Overview of C&I Systems

The document discusses the control and instrumentation (C&I) systems used in power plants. It describes the distributed control and data management and information system (DDCMIS) which provides integrated control of the steam generator, turbine, and balance of plant. The major components of the DDCMIS are the control system, man-machine information and plant information system, and redundant data communication system. The control system includes subsystems for steam generator control and instrumentation, turbine control and instrumentation, and balance of plant open loop and closed loop control.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
129 views

Overview of C&I Systems

The document discusses the control and instrumentation (C&I) systems used in power plants. It describes the distributed control and data management and information system (DDCMIS) which provides integrated control of the steam generator, turbine, and balance of plant. The major components of the DDCMIS are the control system, man-machine information and plant information system, and redundant data communication system. The control system includes subsystems for steam generator control and instrumentation, turbine control and instrumentation, and balance of plant open loop and closed loop control.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 51

OVERVIEW OF C&I

SYSTEMS
IN POWER PLANT

Tuesday, November 30, PMI Revision 00 1


2021
SALIENT FEATURES AND

MAJOR COMPONENTS OF

DDCMIS

Tuesday, November 30, PMI Revision 00 2


2021
SALIENT FEATURES OF DDCMIS

• INTEGRATED PLANT CONTROL FOR SG, TG


AND BALANCE OF PLANT CONTROL
• IT MAY BE REMEMBERED THAT
HISTORICALLY THE TERM DDCMIS USED TO
BE REFERRED FOR THE SO-CALLED “BOP-
C&I” . THE SG-C&I, i.e. FSSS etc. TG-C&I i.e.
ATRS, TURBINE PROTECTION etc. ORIGINALLY
WERE NOT CONSIDERED UNDER DDCMIS OR
DCS AS PER MANY SUPPLIERS. ONLY
RECENTLY THE TYPE OF SYSTEMS FOR ALL
THE SYSTEMS HAVE BECOME SIMILAR

Tuesday, November 30, PMI Revision 00 3


2021
SALIENT FEATURES OF DDCMIS

• INTEGRATED PLANT OPERATION THROUGH FULLY


INTERCHANGEABLE OPERTAOR WORK STATIONS
(OWS) FOR SG, TG AND BALANCE OF PLANT
(SOMETIMES THIS MAY NOT BE POSSIBLE DUE TO
PACKAGING CONCEPT)

Tuesday, November 30, PMI Revision 00 4


2021
SALIENT FEATURES OF DDCMIS

• PROVISION OF EXTENSIVE SELF-


DIAGNOSTICS
• USE OF LARGE VIDEO SCREENS FOR
PROJECTIONS OF VARIOUS PLANT MIMICS
ETC.
• PROVISION OF FAULT ALARM ANALYSIS TO
GUIDE THE OPERATOR TO THE MOST LIKELY
EVENT
• PROVISION OF TREND ALARMS

Tuesday, November 30, PMI Revision 00 5


2021
SALIENT FEATURES OF DDCMIS

• PROVISION OF SAFETY HARDWARE FOR


BURNER MANAGEMENT SYSTEMS

• PROVISION OF FAIL-SAFE HARDWARE FOR


TURBINE PROTECTION SYSTEM

• PROVISION OF ADEQUATE RELIABILITY AND


AVAILABILITY WITH PROPER REDUNDANCY IN
SENSOR, I/O AND CONTROLLER.

Tuesday, November 30, PMI Revision 00 6


2021
DDCMIS CONFIGURATION ST-1
AND ST-2 COMPARISON

maxDNA
SYSTEM
ENGG. STN
HMI
FOR HMI

PROCONTROL MMI LAN


SYSTEM
HMI
REDUNDANT
SERVERS
ENGG.STN.
FOR CONTROL SYS. I.P. BUS Max. 4
nos. rdundant

Redundant
F.G.Controllers

Measurement system / I/O


subsystem

Tuesday, November 30, PMI Revision 00 7


2021
MAJOR COMPONENTS OF
DDCMIS

Tuesday, November 30, PMI Revision 00 8


2021
MAJOR COMPONENTS OF
DDCMIS

• CONTROL SYSTEM

• MAN-MACHINE INFORMATION AND PLANT


INFORMATION SYSTEM (MMIPIS)

