0% found this document useful (0 votes)
123 views27 pages

RF Automatic Fault Protection for Transformers

This document proposes an RF-based automatic protection system for distribution transformers. The system continuously monitors key parameters like current, voltage, oil flow, oil level and temperature. If any parameter exceeds its threshold, a relay trips the transformer and an RF module transmits the fault details and location to the nearby electric board station. The system aims to prevent transformer failures and ensure a reliable power distribution network. It provides automatic monitoring and protection to improve the robustness of distribution transformers.

Uploaded by

grgbalan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
123 views27 pages

RF Automatic Fault Protection for Transformers

This document proposes an RF-based automatic protection system for distribution transformers. The system continuously monitors key parameters like current, voltage, oil flow, oil level and temperature. If any parameter exceeds its threshold, a relay trips the transformer and an RF module transmits the fault details and location to the nearby electric board station. The system aims to prevent transformer failures and ensure a reliable power distribution network. It provides automatic monitoring and protection to improve the robustness of distribution transformers.

Uploaded by

grgbalan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd

RF BASED AUTOMATIC PROTECTION SYSTEM FOR

DISTRIBUTION TRANSFORMER

SUBMITTED BY
[Link]
[Link]
[Link]
[Link]
UNDER THE GUIDANCE OF
[Link], M.E.,

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING


SASURIE COLLEGE OF ENGINEERING
VIJAYAMANGALAM-638056
12/08/21 SCE 1
ABSTRACT
• In India Power Distribution is done through Step-Down and
Step-Up Transformers.
• So Transformers plays a crucial role in Electricity Board for
Power Distribution.
• Every street consists of a Transformer (Step-Down) for the
end user distribution.
• During strange events for some reasons the transformer is
burned out due to the over load and short circuit in their
winding.
• Also the oil temperature is increased due to the increase in the
level of current flowing through their internal windings.

12/08/21 SCE 2
Cont…

• “RF Based Automatic Fault Protection System for


Distribution Transformer” is built to do the above task
automatically.
• This continuously monitor parameters of the transformer
and inform to us if there is any problem is occur.
• RF Module is used to transmit the details of transformer,
location, and identified problem to the nearby EB Station.
• 433 MHz Transmitter and Receiver is used in this
project.

12/08/21 SCE 3
CONTENTS

• Drawbacks of existing system


• Block diagram
• Circuit diagram
• Current measurement
• Voltage measurement
• Flow measurement
• Level measurement
• Temperature measurement
• Relay
• Transmitter
• Receiver

12/08/21 SCE 4
DRAWBACKS OF EXISTING SYSTEM

• The electric lines users have identified that the number


of drawbacks caused by electrical power quality
variations are increasing rapidly.
• These variations have already existed on electrical
systems, but recently they are causing serious
problems.
• Only meager recorded data is available at limited
substation locations in certain systems.
• When a fault occurs in such systems, only a few (two
or three) recording devices are triggered.
12/08/21 SCE 5
CAUSES OF FAILURE
• Insufficient Oil level.
• Seepage of water in oil.
• Prolonged Over loading.
• Single Phase loading.
• Unbalanced loading.
• Faulty Termination (Improper sized lugs etc)
• Power Theft.
• Prolonged Short Circuit.
• Faulty operation of tap changer switch.
• Lack of installation checks.
• Bad Quality of raw material.
• Transit damaged transformers.
• After failure , transformer is removed and replaced with new/repaired one
without removing the cause of failure which results in immediate or short
time failure.

12/08/21 SCE 6
BLOCK DIAGRAM

12/08/21 7
SCE
BLOCK DIAGRAM

RECEIVER

12/08/21 SCE 8
CIRCUIT DIAGRAM

12/08/21 SCE 9
CIRCUIT DIAGRAM
RECEIVER

12/08/21 SCE 10
CURRENT MEASUREMENT

12/08/21 SCE 11
Cont….

• Shunt resistor

• Precision rectifier
low voltage
rectify ac to dc

• Summing amplifier
double the voltage value

12/08/21 SCE 12
VOLTAGE MEASUREMENT

12/08/21 SCE 13
Cont….

• Step-down transformer
230v-6v

• Precision rectifier
low voltage
rectify ac to dc

• Summing amplifier
double the voltage
12/08/21 SCE 14
FLOW MEASUREMENT

12/08/21 SCE 15
Cont….

• Hall effect sensor


3 terminal
5 v-input
output
ground
• Rotating part
fan

12/08/21 SCE 16
LEVEL MEASUREMENT

12/08/21 SCE 17
Cont….

• Variable pot-meter

• Offset voltage

• Amplifier

12/08/21 SCE 18
TEMPERATURE MEASUREMENT

• Temperature increases
the value of thermal
resistance decreases or
vice versa.
• Therefore voltage drop
across it changes.
• And the output voltage
changes.

12/08/21 SCE 19
RELAY

12/08/21 SCE 20
Cont….

• High pulse signal - base of the Q1 transistors - shorts the


collector and emitter terminal - zero signals - base of the Q2
transistor
• Relay - turned OFF state
• Low pulse - base of transistor Q1 transistor - turned OFF
• 12v - base of Q2 transistor – conducting - relay - turned ON
• Hence the common terminal and NO terminal of relay are
shorted.
• Now load gets tripped through relay.

12/08/21 SCE 21
TRANSMITTER

12/08/21 SCE 22
Cont….

• Frequency shift keying


• XR-2206 is a waveform generator
• XR-2206 generating two set of frequency 1200 Hz
and 1400 Hz
• When ever the high output pulse is given to base of
the transistor BF 494, the transistor is conducting so
tank circuit is oscillated
• After the filtration the RF modulated signal is
transmitted through antenna.

12/08/21 SCE 23
RECEIVER

12/08/21 SCE 24
Cont….

• The received data is given to transistor which acts as amplifier.


• Carrier signal is removed and saw tooth signal is appears
across the capacitor.
• The comparator is used to convert the saw tooth signal to exact
square pulse.
• The FSK demodulator is constructed by LM 565 phase locked
loop.
• In the 565 PLL the frequency shift is usually accomplished by
driving a VCO with the binary data signal so that the two
resulting frequencies correspond to logic 0 and logic 1 state are
commonly called the mark and space frequencies.

12/08/21 SCE 25
CONCLUSION
• The proposed system which has been designed to monitor the
transformers essential parameters continuously monitors the
parameters throughout its operation.
• The system not only controls the distribution transformer in
the distribution side by shutting it down but also displays the
values throughout the process for user reference.
• This claims that the proposed design of the system makes the
distribution transformer more robust against some key power
quality issues which makes the voltage, current or temperature
to peak.
• Hence the distribution is made more secure, reliable and
efficient by means of the proposed system.

12/08/21 SCE 26