYPN 8.682 0.1447 415 332 0.6 0.5 1
32 Eyelet Attach EYAT 13.584 0.2264 265 212 0.9 0.5 1
33 Make Care Label SNLS 11.79 0.1965 305 244 0.8 1 1
34 Tack Care Label SNLS 20.964 0.3494 172 137 1.4 2 2
35 Attach Main Label at Waist & size label at waist SNLS 18 0.3000 200 160 1.2 1 1
36 Fold & Tack Drawcord Mouth SNLS 17.424 0.2904 207 165 1.2 1 1
37 Insert drawcord HEL 35.094 0.5849 103 82 2.4 2
38 Bartack At Waist band BTK 11.712 0.1952 307 246 0.8 0.5 1 13+38
682 11.37 287 230 46.0 37.0 41.0 9.0
No of Target
ACT OP. Bottleneck
MACHINERY REQUIREMENT Basic Time SMV THI M/c NO OF Hel 80%
Load M/C Trgt/hr
SNLS 300.73 5.01 20.3 20.0 21.0 0.0 168
4TOL 129.52 2.16 8.7 9.0 10.0 0.0 151
3TFL 49.59 0.83 3.3 3.0 3.0 0.0 131
BTK 14.75 0.25 1.0 1.0 2.0 0.0 597
68
EYAT 13.58 0.23 0.9 0.5 1.0 0.0 212
EYPN 8.68 0.14 0.6 0.5 1.0 0.0 332
T/C 42.36 0.71 2.9 3.0 3.0 0.0 68
HEL 123.25 2.05 8.3 0.0 0.0 9.0 323
Total 682.46 11.37 46.0 37.0 41.0 9.0
FOLD AND ATTACH NECK
41 TOP STITCH AT SLEEVE CUFF 118 67 42 136
33 206 0.51 40TAPE 206 0.44 136
TOP STITCH AT BOTTOM RIB -70
154 #DIV/0!
35CM 206 0.39 - 206 -
- 206 - - 206 -
M/c Sl.1 3T F/L Mins utilized 185 M/c Sl.1 SNLS Mins utilized 91
M/c Sl.2 M/c Sl.2
Attach: 0 Attach:
OPTR OPTR
Skill NAME Skill NAME
TOP STITCH AT BOTTOM RIB -70
39 154 154 40 TOP STITCH AT SLEEVE CUFF 118
35CM 206 0.39 33 206 0.51 118
#DIV/0! #DIV/0!
- 206 - - 206 -
- 206 - - 206 -
M/c Sl.1 3T F/L Mins utilized 80 M/c Sl.1 3T F/L Mins utilized 105
M/c Sl.2 M/c Sl.2
Attach: 0 Attach:
OPTR OPTR
Skill NAME Skill NAME
37
32
ATTACH SLEEVE CUFF 206 0.48
125 66 38
34
ATTACH BOTTOM RIB-70 CM 206 0.43 140
140