• REDUNDANT DATA COMMUNICATION SYSTEM


(DCS)

Tuesday, November 30, PMI Revision 00 9


2021
MAJOR COMPONENTS OF
DDCMIS

• SEQUENCE OF EVENT (SOE ) AND ANNUNCIATION


SYSTEM FUNCTIONS

• SYSTEM PROGRAMMING FACILITY


a) TUNING & CONFIGURATION FOR CONTROL
SYSTEM
b) MODIFICATION & PROGRAM DEVELOPMENT FOR
MMIPIS

• MASTER & SLAVE CLOCK SYSTEM

Tuesday, November 30, PMI Revision 00 10


2021
CONTROL SYSTEM

Tuesday, November 30, PMI Revision 00 11


2021
CONTROL SYSTEM
PROGRAMMING & MMIPIS M&S
CONFIGURATION SYSTEM CLOCK

DCS

SG- C&I BOP- C&I TG- C&I


SYSTEM SYSTEM SYSTEM

Tuesday, November 30, PMI Revision 00 12


2021
SG-C&I SYSTEM
• CONSISTS OF BURNER MANAGEMENT
SYSTEM (BMS), SOOT BLOWER CONTROL
SYSTEM (SBC), SECONDARY AIR DAMPER
CONTROL SYSTEM (SADC), AUXILIARY PRDS
CONTROLS (APRDS)
• FOR BMS, “SAFETY SYSTEM” HARDWARE IS
SPECIFIED, i.e. THE HARDWARE , WHICH
MEETS THE REQUIREMENT OF RELEVANT
NFPA AND VDE STANDARDS`

Tuesday, November 30, PMI Revision 00 13


2021
SG-C&I SYSTEM

• TRIPLE REDUNDANT CONFIGURATION FOR THE


FURNACE PROTECTION (MFT) PORTION OF BURNER
MANAGEMENT SYSTEM (BMS)
• FOR SBC, SADC, APRDS,MILL & OIL ELEV. SEQUENCE,
INTERLOCK AND PROTECTION, CONFIGURATION
SIMILAR TO OLCS/CLCS (DESCRIBED LATER)
• FOR MILL & OIL ELEV. LOGICS, SAFETY SYSTEM
HARDWARE SHALL BE USED

Tuesday, November 30, PMI Revision 00 14


2021
TG-C&I SYSTEM

• CONSISTS OF TURBINE PROTECTION SYSTEM


(TPS), AUTOMATIC TURBINE RUN-UP SYSTEM
(ATRS), AUTOMATIC TURBINE TESTING SYSTEM
(ATT), ELECTRO- HYDRAULIC TURBINE
CONTROL SYSTEM (EHTC) FOR MAIN & BFP
TURBINE, TURBINE STRESS CONTROL SYSTEM
(TSCS), GLAND STEAM PRESSURE CONTROL
GENERATOR SEAL OIL, PRIMARY WATER &
HYDROGEN CONTROL SYSTEM (RECENT
ADDITION).

Tuesday, November 30, PMI Revision 00 15


2021
TG-C&I SYSTEM

• TRIPLE REDUNDANT OR 2 X 100 % REPEATED


TWICE CONFIGURATION FOR THE TURBINE
PROTECTION SYSTEM (TPS). FOR THIS,
SAFETY SYSTEM HARDWARE / FAIL-SAFE
HARDWARE SHALL BE USED
• FOR OTHERS, CONFIGURATION SIMILAR TO
OLCS/CLCS (DESCRIBED LATER) TO BE USED

Tuesday, November 30, PMI Revision 00 16


2021
BOP-C&I SYSTEM

• CONSISTS OF OPEN LOOP CONTROL SYSTEM


(OLCS) AND CLOSED LOOP CONTROL SYSTEM
(CLCS)

• OLCS -THE SEQUENCE CONTROL, INTERLOCK OF OF


ALL THE PLANT SYSTEMS WHICH ARE NOT COVERED
IN THE SG-C&I AND TG-C&I. THIS INCLUDES MAJOR
AUXILIARIES LIKE FD/ID/PA FANS, AIR-PREHEATER,
BFP/CEP/CWP/ BCWP , DMCWP/CLCWP AND
ELECTRICAL BREAKERS.

Tuesday, November 30, PMI Revision 00 17


2021
BOP-C&I SYSTEM

• (CLCS) -THE MODULATING CONTROL FOR VARIOUS


IMPORTANT PLANT PARAMETERS, LIKE FW FLOW
(DRUM LEVEL), FURNACE DRAFT, COMBUSTION
CONTROL (FUEL FLOW AND AIR FLOW), PA HDR
PRESSURE CONTROL,
DEAERATOR/HOTWELL/HEATER LEVEL CONTROLS
ETC.

Tuesday, November 30, PMI Revision 00 18


2021
MMIPIS

Tuesday, November 30, PMI Revision 00 19


2021
MAN-MACHINE INTERFACE AND
PLANT INFORMATION SYSTEM
• LATEST STATE-OF-THE-ART WORKSTATIONS /PCs AND
SERVERS BASED ON OPEN-ARCHITECTURE AND
INDUSTRY STANDARD HARDWARE AND SOFTWARE TO
ENSURE BETTER CONNECTIVITY.
• e.g. HARDWARE FROM COMPAQ/DIGITAL, HP, SUN
MICRO-SYSTEM OR OTHER MAJOR SUPPLIERS (LESS
DEPENDENCE ON THE C&I SYSTEM SUPPLIER IN THE
LONG RUN)
• OPERATING SYSTEM WINDOWS-2000, OPEN-VMS OR
UNIX.

Tuesday, November 30, PMI Revision 00 20


2021
MAN-MACHINE INTERFACE AND
PLANT INFORMATION SYSTEM
• 64/ 32-BIT SERVER/OWS WITH HIGH-SPEED AND
LARGE MEMORY (256/512 MB RAM, 8 GB HDD FOR
SERVER AND 128/256 MB RAM AND 4/6 GB HDD FOR
OWS) TO ENSURE FAST RESPONSE
• PROVISION OF LVS
• CONNECTION TO OTHER SYSTEM THROUGH
STATIONWIDE WAN

Tuesday, November 30, PMI Revision 00 21


2021
MMIPIS FUNCTIONALITIES
• VPC OPERATION
• OTHER OPERATOR INFORMATIONS THROUGH
VARIOUS DISPLAYS
• ALARMS, LOGS, HISTORICAL AND LONG TERM
STORAGE.
• PERFORMANCE AND OTHER CALCULATIONS

Tuesday, November 30, PMI Revision 00 22


2021
MMI SYSTEM- P13 DCS ST-1 SIMHADRI
LVS -1 LVS -2 LVS -3 LVS -4

WORKSTATIONS
WSPOSE PANEL
LAN
SERVER2 SERVER1
IPB
ACCESS
COUPLER

SG PACKAGE TG PACKAGE STN. C&I


(17 L.B.) (20 L.B.) (65 L.B.)
IPB - 1

IPB - 2

IPB - 3

IPB - 4
IPB to WSPOSE CONNETION
IPB Line B MMI
WSPOSE-1
IPB Line A SERVER-1
70
FK01 70
70FA01 CK
70 01
70FV01b 70FV01b
FK01

WSPOSE-2 SERVER-2
70
FK01 70
CK
70 01
FK01
WSPOSE MODULES

US (15V)
VOC 5V
Z 0V

ADDRESS BUS
Serial CKA RECEIVE
To RAM
DATA BUS RECEIVE
parallel CKD
16K X16
DATA BUS TRANSMIT RT GB
Parallel CIFD
To serial
20 INC

CONTROL BUS TRANSMIT


Control RAM
logic
1/2K X16
VME
64 POLE CONNECTOR STRIP
BUS
|X|X|
70CK01
PCIF
Tuesday, November 30, PMI Revision 00 26
2021
Tuesday, November 30, PMI Revision 00 27
2021
Tuesday, November 30, PMI Revision 00 28
2021
Tuesday, November 30, PMI Revision 00 29
2021
Tuesday, November 30, PMI Revision 00 30
2021
Tuesday, November 30, PMI Revision 00 31
2021
Tuesday, November 30, PMI Revision 00 32
2021
Tuesday, November 30, PMI Revision 00 33
2021
Tuesday, November 30, PMI Revision 00 34
2021
SOE

Tuesday, November 30, PMI Revision 00 35


2021
• SEQUENCE OF EVENT (SOE ) AND ANNUNCIATION
SYSTEM FUNCTIONS

• ORIGINALLY THESE USED TO BE STAND-ALONE


SYSTEM (DIODE AUCTIONEERING, DBTC ETC
REQUIRED)
• NOW INTEGRATED -THEREFORE THE DIODE
AUCTIONEERING, DBTC ETC NOT REQUIRED
• SOE - 1mS RESOLUTION, STORAGE OF REPOTRS FOR
LONG DURATION
• ANNUNCIATION LOGIC THROUGH OLCS/CLCS
CONTROLLERS.

Tuesday, November 30, PMI Revision 00 36


2021
SYSTEM
PROGRAMMING
FACILITY

Tuesday, November 30, PMI Revision 00 37


2021
SYSTEM PROGRAMMING FACILITY

• LATEST TREND - COMBINED CONTROL


SYSTEM TUNING & MMIPIS PROGRAMMING
• SELF-DOCUMENTATION
• ENGINEERING WORKSTATIONS

Tuesday, November 30, PMI Revision 00 38


2021
Object-Oriented Configuration

• Graphical object-oriented
configuration software tool
• Includes self-documentation
of configuration
• True object-oriented
features including
encapsulation and
inheritance
• Library of standard
algorithms or “objects”
Tuesday, November 30, PMI Revision 00 39
2021
C
MASTER & SLAVE
CLOCK SYSTEM

Tuesday, November 30, PMI Revision 00 40


2021
MASTER & SLAVE CLOCK SYSTEM

• RECEIVES TIME SYNCHRONISATION SIGNALS


EITHER FROM THE GEO-POSITIONARY
SATELITE (NPL SIGNAL)

• DISTRIBUTES THIS SIGNAL TO THE MMIPIS


AND THE CONTROL SYSTEM.

Tuesday, November 30, PMI Revision 00 41


2021
OTHER RELATED TOPICS

Tuesday, November 30, PMI Revision 00 42


2021
OTHER RELATED TOPICS

• POWER SUPPLY SYSTEM

• CABLING & TERMINATION OTHER


SG/TG C&I SYSTEM/ EQUIPMENT
• PACKAGING CONCEPTS- SCOPE OF
SUPPLY OF C&I SYSTEM/PACKAGE

Tuesday, November 30, PMI Revision 00 43


2021
OTHER RELATED TOPICS

• OPERATION PHILOSOPHY , CONTROL


AREA AND BACK-UP INSTRUMENTATION
& GEOGRAPHICAL DISTRIBUTION -
COMBINED CYCLE PLANTS
• REDUNDANCY
• DESIGN CRITERIA

Tuesday, November 30, PMI Revision 00 44


2021
POWER SUPPLY SYSTEM
• CONTROL SYSTEM POWER SUPPLY TWO SETS OF DC POWER
SUPPLIES - ONE SET FOR SG/TG-C&I AND OTHER FOR BOP-C&I
EACH WITH 2 X 100 % CHARGER AND 2 X 100 % BATTERY

• OTHER IMPORTANT AC LOADS LIKE MMIPIS, PANEL


INSTRUMENTS, ANALYSERS ETC. SHALL BE POWERED FROM
UPS COMPRISING OF 2 X 100 % CHARGER, 2 X 100 %
INVERTER AND 1 X 100 % BATTERY

• HEAVY DUTY Ni-Cd BATTERIES HAVE BEEN ENVISAGED FOR


LONGER LIFE & LESSER MAINTENANCE

Tuesday, November 30, PMI Revision 00 45


2021
CABLING & TERMINATION
• EXTENSIVE GROUPING OF SIGNALS BY LARGE
SCALE USE OF JBs AT STRATEGIC LOCATIONS

• USE OF CABLES WITH HIGHER NO OF PAIRS

• USE OF CAGE-CLAMP CONNECTION FOR SYSTEM


CABINETS, MARSHALLING PANELS & OUTGOING
SIDE OF JBs, CJS BOXES etc.

• USE OF PLUG-IN SOCKET AND CONNECTORS FOR


TRANSMITTERS, SWITCHES, LS/TS etc.
Tuesday, November 30, PMI Revision 00 46
2021
IMPORTANT SG/TG RELATED C&I
SYSTEM
• FLAME MONITORING SYSTEM

• COAL FEEDER C&I

• ELECTROMATIC SAFETY VALVES

• FURNACE TEMP PROBES

• ACCOUSTIC PYROMETER FOR FURNACE TEMP PROFILE

• BOILER FLAME ANALYSIS SYSTEM

• COAL BUNKER LEVEL MONITORING SYSTEM

• ELECTRONIC DRUM/SEPARATOR LEVEL MONITORING SYSTEM

• TURBINE SUPERVISORY SYSTEM

• TDBFP TURBINE SUPERVISORY SYSTEM

• IN PACKAGED SYSTEM, THESE ARE UNDER SG & TG PACKAGES.

Tuesday, November 30, PMI Revision 00 47


2021
OPERATION PHILOSOPHY
• CENTRALISED OPERATION OF MAIN PLANT THROUGH OWS & LVS

• OFF-SITE PLANTS TO BE CONTROLLED FROM THEIR LOCAL


STATIONS WITH STATION-WIDE LAN DATA LINK

• MINIMUM BACKUP INSTRUMENTATION ( ORIGINALLY


CONSERVATIVE, NOW REDUCED. CRITERIA - HANDLING
EMERGENCY & SAFE SHUT-DOWN)

• GEOGRAPHICAL DISTRIBUTION - ALTHOUGH NOT VERY USEFUL


FOR POWER PLANTS AS COMPARED TO PROCESS/INDUSTRIES,
BEING ADOPTED FOR FEW AREAS WHERE SIGNALS ARE
CONCENTRATED (REDUCTION OF CABLING, MUCH LESS
ERECTION & COMMISSIONING TIME)

Tuesday, November 30, PMI Revision 00 48


2021
DESIGN CRITERIA
• PROVENNESS
– SUPPLIER’S EXPERIENCE
– SYSTEM EXPERIENCE
– PROVENNESS VS OBSOLESCENCE
• RELIABILITY AVAILABILITY
– HARDWARE QUALITY (PUBLISHED MTBF etc.)
– CONFIGURATION
– REDUNDANCY
– FAULT TOLERANCE
• STANDARDISATION AND UNIFORMITY OF H/W
– SAME SERIES & FAMILY OF H/W AS FAR AS POSSIBLE
– DIFFICULTIES BECAUSE OF PACKAGING CONCEPTS &
RESPOSIBILITY CENTRE & INTERFACES (EVEN IN TURNKEY
PACKAGE)

Tuesday, November 30, PMI Revision 00 49


2021
DESIGN CRITERIA
• OPERABILITY
– DESIGN CONCEPT - FAIL SAFE ETC.
– FALSE TRIP VS SAFETY
– OPERATOR CONVENIENCE DURING NORMAL RUNNING &
EMERGENCY
– MANAGEMENT REPORTING

• MAINTAINBILITY
– STANDARDISATION (AS INDICATED ABOVE)
– MODULAR DESIGN AND EXPANDABILITY
– DIAGNOSTIC, FAULT IDENTIFICATION AND FAULT TOLERANCE
– GUARD AGAINST OBSOLESCENCE
– AVAILABILTY OF SPARES
• OTHER CRITERIA
– UNIT OPERATION PHILOSOPHY
– MARKET TRENDS AND EVOLUTION OF INFORMATION TECHNOLOGY
– FEEDBACKS FROM EXISTING SYSTEMS
Tuesday, November 30, PMI Revision 00 50
2021
THANK YOU

Tuesday, November 30, PMI Revision 00 51


2021